Dependable Installer comfortably lifts 50 to 100 pounds and follows directions on projects. Over 25 years working on installation projects involving various components and materials. Careful worker with keen attention to detail. Dedicated employee known for punctuality, pursuing employment options where good customer service and positive attitude will make a difference. Flexible hard worker ready to learn and contribute to team success.
Used computer to watch thread makeups on pipe connections. Also used a CRT (casing running tool) to lower pipe and fill pipe
I supervised a crew where I grabbed tools from the yard after checking them, making sure my crew had all PPE and tools for the job. After checking everything at the yard, I drove the tools on a regular truck with either a gooseneck or a bumper pull trailer to the location. After arriving at the location, I went and checked in with the safety personnel and the PIC company man. After waiting for the job to be ready, I made sure all tools were rigged up correctly, and all safety precautions were taken. Then, I performed the job. After performing the job, I made sure the tools were rigged down safely, and the crew was safe while doing so. Then, I drove the tools and crew back to the shop.
I fabricated sheds at the shop, then put sheds on a flatbed trailer that was hooked to a truck. Once at the job site, we would build sheds on site, most of the. There were times when the sheds would fit in backyards, so we would put the shed on the trailer in one piece. Sometimes, the shed was 8 feet tall, not counting the trailer height, and sometimes the shed was 10 feet wide also. We did the greater part of Phoenix.
Took all certification for CPR and AED
Took all certification for CPR and AED