Strong leader and problem-solver dedicated to streamlining operations to decrease costs and promote organizational efficiency. Uses independent decision-making skills and sound judgment to positively impact company success.
Overview
43
43
years of professional experience
Work History
Material Manager- Operations
IMPACT AUTOMATION
01.2023 - Current
Manager of Operations, Manufacturing, Purchasing, Receiving/Shipping and Quality
Implemented a design control release process for releasing of both documents and technical drawings
Managed multiple warehouse facilities and implemented procedures and policies to have more visibility of parts coming in and getting kitted for site installations
Part of team that presented critical audits to customers as well as conducted audits to key vendors
Eleven direct reports that spanned multiple groups
Automation Manager 1
MESO SCALE DIAGNOSTICS, LLC
01.2013 - 01.2023
Part of the leadership of 15 people for the Automation Group that designs, fabricates, test, and validates Automation Equipment utilized for internal use
Direct report of five team members (Engineers and Project Engineers)
Managed key projects with emphasis on purchasing, BoM creation and management, inventory control and kitting, timeline management, production problem solving, and documentation close out
Implemented a documentation approval system to ensure highest quality
Implemented and maintained an inventory system to reduce loss and misplace parts
Worked to improve vendor relations and bring in new vendors to reduce lead time and project cost
Participated in Design Reviews for new system designs and upgrades
Mechanical Engineer II
MESO SCALE DIAGNOSTICS, LLC
01.2013 - 01.2023
Responsible for mechanical design, testing, and documentation on multiple Instrumentation projects
Facilitator for Design Control on Instrumentation Engineering
Lead for weekly status meetings on documentation and change control
Well versed in MasterControl, JDE, SolidWorks and PDM
Created and established relationships with vendors for on-time delivery and high quality
Administrator for SolidWorks platform used by Engineering Group
Key person on implementation of SolidWorks Inspection into Quality Control
Mechanical Engineer I
MESO SCALE DIAGNOSTICS, LLC
01.2013 - 01.2023
Gatekeeper of Bill of Materials for new projects in Instrumentation Group
Facilitator for Design Control on Instrumentation Engineering
Project lead for obtaining quotes and creating orders for all parts required for pre-production systems
Primary liaison between Engineering and Manufacturing, Purchasing, and Document Control
Configuration Specialist - Instrumentation
MESO SCALE DIAGNOSTICS, LLC
01.2013 - 01.2023
Manage the implementation of all Instrumentation Production Changes
Communicated directly with multiple groups within company for resolving concerns with change orders
Maintained expected timelines on implementation of change orders
Well versed in JDE, MasterControl, and SharePoint
Project / Program Manager
ENGINEERED SYSTEMS & PRODUCTS
01.2005 - 01.2012
Program and Project lead for all USPS Postal Programs including AI and FSS programs for approximately $40 million dollars of revenue
Responsible for Proposal Generation and Negotiations, defining of Scope of Supply, Purchasing, Material Control, Documentation Control, Manufacturing, Project Scheduling, Quality, and Shipping
Implemented World Class Manufacturing for long term programs
Established relationships with key vendors for on-time delivery, maintain program pricing, and highest quality
40 – 60 direct reports
Startup of and maintained ISO certification
ISE Configuration Support
NORTHROP GRUMMAN
01.2004 - 01.2005
Assist with the development of the BOM and product structuring with Engineering
Establish and maintain relationships with parts vendors on supplied technical documentation for new parts requests
Data input and ISE coordination for Postal Programs (AI and FSS)
Field Support Supervisor
VARIAN INC.
01.2003
Managed day-to-day activities for the Midwest support operations (twelve Field Engineers) including installations, repairs, and training
Generation of repair and upgrade proposals based on the customer’s requests and needs
Marketed and promoted service contracts to the customer
Preparation of yearly budget for the group
Maintained sales support for room/system configuration, utilities requirements, maintaining scheduling, and continued high customer satisfaction
Project Engineering Manager
OXFORD INSTRUMENTS
01.1999 - 01.2002
Reported directly to the President of the Process Systems Division of Oxford Instruments
Responsibilities included review of configuration and RFQ’s, preparation of proposals, engineering customization for customer’s requirements, generation and standardization of bills of materials, documentation, and technical support to Manufacturing and Engineering
Project scheduling, financial, and technical support to all departments including Manufacturing, Engineering, Field Support, and Documentation Control
Implementation of 3-D modeling engineering package (SolidWorks) into project engineering to reduce manufacturing lead times and increase productivity
This included development of part numbering system and assembly structuring
Coordinated technical change orders between customer and manufacturing / engineering teams
Main communication link to customer on revised pricing, delivery times, and scope of supply
Supervised eight Customer Service and Engineering personnel in the United States and England
This included evaluation of individual performance and team building
Project Manager
OXFORD INSTRUMENTS
01.1999 - 01.2002
Selected as one of over two hundred former Auburn International employees for employment in the United Kingdom on relocation and startup of the on-line instrumentation product line
Responsible for worldwide effective project management including budget, scheduling, bidding review, proposal generation, application and technical analysis
Also worked on installation and start up assistance which resulted in eliminating delays and difficulties in engineering, manufacturing and commissioning
Initiated and maintained communications between Sales, Engineering, Manufacturing, Field Support, and the customer to ensure 100% project success
Provided technical assistance pre and post sales including customer site visits
Direct international exposure with the Europe and Asia marketplace
Project Manager
AUBURN INTERNATIONAL
01.1987 - 01.1999
Managed yearly revenue of $4,000,000 in on-line NMR and Mass Flow process control equipment projects from sales conception to installation at customers’ plant facility
Responsible for worldwide project management, which included budgeting, scheduling, bidding review, proposal generation, application and technical analysis, installation, and start up assistance
Generated detailed scope of supply for each project
Assisted in the cost research, pricing structures, and delivery time estimates for project specifics
Revised project updates to reflect customers’ engineering changes to maximize project profit margins
Field Services Manager
AUBURN INTERNATIONAL
01.1987 - 01.1999
Established all worldwide field support for the Magneflow and Correflow product lines
Directed day-to-day dispatching and scheduling of field service engineers coordinating with the field service administrator
Developed and implemented extensive service contract program and billing policies
Managed all documentation and support to satellite offices in Belgium, Korea, and Houston TX, including hiring of field service personnel
Developed, implemented, and directed hands-on customer training at headquarter facilities (Danvers, MA) for all Magneflow products
Identified problem accounts and determined action plan to resolve outstanding issues
Coordinated field modifications and upgrades to existing systems in the field
Field Engineer
AUBURN INTERNATIONAL
01.1987 - 01.1999
Completed installation and troubleshooting on complex instrumentation and sampling devices including mechanical, electrical, communications, and computer systems
Developed and implemented training and maintenance programs at the customer plant facilities
President- Fluid Power and Systems at Process Control Solutions, LLC dba Impact AutomationPresident- Fluid Power and Systems at Process Control Solutions, LLC dba Impact Automation
Regional Vice President at Impact Property Solutions (formerly Impact Floors)Regional Vice President at Impact Property Solutions (formerly Impact Floors)