Maintained accurate records related to projects including daily logs, time sheets, inspection reports.
Conducted regular meetings with contractors to discuss progress updates or changes in scope of work.
Ordered material as needed while adhering to budgetary constraints.
Supervised and trained a crew of laborers to ensure completion of tasks in accordance with company standards.
Performed calculations related to loads, quantities of materials needed, using computer software programs or manual methods.
Inspected formwork for accuracy prior to pouring concrete and monitored the curing process.
Ensured that all safety regulations were followed, maintained a safe work environment, and addressed any potential hazards immediately.
Assessed existing conditions at job site such as soil type or drainage issues prior to beginning construction.
Organized job sites by developing efficient systems for storing tools, supplies and equipment.
Managed all concrete construction activities on multiple projects at once.
Reviewed plans for each job before beginning work ensuring compliance with contract specifications.
Developed project schedules based on customer needs and worked closely with management team to ensure deadlines were met.
Identified potential problems which could affect quality or timeline of project then proposed solutions accordingly.
Monitored quality control during installation of reinforcing steel and placement of concrete.
Scheduled inspections with local authorities when required for approval or certification.
Coordinated with subcontractors, suppliers and vendors to ensure timely delivery of necessary materials and equipment.
Resolved conflicts between workers or disputes over jobsite protocol in a professional manner.
Provided technical guidance regarding mix designs, admixtures and techniques to optimize strength and durability of structures.
Maintained inventory levels by ordering additional supplies when needed while staying within budgetary guidelines.
Used numerous types of power tools and other equipment daily.
Positioned wire mesh and rebar to reinforce concrete.
Finished surfaces by troweling, floating and brushing following project requirements and specifications.
Poured concrete into forms using pump hose and leveled.
Loaded and unloaded necessary tools, materials, and machines from trucks and trailers.
Removed debris and waste to clean site after completing work.
Maintained safety of work areas by adhering to strict regulations.
Constructed forms to create various concrete structures.
Dismantled forms using basic and advanced tools.
Laid and repaired concrete to make level and long-lasting surfaces.
Worked with teammates to move steel forms.
Used forklifts and other equipment to move materials and complete project work with construction team.
Inspected and maintained tools and equipment.
Upheld requirements for safe operations and reporting of incidents.
Operated excavators and loaders to prepare site.
Calculated concrete quantities needed for jobs.
Placed steel pins using sledgehammer.
Compacted grade using jumping jack or plate compactor equipment.
Reviewed blueprints and other drawings to identify correct grades.
Troubleshot equipment issues and determined best courses of action for repairs.
Prepared and planned worksites to help jobs run smoothly.
Reported project progress, site problems and labor status to supervisors.
Delegated duties to employees based on skillset.
Trained and monitored employees to teach daily tasks and improve performance.
Delegated work to staff, setting priorities and goals.
Kept production team moving forward for progress in daily site operations.
Monitored project progress to enforce adherence to deadlines and quality standards.
Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
Established and enforced procedures and work standards, promoting team performance and safety.
Created work crew schedules and delegated assignments.
Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
Obtained specifications and directed work for construction crews.
Recruited and hired workers, in addition to supervising and monitoring daily performance.
Kept detailed progress records to hit strict deadlines and adjust plans.
Allocated material and labor resources to promote on-time and under-budget project completion.
Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
Defined and monitored personnel and project schedules to ensure on-time project completion.
Monitored equipment operation during extraction process to detect problems.
Business Owner/Job supervisor/All around mechanic
Bennington Concrete
Omaha
04.2020 - 01.2022
Started Bennington Concrete and snow removal company with a partner
I ran all job operations from start to finish
I also took care of all the mechanics from trucks, deisel, plows, hydraulic salt spreader and all small engine equipment
My partners responsibility was lining jobs up and taking care of the books
Other then scheduling and the books
I controlled all the day to day operations from grading to all the form prep and concrete pouring and also finding hands to help pour concrete
Most of the work Bennington Concrete performed was Residential and did a decent amount of work with sudbeck homes
I was also responsible for all snow Operations from finding shoveler's to all the plowing and salting operations
Ufortunately our partnership has come to a close
Now a new chapter in life begins.
Mechanic/Welder Fabrication/3D Laser Screed & 3D Dozer Operator/Pump & Tale Belt O Operator
Marsh Creek Concrete Inc.
Gretna
02.2014 - 05.2020
Marsh Creek Concrete I was a all around Mechanic from heavy equipment bobcats to backhoes to semi tractors to side dumps to dumptrucks to 1ton dually from gas to deisel
I was primary 3d laser screed and dozer operator
I would grade 3d parking lots with the Dozer within 1/8" of survey spec
Then I would use the same 3d grid I created to grade the lot with the dozer
I would then pour the parking lot with the Laser Screed
I also was a concrete pump operator and mechanic as well as Tela‑Belt Operator and mechanic
Also did the majority of all the welding from making ladder racks for trucks, new flatbeds
I also built the majority of there wall forum baskets that are used for holding and transport distribution to job sites
I'm very self motivated and well with problem solving or troubleshooting problems and from day to day operations.
Mechanic/3D Laser Screed Operator
J.R. Barger & Sons
Omaha
05.2007 - 01.2014
I primarily worked on and ran 3D Laser Screed
I also worked on there fleet of trucks gas to deisel
Worked on small engine equipment and bobcat to backhoes
Alot of the same work I performed at Marsh Creek.
Education
High school diploma -
Burke High School
Skills
Mechanics
Welding
Heavy machinery operator
Troubleshooting
Concrete finisher
Carpenter
Electrical
Hydraulic system
Material Ordering
Worksite Safety
Finishing Techniques
Surface Preparation
Jointers and Edgers
Bull Floats
Defect Correction
Commercial Construction Experience
Forklift Operation
Site Preparation
Trowel Machinery
Hand Tools Operation
Inventory Management
Power Tool Operation
Truck Chute Operation
Power Saws
Pitch and Depth Correction
Customer Relations
Subcontractor Coordination
Value Engineering
Custom
My Objective is to provide a good life for my family. To try something a little different and start a new chapter in my life. I've always been a hard self-motivated worker. I've never been someone who said, I can't. I always been a, yes I can do that type of man.
Timeline
Concrete Superintendent
Marsh Creek Concrete
02.2022 - Current
Business Owner/Job supervisor/All around mechanic
Bennington Concrete
04.2020 - 01.2022
Mechanic/Welder Fabrication/3D Laser Screed & 3D Dozer Operator/Pump & Tale Belt O Operator
Job Title Senior Application Systems Analyst at Metropolitan Community CollegeJob Title Senior Application Systems Analyst at Metropolitan Community College