Summary
Overview
Work History
Skills
Timeline
Generic

Christopher Barnes

San Mattin,CA

Summary

Proactive and goal-oriented professional with excellent time management and problem-solving skills. Known for reliability and adaptability, with swift capacity to learn and apply new skills. Committed to leveraging these qualities to drive team success and contribute to organizational growth.

Overview

8
8
years of professional experience

Work History

Installer

JB Services
09.2016 - 01.2025
  • Operated heavy machinery including forklifts and excavators to support construction projects.
  • Collaborated with team members to ensure safety protocols were followed on job sites.
  • Assisted in framing, drywall installation, and finishing tasks for residential buildings.
  • Maintained tools and equipment, ensuring proper functionality and compliance with safety standards.
  • Conducted site clean-up activities to promote efficiency and maintain a safe working environment.
  • Implemented best practices in material handling to reduce waste and optimize resources.
  • Mentored junior workers in construction techniques and adherence to safety regulations.
  • Coordinated with subcontractors to facilitate timely project completion and quality assurance.
  • Conducted regular inspections of job sites to ensure adherence to quality standards, identifying areas for improvement or correction as needed.
  • Assisted in the planning and execution of various construction projects, ensuring successful completion and client satisfaction.
  • Utilized strong problem-solving skills to address unforeseen issues during construction, minimizing delays and additional costs.
  • Efficiently prioritized tasks according to project needs, ensuring deadlines were consistently met without compromising quality standards.
  • Improved workplace safety by implementing and enforcing strict safety guidelines and procedures.
  • Demonstrated proficiency in various construction tools and equipment, contributing to high-quality workmanship on every project.
  • Streamlined communication between team members, resulting in more efficient use of time and resources.
  • Enhanced project efficiency by coordinating tasks and effectively managing construction teams.
  • Achieved high levels of customer satisfaction through consistent professionalism and dedication to delivering quality work on every project.
  • Contributed to a positive work environment by fostering teamwork among colleagues and promoting open communication channels.
  • Mentored junior staff members, sharing expert knowledge in general construction techniques for their professional growth.
  • Increased client satisfaction by providing timely updates on project progress and addressing concerns promptly.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Operated power equipment to move materials and promote job efficiency.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Assisted with basic carpentry work such as installing wooden floors and crown molding.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Installed new structures, updated systems and replaced worn components to bring buildings up to current codes.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Loaded and unloaded materials onto trucks and trailers.
  • Installed drywall, siding and other structural components.
  • Cleaned and maintained tools, equipment and worksites.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Provided labor support to carpenters, masons and other skilled trades.
  • Used variety of hand and power tools to complete tasks.
  • Assisted in digging, trenching and backfilling trenches and foundations.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Mixed and poured concrete for variety of projects.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Finished surfaces of woodwork or wallboard in houses and buildings with paneling, paint and hand tools.
  • Worked on sites, installing roofs and other exterior components.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Helped with door and window installations.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Helped with erecting scaffolding and ladders.
  • Inspected tools and equipment to maintain safety and efficiency.
  • Operated and maintained underground utility excavation equipment for optimal performance and safety.
  • Executed installation and repair of utility lines, ensuring compliance with industry standards.
  • Coordinated with local authorities for permitting and compliance related to underground utility projects.
  • Led troubleshooting efforts during emergencies, restoring services promptly while adhering to safety regulations.
  • Manually operated water utility filters, pumps, valves, sludge systems and chemical feed systems.
  • Used hands or valve operating machines to open and close main valves to perform water main extensions or repairs.
  • Observed operation of water pumps, electric motors and chemical feed machines by reading various charts, graphs, gauges and meters.
  • Planned and performed preventive maintenance on engines, motors, pumps, controls and chemical feed systems.
  • Responded to service requests during and after business hours.

Skills

  • Attention to detail
  • Time management
  • Positive attitude
  • Power tool operation
  • Following safety practices
  • Customer service
  • Customer satisfaction
  • Pre-installation site prep
  • Equipment installation
  • Equipment operation
  • Customer relations
  • Troubleshooting and testing
  • Worksite preparation
  • Worksite safety and maintenance
  • Quality checks
  • Blueprint reading
  • Hardware installation
  • Professional appearance
  • Safety procedures
  • Inventory accountability
  • Hand-eye coordination
  • Quality assurance
  • Preventive Maintenance
  • Installation updates
  • Inventory oversight
  • Residential construction
  • Product inspection
  • Flooring
  • Construction management
  • Work orders
  • Electrical wiring
  • Diagnostics and troubleshooting
  • Attention to detail
  • Residential and commercial installations
  • Company vehicle maintenance
  • Drywalling
  • Scheduling
  • Plumbing
  • Welding skills

Timeline

Installer

JB Services
09.2016 - 01.2025
Christopher Barnes