Carpentry professional with 20+ years of experience in finish carpentry, cabinet installation, and building renovation. Executes precise measuring, cutting, and fitting for trim, doors, and built-ins. Maintains consistent craftsmanship supported by efficient material handling and accurate layout work.
Work History
Carpenter
6 Months
Robert Neal | Jacksonville, Oregon | 04.2026 - 10.2026
Performed rough carpentry and finish carpentry duties across various projects.
Applied carpenter hand tools, portable power tools, and standard measuring instruments for accurate work.
Restored damaged wood structures on Robert Neal job sites.
Coordinated material loading, job setup, and tool preparation to support daily field operations.
Finish Carpenter
2 Years 3 Months
Josh Ardaiz | Talent, OR | 01.2024 - 04.2026
Installed and finished wood trim, doors and cabinets for new construction and renovation projects.
Installed doors, casing, and baseboards with accurate alignment.
Installed trim items such as doors, windows, mantels, cabinets, and hardware.
Fit cabinets and built-ins.
Measured and cut trim pieces for Josh Ardaiz finishing projects.
Completed custom woodwork for customers based on specifications.
Construct frameworks for doorways or window frames from wood pieces by measuring accurately and joining pieces with nails or screws.
Installed finished products such as cabinetry fixtures, shelves, and molding in homes, offices, stores, and restaurants.
Maintained high standards of workmanship with accurate, detail-oriented finishing work.
Used hand tools and power tools safely on job sites.
Carpenter
11 Months
Mark Christy | White City, Oregon | 02.2023 - 01.2024
Installed drywall, framing, insulation, cabinetry, countertops and trim.
Repaired framing, drywall, and trim for residential remodel projects.
Measured spaces and marked layouts for accurate remodel work.
Inspected finished surfaces for fit, alignment, and clean appearance.
Removed old flooring, cleaned subfloors, and repaired uneven areas before installation.
Coordinated material deliveries and organized tools at job sites.
Communicated with homeowners about project needs and work schedules.
Installed carpet, tile, vinyl, and hardwood flooring for residential and commercial sites.
Framer
1 Year 1 Month
Justin Earp | Eagle Point, Oregon | 01.2022 - 02.2023
Assembled stud, header, and sill framework for wall construction.
Constructed trusses and rafters according to project specifications and framing plans.
Set framing members to plumb, level, and square to support precise structural alignment.
Installed sheathing, subflooring, and structural supports to advance framing progress on site.
Interpreted blueprints and converted wall layout requirements into accurate lumber measurements and cuts.
Prepared lumber to exact dimensions using hand saw, power miter saw, or radial arm saw for framing work.
Reviewed framed sections for code compliance and safety standards before follow-up work.
Coordinated framing work and field activities while applying Justin Earp project requirements.
Framing/Siding
3 Years
PMCI | Central Point, Oregon | 01.2019 - 01.2022
Completed exterior remodeling work through installation of vinyl, fiber cement, and wood siding.
Produced proper panel fit by measuring walls, cutting materials, and aligning framing and trim.
Added house wrap, flashing, and moisture barriers to protect siding installations.
Produced code- and spec-compliant work by following blueprints and job details for residential and commercial exteriors.
Strengthened weather resistance by installing flashing around windows, doors, and other wall openings.
Improved jobsite access by building scaffolding and setting ladders for higher exterior sections when needed.
Maintained safe tool use while handling levels, saws, nail guns, and other installation equipment.
Coordinated with supervisors and crew members to keep installation work moving.
Completed daily responsibilities accurately and efficiently.
Worked with diverse coworkers to address product and service issues.