With Great Lakes i used front end loader, telescopic forklift, multiple sized escavators, and bulldozers to laod / unload pipe and other materials from flatbed tractor trailors, hoist for assembly, relocate plastic and steeli pipe and attachments n 24&26 inch diameter and multiple lengths mainly 50 ft sections. Also operated escavator chained to barges on the water to hoist and hold said pipe for assembly Relocated same pipe in confined areas, pulled, pushed and lifted conex boxes and water barges with said equipment. cleared and maintained work area at discharge, relocated and graded discharged material from said pipe. worked with shoreman and others with hand signals and radio instructions in said tasks. Operated industrial sized air compressors with multiple hand tools to assemble pipe on land.
TWIC Card also certified for mash buggy use