Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

David Herrera Jr. *Toro*

Sweeny,TX

Summary

I have 25 years of experience providing customers with high quality concrete projects. Practiced at preparing site and pouring concrete. Expert at maintaining safety and completing work accurately and in a timely manner while following procedures and instructions. As of 2018 i have been the owner of Toro's Concrete. My clients have always been happy with my work and have referred me to many other clients. My certifications include Safety Osha card 30, TWIC, NCCER plus, leadership trained, completed safety courses, concrete estimation, concrete equipment, planning and deciding, permit processing, problem solving, PPE used, team leadership, dependable and hardworking.

Overview

25
25
years of professional experience

Work History

General Foreman

Baker Construction
01.2023 - 08.2024
  • Ensured compliance with all relevant regulations and industry standards during the execution of assigned tasks, mitigating potential legal issues or penalties.
  • Analyzed blueprints to determine where to run wires, install electrical outlets and connect wires to central circuit panels.
  • Contributed to company growth by consistently delivering exceptional results, leading to repeat business opportunities from satisfied clients.
  • Maintained cost-effective inventory of spare parts to help achieve production goals.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.

General Foreman

Patriot
07.2022 - 01.2023
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
  • Collaborated with subcontractors for seamless coordination of work scopes, ensuring smooth project execution from start to finish.
  • Ordered necessary supplies and materials required for installation of new work and remodeling of existing systems.
  • Kept teams properly supplied with materials, tools, plans and supplementary assistance to meet project deadlines.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Conducted thorough risk assessments before commencing projects, identifying potential challenges and developing contingency plans accordingly.
  • Assigned daily duties to each employee based upon individual strengths, effectively completing [Number]% of roofing jobs on time.
  • Established open lines of communication with clients, providing regular updates on project status and addressing concerns promptly.

General Foreman

CBI
02.2018 - 01.2020
  • Supported construction and extraction workers to facilitate timely completion of projects.
  • Created and implemented plans to maximize efficiency of workers.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Sourced suppliers and purchased necessary materials for work.
  • Supervised training of new construction and extraction workers on safety practices and procedures.

Concrete Finisher Foreman

Kewitt
03.2016 - 12.2017
  • Assisted in the development of competitive bids for new projects by providing input on labor estimates, material costs, and timelines based on past experience.
  • Solved complex problems related to formwork design or ground conditions through creative solutions while maintaining quality standards.
  • Achieved consistent client satisfaction through close attention to detail when executing various concrete finishes according to specifications.
  • Resolved conflicts among team members promptly to maintain a positive working environment conducive to productivity and quality workmanship.

Concrete Finisher / Multicraft

Brena's Concrete
04.2010 - 01.2016
  • Set wood and other forming materials to prepare for concrete pours.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Demolished and repaired old concrete surfaces.
  • Mixed, spread, and patched concrete to specifications.
  • Demonstrated versatility by successfully completing various types of concrete projects, including residential, commercial, and industrial applications.
  • Reduced material wastage through effective use of leveling, screeding, and concrete smoothing techniques.

Concrete Foreman

TIC
10.2006 - 12.2009
  • Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
  • Applied concrete fabrication techniques to achieve desired project specifications, quality, and code standards.
  • Established strong relationships with suppliers, ensuring timely delivery of materials at competitive prices.
  • Adapted quickly to changing project parameters, ensuring that deadlines were met despite unforeseen challenges or alterations in scope.
  • Cultivated a positive work atmosphere by fostering open communication, teamwork, and mutual respect among crew members, leading to higher overall morale and job satisfaction.
  • Ensured timely project completion through effective delegation of tasks and close monitoring of progress.

Concrete Foreman

PCL Industrial Constructors
06.2005 - 08.2006
  • Met with engineers to plan layouts and timeframes for jobs.
  • Created specific finishes on poured concrete.
  • Mentored junior crew members, providing hands-on guidance in various concrete techniques and reinforcing their knowledge of industry standards.
  • Adapted concrete pouring and mixing plans to daily weather and climate.
  • Coordinated effectively with subcontractors for seamless integration into larger construction projects.

Concrete Finisher

Zachry Group
03.2002 - 04.2005
  • Shoveled materials such as dirt, gravel, and asphalt.
  • Created specific finishes on poured concrete.
  • Wore correct clothing and protective equipment for jobs.
  • Routinely lifted and moved items weighing up to 80 pounds.

Concrete Finisher

Cajun Constructors Inc.
01.2000 - 01.2002
  • Set wood and other forming materials to prepare for concrete pours.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Demolished and repaired old concrete surfaces.
  • Mixed, spread, and patched concrete to specifications.

Education

GED -

Sweeny High School
Sweeny, TX
05.1999

Skills

I have the knowledge to operate skid steer, front end loaders, dump truck, trackhoe, mini excavator, forklift, trowel machine, ride on trowel machine, magic screed, 3D laser screed machine, soft cut saw machine, and concrete chute I have the know how to form up and tie rebar to begin the pouring process I have all the experience required to operate all the necessary hand tools As a foreman and General foreman i maintained the safety and and efficiency of my crew I ensured all tools were used correctly and safely I was able to keep deadlines given to me and insure my crew upheld industry standards

Languages

Spanish
Native or Bilingual

Timeline

General Foreman

Baker Construction
01.2023 - 08.2024

General Foreman

Patriot
07.2022 - 01.2023

General Foreman

CBI
02.2018 - 01.2020

Concrete Finisher Foreman

Kewitt
03.2016 - 12.2017

Concrete Finisher / Multicraft

Brena's Concrete
04.2010 - 01.2016

Concrete Foreman

TIC
10.2006 - 12.2009

Concrete Foreman

PCL Industrial Constructors
06.2005 - 08.2006

Concrete Finisher

Zachry Group
03.2002 - 04.2005

Concrete Finisher

Cajun Constructors Inc.
01.2000 - 01.2002

GED -

Sweeny High School
David Herrera Jr. *Toro*