Summary
Overview
Work History
Education
Skills
Timeline
Generic

Chris Werner

Sherman,TX

Summary

Driven and experienced electrical professional with a strong passion for the industry. Skilled in a wide range of electrical systems, from low-voltage controls to 138KV. Seeking a long-term opportunity with a reputable company where I can contribute my expertise and grow toward retirement.

Overview

11
11
years of professional experience

Work History

HV Team Lead

Texas Instruments
10.2022 - Current
  • Managed execution of switching, preventive maintenance, and corrective maintenance without site disruption.
  • Executed stringent adherence to safety guidelines.
  • Coordinated maintenance activities to achieve peak efficiency.
  • Investigated manufacturing guidelines, NETA standards, and Federal regulations to develop a maintenance strategy.
  • Oversaw commissioning and installation of the new Sherman, TX semiconductor plant.

Estimator

All Tech Electric
09.2021 - 10.2022
  • Conducted thorough specification review.
  • Constructed job setups and integrated data into Accubid.
  • Composed proposal documents detailing both exemptions and inclusions.
  • Partnered with GC to ensure clarity through breakout sessions.

Project Manager

CEC Facilities Group
01.2014 - 09.2021
  • Created job budgets and cost codes for precise financial tracking.
  • Conducted routine field inspections aiding superintendent in assessing job status.
  • Streamlined vendor agreements to minimize overall project expenditures.
  • Developed structured schedules to ensure consistent progress.

Education

Substation Maintenance-2 -

Shermco Industries
Dallas, TX
01.2023

Doble Technician -

Doble Engineering
Dallas, TX
12.2022

Substation Maintenance-1 -

Shermco Industries
Dallas, TX
01.2022

Course Graduate - Electrical And Controls

Independent Electrical Contractors
Irving, TX
06.2018

Skills

  • Planning and tracking
  • Detail oriented
  • Self motivated
  • Maintaining operational reliability
  • NETA, NFPA, NEC, OSHA knowledge

Timeline

HV Team Lead

Texas Instruments
10.2022 - Current

Estimator

All Tech Electric
09.2021 - 10.2022

Project Manager

CEC Facilities Group
01.2014 - 09.2021

Substation Maintenance-2 -

Shermco Industries

Doble Technician -

Doble Engineering

Substation Maintenance-1 -

Shermco Industries

Course Graduate - Electrical And Controls

Independent Electrical Contractors
Chris Werner