Summary
Overview
Work History
Education
Skills
Affiliations
Certification
Timeline
Generic

Christopher J. Czerw

Albany,NY

Summary

Over 30 years of extensive experience in the transportation industry, with expertise in highway and bridge construction management and land surveying. Proficient in executing bridge rehabilitations and improvements, highway enhancements, and various surveys—including boundary, topographic, bathymetric, utility, and aerial ground control. Demonstrated success in delivering comprehensive construction project management and field-to-finish survey services. Notable projects include work at airports, industrial plants, solar farms, landfills, brownfield and superfund sites, as well as urban and rural corridor surveys for NYSDOT and National Grid. Proven ability to manage small to large-scale public and private site development projects provides a strong foundation for future endeavors in the industry.

Overview

29
29
years of professional experience
1
1
Certification

Work History

Survey Crew Chief

LaBella Associates, PC
11.2022 - Current
  • Construction Layout

Survey Crew Chief/Drafter

LaBella Associates, PC
11.2022 - Current
  • Construction Layout

Survey Crew Chief/Drafter

LaBella Associates, PC
11.2022 - Current
  • Water & Wastewater Replacement Project
  • Provided partial boundary, topographic, utility survey for 2,000± L.F. of new water and 4,000± L.F. of sanitary sewer force main construction to improve service to the industrial complex. Project also involved performing a ground control survey for the aerial lidar portion of the project as well as location of subsurface utility exploration (S.U.E.) mark-outs made by others.

Project Manager/Crew Chief/ Lead Drafter

S.Y. Kim Land Surveyor, PC
06.2016 - 11.2022
  • Project Manager: Topographic and utility pre-design survey for The Albany County Airport Authority Contract No. 930-GC Airfield Drainage Culvert Replacement. As-Built survey also performed on this project.
  • Project Manager: Topographic and utility pre-design survey for Sullivan County Airport-Runway 15-33 rehabilitation and fuel farm improvements.
  • Project Manager: Topographic and utility pre-design survey for Fulton County Airport-reconstruction of the main apron.
  • Project Manager: Topographic and utility pre-design survey for Columbia County Airport-reconstruction of the north apron.
  • Project Manager: Topographic and utility pre-design Corridor survey for The South End Connector Rail Trail-C. of Albany.
  • Project Manager: Highway boundary, topographic & utility corridor survey for sanitary sewer improvements in the Town of Moreau-Saratoga County. This 5 mile corridor survey included determining the highway boundary for both sides of the roads for the full length of project. Project also included taking over the Photogrammetry portion of project.
  • Project Manager/Crew Chief: Highway boundary, topographic and utility pre-design Corridor survey for The U.S. Route 9 Pedestrian Improvements Project-Town of Hyde Park.
  • Project Manager/Crew Chief/Lead Drafter: Topographic and utility survey for The County of Otsego IDA for redevelopment of ~180 acres of Oneonta Rail Yards for construction of a vehicular bridge for site access as well as extension of utility infrastructure and site roadways.
  • Project Manager/Crew Chief/Lead Drafter: Boundary, topographic and utility survey for the City of Gloversville Water Tank, Water main Improvement. The survey of the Water Main Improvement includes approximately 3,000 LF of roadway, as well as a Certified boundary survey of the Eagle Street Water Tank property.
  • Project Manager/Crew Chief/Lead Drafter: Boundary topographic and utility survey for the Village of Coxsackie, Wastewater Collection System service area, forcemain and gravity sewer extension and replacement. The topographic and utility survey of includes ~2,000 LF for 12” forcemain extension, and ~2,080 LF of gravity sewer as well as a full boundary and topographic survey of the Village of Coxsackie Wastewater Treatment Plant.
  • Project Manager/Crew Chief/Lead Drafter: Topographic and utility survey for the City of Cohoes Stormwater Improvements. Corridor survey included Columbia Street, Central Avenue, Sandusky Street, Newark Street and St. Rita Lane -approx. 4,500 LF (Arcadis- 2016).
  • Project Manager/Crew Chief/Lead Drafter-Pre-design surveys for numerous bridge rehab/replacement projects including but not limited to the following: CR21 Bridge over the Kayderosseras-Saratoga County, Francis St Bridge over I-890-Schenectady County, CR6 Bridge over the Hatchbrook-Hamilton County, SR29 Bridge over the Cayadutta-Fulton County

Project Manager/Crew Chief/Lead Drafter

S.Y. Kim Land Surveyor, PC
06.2016 - 11.2022
  • Topographic & utility existing conditions survey for improvements made to the 7,100± L.F. Taxiway “A”. This project involved close coordination with Airport Operations and Control Tower Operations to ensure safety, quality and production requirements were met. Results of the survey exceeded client expectations.

