With a proven track record at Pacific Underground Construction, I excel in underground and commercial construction management, blending heavy equipment operation with exceptional team leadership. My expertise in ensuring project compliance and enhancing safety protocols has consistently surpassed project goals, demonstrating a 100% commitment to quality and efficiency.
Overview
25
25
years of professional experience
1
1
Certification
Work History
Underground Foreman
Pacific Underground Construction
San Jose, CA
01.2018 - Current
Ensured timely completion of projects by monitoring daily progress reports and adjusting plans as needed.
Managed budgets effectively by tracking expenses diligently, avoiding cost overruns on multiple projects.
Established strong working relationships with regulatory agencies, ensuring compliance with all relevant legal requirements during project execution.
Mitigated environmental impacts of mining activities by implementing best practices for waste management and conservation efforts.
Maintained up-to-date knowledge of industry standards, adhering to all regulations during installations and repairs.
Implemented innovative techniques in rigging operations resulting in reduced installation times while maintaining safety standards.
Maintained safety standards by rigorously following industry protocols and guidelines during pipe installations.
Maintained clear communication with clients throughout the installation process, addressing any concerns or issues that arose.
Maintained a clean and organized work environment, allowing for efficient workflow during installations.
Oversaw successful installation of high-value projects, maintaining strict quality control measures.
Resolved any installation issues promptly, maintaining positive relationships with customers and vendors alike.
Adapted watering and maintenance schedules based on weather and property events, alerting employees and supervisors of changes.
Consistently met performance targets while maintaining a strong focus on quality control during installations.
Maintained high level of safety when using hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
Ensured compliance with local health department regulations to maintain high-quality water conditions at all times.
Improved customer satisfaction with efficient installation and maintenance of equipment.
Assisted with emergency response efforts, mitigating damage caused by water main breaks or other incidents.
Coordinated with contractors during construction projects to minimize impact on existing water distribution services while maintaining safety standards at all times.
Mitigated potential hazards through strict adherence to safety protocols during all aspects of instrument installation, maintenance, and repair.
Maintained accurate documentation of all equipment installations, ensuring proper record-keeping and easy access for future reference.
Adapted quickly to new technologies in the field, staying current with industry trends and best practices in fiber optics installation and maintenance.
Managed on-site and off-site installation, repair, maintenance, and test tasks.
Maintained a safe work environment, adhering to safety guidelines and protocols during installations.
Maintained detailed installation records for customer and company use.
Mentored new hires, sharing best practices in installation techniques and equipment maintenance procedures.
Maintained a clean and organized work site, effectively mitigating potential hazards during installation projects.
Underground Foreman / Paving Foreman
Northern Underground Construction
San Jose, CA
06.2010 - 01.2018
Ensured timely completion of projects by monitoring daily progress reports and adjusting plans as needed.
Managed budgets effectively by tracking expenses diligently, avoiding cost overruns on multiple projects.
Reduced accidents and injuries by enforcing strict adherence to safety guidelines and regulations.
Enhanced underground safety by implementing rigorous inspections and maintenance protocols.
Developed comprehensive contingency plans to address unforeseen challenges during underground construction projects.
Improved communication among crew members with daily briefings, resulting in better teamwork and coordination.
Conducted thorough site assessments to identify potential hazards and develop appropriate risk mitigation strategies.
Optimized productivity through regular equipment maintenance checks, minimizing downtime due to malfunctions or breakdowns.
Streamlined project timelines by coordinating equipment usage and personnel assignments effectively.
Improved overall operational efficiency through constant evaluation of processes, identifying areas for improvement and implementing necessary changes.
Fostered a positive work environment that promoted open communication channels, leading to increased employee morale and retention.
Maintained high-quality standards on all projects through continuous training and performance evaluations for team members.
Increased efficiency in excavation projects by optimizing work schedules and resource allocation.
Contributed to the success of the company''s long-term objectives through consistent performance, teamwork, and commitment to excellence.
Established strong working relationships with regulatory agencies, ensuring compliance with all relevant legal requirements during project execution.
Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
Checked equipment to determine if maintenance was required.
Reviewed project details to specify correct materials and equipment for job sites.
Oversaw daily operations at site, keeping team production moving at optimal pace.
Trained workers in proper methods, equipment operation and safety procedures.
Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
Prepared and submitted reports on job progress and safety conditions to upper management.
Created and implemented plans to maximize efficiency of workers.
