Crew Leader
ReBuild
Waldwick, NJ
05.2017 - 03.2022
- Trained employees to complete job duties. Discussed daily work requirements with crew and assigned skill-based tasks to enable completion of work
- Trained new staff on initial setup routines and continual work monitoring procedures
- Conducted final work check to assess quality and make corrections if necessary
- Interpreted blueprints and schematics to determine locations, quantities and sizes of materials required. Calculated accurate amounts of materials and estimated time for planned jobs
- Primed and sealed surfaces to best support paint coats
- Installed, repaired and altered piping systems, plumbing fixtures, traps and soil waste and vent pipes, including cementing and welding to finalize high-quality piping systems
- Operated drill motors, grinders, chop saws, hack saws and burning torches to perform tasks
- Communicated with customers to provide recommendations on repairs, determine project estimation costs and define project completion dates. Interacted with clients to report progress and verify timetable for completed work
- Ordered necessary supplies and materials required for installation of new work and remodeling of existing systems
- Leveled surfaces using plywood and mortar prior to laying marble and tile. Used power wet saws and tile cutters to cut tiles to specifications. Placed marble and tiles into place using spacers to achieve proper spacing for grout application.
- Repaired light fixtures, controls, switches, relays and circuit breaker panels based on detailed evaluations and installed light fixtures in existing structures and new construction
- Supervised end-of-day cleanup activities to remove debris and unnecessary supplies from customer premises
- Built and hung custom doors and frames.
- Cut and installed insulation for residential and commercial buildings
- Installed drywall, ceilings, trim and fabricated replacement trim and moldings
- Followed protocols and stayed organized to provide personal and teammate safety