NICET III Construction Manager - Various Projects

Boswell Engineering
05.1997 - 06.2016
  • I-87 “Twin Bridges” over the Mohawk River - superstructure and substructure bridge replacements/improvements. Work was performed continuously on weekends with the aid of a crossover and required both NB & SB lanes to be opened Monday mornings.
  • I-90 - Dunn Memorial Bridge eastbound to Exit 11 mill & fill paving including on and off ramps.
  • I-89 (Vermont) NB & SB bridges over the White River - superstructure and substructure bridge replacements/improvements. Crossovers were utilized for the construction season for this 2 yr. project.
  • I-89 (Vermont) NB & SB - mill & fill paving for a total of 22 miles near Montpelier and Barre.
  • NYS Route 44/55 – replacement of (3) bridges along this corridor between New Paltz and Kerhonkson.
  • Inspector acting for TDE - multiple municipal projects for the Town of Guilderland, City of Menands & Saratoga County Sewer District No. 1.

Survey Crew Chief/Drafter

Boswell Engineering
05.1997 - 05.2016
  • FedEx Ground Hub Facility
  • Responsible for the initial boundary/topographic/utility survey of the 70± acres former Albany International Corporation. Land was subsequently conveyed to Federal Express for design of their new hub at this location. Provided the client construction layout and an As-Built survey of record upon completion.

Project Manager - Lafarge, NA Cement Plant

Boswell Engineering & S.Y. Kim Land Surveyor, PC
05.1997 - 06.2016
  • As Survey Crew Chief, provided monthly and/or quarterly stockpile inventory volumes for 10 years for submittal to the federal government as required under the Dodd-Frank Act of 2008. Subject stockpiles included coal, clinker, bauxite, gypsum, iron, fly ash and aggregates from their quarry.
  • Additionally contracted as Survey Crew Chief to perform yearly topographic surveys of Cement Kiln Dust (C.K.D.) landfill “D” for the purpose of monitoring its growth and maintaining proper environmental pollution control measures. Occasional topographic surveys of the other closed landfills performed for monitoring purposes.

Survey Crew Chief

Boswell Engineering - S.U.N.Y Old Westbury College
05.1997 - 06.2016
  • Boundary Survey
  • As Survey Crew Chief provided boundary survey services within specified tolerances for the full 350± acre facility.

Survey Crew Chief

Boswell Engineering -Clinton Correctional Facility
05.1997 - 06.2016
  • Topographic & Utility Survey
  • As Survey Crew Chief and Instrument Person, provided the NYSOGS with the first comprehensive planimetric and utility digital mapping of the full facility. Project was performed over a 2yr. span during which time all buildings, roads, sanitary & storm sewers, domestic and fire suppression water distribution systems, heat tunnels and open space was digitally mapped for use in future improvement projects at this facility.

Education

A.A.S. - Civil Engineering Technology

Hudson Valley Community College
Troy, NY
01.1993

Skills

  • Project management
  • Project planning
  • Project planning and development
  • Project scheduling

Affiliations

  • Former Member Eastern New York Society of Land Surveyors (ENYSLS)
  • Served on the ENYSLS Board of Directors as an Associate Member from 2009-2015.

Certification

M.S.H.A. Certified Safety Trainer

Timeline

Survey Crew Chief

LaBella Associates, PC
11.2022 - Current

Survey Crew Chief/Drafter

LaBella Associates, PC
11.2022 - Current

Survey Crew Chief/Drafter

LaBella Associates, PC
11.2022 - Current

Project Manager/Crew Chief/ Lead Drafter

S.Y. Kim Land Surveyor, PC
06.2016 - 11.2022

Project Manager/Crew Chief/Lead Drafter

S.Y. Kim Land Surveyor, PC
06.2016 - 11.2022

NICET III Construction Manager - Various Projects

Boswell Engineering
05.1997 - 06.2016

Survey Crew Chief/Drafter

Boswell Engineering
05.1997 - 05.2016

Project Manager - Lafarge, NA Cement Plant

Boswell Engineering & S.Y. Kim Land Surveyor, PC
05.1997 - 06.2016

Survey Crew Chief

Boswell Engineering - S.U.N.Y Old Westbury College
05.1997 - 06.2016

Survey Crew Chief

Boswell Engineering -Clinton Correctional Facility
05.1997 - 06.2016

A.A.S. - Civil Engineering Technology

Hudson Valley Community College