Administered disciplinary actions to workers violating safety regulations and company policies.
Investigated and reported on accidents, injuries and near-miss incidents.
Lead Pipe Layer
Pacific Underground Construction
San Jose, CA
02.2003 - 05.2010
Enhanced productivity by streamlining pipe laying processes and utilizing efficient tools.
Managed equipment maintenance schedules, reducing downtime due to mechanical issues and ensuring optimal performance.
Moved pipe into trenches and layered pipe in trenches to help initial backfill.
Contributed to company growth by providing consistently high quality work and earning a reputation for reliability among clients.
Operated heavy machinery for excavation purposes while maintaining exceptional safety standards.
Monitored fellow workers to promote safety and productivity.
Installed and repaired wet and dry utility pipe, sanitary and storm water sewer structures and pipe systems.
Maintained thorough documentation throughout the course of each project including daily progress reports detailing tasks completed.
Utilized advanced surveying techniques for precise alignment of pipes in accordance with design specifications.
Coordinated with contractors, engineers, and site supervisors to ensure smooth execution of pipe laying projects.
Utilized appropriate materials and tools to connect pipe pieces and seal joints.
Developed strong relationships with suppliers, resulting in timely delivery of materials at competitive prices.
Adapted quickly to changing project requirements or unexpected challenges in order to maintain progress towards completion deadlines.
Trained new team members on proper pipe laying techniques, improving overall team efficiency and quality of workmanship.
Completed projects within budget by closely monitoring expenses and making cost-effective decisions.
Collaborated with utility companies to identify locations of existing underground infrastructure, preventing damage during excavation process.
Assembled pipes to pass required pressure tests.
Ensured accurate pipe measurements, leading to minimal waste and reduced material costs.
Increased safety on job sites by enforcing strict adherence to OSHA regulations and conducting regular safety meetings.
Pipe Layer
McGuire and Hester
Oakland, CA
08.1999 - 08.2002
Assembled and installed underground pipe, fittings, and valves of various sizes.
Used hand signals to direct equipment operators and alert to hazards.
Enhanced workplace safety by consistently following standard operating procedures and wearing appropriate personal protective equipment.
Handled all repairs for sanitary and storm water sewer structures and pipe systems.
Demonstrated strong problem-solving abilities by addressing unexpected complications during pipe installation processes.
Observed all safety measures and company equipment policies to prevent job site accidents.
Reduced project delays by promptly identifying and resolving issues with pipe alignment and connections.
Education
High School -
San Benito High School
Hollister, CA
Skills
Underground Construction
Heavy Equipment Operation
Confined Space Entry
Hazardous Materials Handling
Material Procurement
Environmental awareness
Excavation Techniques
Labor Relations
Geotechnical Knowledge
Teamwork and Collaboration
Attention to Detail
Worksite safety
Construction supervision
Workplace Safety
Critical Thinking
Dedicated Work Ethic
Site coordination
Safety policies and procedures
Effective Communication
Crew Leadership
Site Inspection
Schematics and Blueprints
Construction Vehicles Operation
Work Planning and Prioritization
Dimensions and Measurements
Employee Training
Project Leadership
Technical knowledge
Staff Management
Job Planning
Task Delegation
Materials Management
Safety oversight
Quality Control
Interpersonal and written communication
Project deadlines
Project Management
OSHA Compliance
Subcontractor Management
Blueprint Interpretation
OSHA Regulations
Residential construction
Project Planning
Daily Reporting
Commercial construction experience
Crew Scheduling
Production and processing
Construction management
Workforce Management
Raw materials
Equipment Oversight
Contract Management
Dependable and Hardworking
Problem-Solving
Time Management
Following Instructions
Problem-solving abilities
Multitasking
Multitasking Abilities
Construction safety
Reliability
Excellent Communication
Worker Supervision
Organizational Skills
Accomplishments
Bascom Rd - 16” Dicl water main replacement (SJW)
Old Santa Cruz highway 16” Dicl and EHP water main and Scada line replacement (SJW)
16” C900 water main replacement Menlo Park (city of Menlo)
16” Dicl “Villa” water main replacement Los Gatos (SJW)
16 “ c900 Soquel Ave water main ( Soquel water)
18” Dicl Cumberland water main replacement (SJW)
Certification
Confined space
component person certified
Additional Information
I do all my own layout. All flushing and sampling. All ordering of material . I have tons of reference I can give if needed