Summary
Overview
Work History
Education
Skills
Timeline
Generic

Chevie Henderson

Phenix City,AL

Summary

Talented laborer with solid experience, teamwork abilities and understanding of safety. Competent helping teams complete work through effective materials handling, trash removal and equipment operation. Careful, efficient Lead Lineman with 2 years successfully installing equipment at job sites. Led team to exceed goal of 30,000ft installations per week. Experienced in all stages of installations. Personable Plumber possessing strong work ethic and desire to provide quality workmanship to residential customers. Experienced installer of new fixtures and piping systems for renovations.

Overview

6
6
years of professional experience

Work History

Second Chance Pole Barn

Brian Couch
05.2022 - Current
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Worked with contractors and other tradespeople to meet project specifications and deadlines.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Operated power equipment to move materials and promote job efficiency.
  • Installed drywall, flooring and other interior finishes to create finished and functional living and work spaces.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Observed safety regulations on job sites to minimize accidents.
  • Followed blueprints and diagrams to complete projects according to specifications.
  • Dug trenches and set up forms to specified requirements for concrete pours.
  • Assembled and disassembled scaffolding and ladders to guarantee safety of workers while performing tasks at heights.
  • Used variety of hand and power tools to complete tasks.
  • Assisted in constructing roads, bridges and other infrastructure projects to respond to economic, fiscal and environmental changes.
  • Conducted daily site inspections to identify potential safety hazards.

Southeastern Aerial

Austin Ezell
06.2021 - 08.2022
  • Complied with legal regulations and company procedures to achieve high-quality performance in safe working environment.
  • Strung cables between structures and lines from poles, towers, or trenches and pulled lines to proper tension.
  • Set ground anchors and guying systems for utility poles.
  • Inspected and tested lines or cables, recording and analyzing test results to assess transmission characteristics and locate faults or malfunctions.
  • Measured pole attachments and completed proper fitting and construction according to NESC guidelines.
  • Analyzed preparation documents to correctly set up installations at job sites.
  • Accessed specific service areas to string lines and install terminal boxes, auxiliary equipment, or metering appliances.

Faith Mechanical

Paul Cadenhead
03.2018 - 04.2020
  • Repaired plumbing systems, components, and equipment.
  • Installed valves, hangers, supports, and flanges inside piping systems.
  • Complied with state plumbing codes throughout duration of each project.
  • Measured, threaded, and cut materials to correct angles.
  • Implemented maintenance and repair for fixtures, water mains, natural gas, fire systems and backflow preventers.
  • Communicated with customers to provide recommendations on repairs, determine project estimation costs and define project completion dates.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Filled pipe systems with water and air to determine location of leaks.
  • Selected type and size of piping required for each project.
  • Read blueprints to determine appropriate materials and procedures for each project.
  • Independently worked on projects, while offering process coordination and cooperation with other teams.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Inspected sewers and piping systems to assess quality and condition.
  • Offered guidance and training to junior team members.
  • Interpreted blueprints to determine locations, quantities, and sizes of materials required.

Education

High School Diploma -

Smith Station High School
Smith Station
05.2016

Skills

  • Pipefitting Processes Expertise
  • Air and Water Piping Systems
  • Residential Plumbing
  • Equipment Operation
  • Hand Tool Operations
  • Standard Operating Procedures Understanding
  • Setting Poles
  • Customer Satisfaction

Timeline

Second Chance Pole Barn

Brian Couch
05.2022 - Current

Southeastern Aerial

Austin Ezell
06.2021 - 08.2022

Faith Mechanical

Paul Cadenhead
03.2018 - 04.2020

High School Diploma -

Smith Station High School
Chevie Henderson