Summary
Overview
Work History
Education
Skills
Timeline
Generic

Christopher Polkey

Westwego,LA

Summary

Proven to enhance operational efficiency and team productivity, my tenure at APC Construction Co showcases a robust foundation in heavy equipment operation and exceptional teamwork. Leveraging skills in rigging and problem-solving, I've driven projects to completion with precision, significantly reducing costs and ensuring safety compliance. I have a wide range of skill pertaining to the deep foundation job task. I have experienced mechanical work and also fitting and welding. If something needs to be done, i can get it done

Overview

14
14
years of professional experience

Work History

Pile Driver/operator

APC Construction Co
07.2019 - Current
  • Enhanced project efficiency by accurately driving piles according to design specifications and guidelines.
  • Minimized disruptions to surrounding areas through diligent noise and vibration monitoring during piling operations.
  • Aided in risk mitigation by conducting regular assessments of soil stability around driven piles, ensuring safe working conditions for all team members.
  • Demonstrated adaptability in adjusting to varying job site conditions, implementing alternative piling methods when necessary.
  • Streamlined workflow between trades by promptly removing obstructions from work zones after completing piling tasks.
  • Assisted in mitigating environmental impacts through proper implementation of erosion control measures during pile driving activities.
  • Contributed to cost savings by optimizing pile lengths through careful planning and calculation prior to installation.
  • Collaborated effectively with team members for efficient coordination of pile driving operations and overall project progress.
  • Increased safety on job sites by strictly adhering to OSHA regulations and company safety protocols during pile driving operations.
  • Ensured accurate documentation of pile driving activities, aiding in smooth project management processes.
  • Reduced project delays by diligently maintaining pile driving equipment, ensuring optimal performance.
  • Maintained quality control standards by conducting thorough inspections of installed piles, identifying any necessary corrections or adjustments.
  • Improved communication between stakeholders with clear reporting on daily work progress, challenges encountered, and potential solutions.
  • Supported successful project completion with precise alignment of driven piles, meeting structural requirements.
  • Contributed to strong client relationships with professional communication regarding piling updates, addressing concerns or inquiries as needed.
  • Ensured the longevity of driven piles through careful installation of corrosion protection systems, safeguarding structural integrity.
  • Expedited construction timelines by efficiently operating heavy machinery such as cranes and excavators for pile handling and placement.
  • Secured boats and floating barges with rope and knots to prevent boat or barge from unmooring.
  • Assisted others to facilitate goal accomplishment and achieve mutual objectives.
  • Drove pilings to support buildings or other structures using heavy equipment.
  • Anchored and maneuvered pile driving barge using spools and lines to safely carry out operations.
  • Met trucks and barges, unloaded pile and moved to job locations to keep projects moving smoothly.
  • Remained informed of tide's influence on pile driving operations to properly execute work according to tide conditions.
  • Shifted levers and turned valves to activate power hammers or raise and lower drophammers.
  • Demonstrated crane hand signals to communicate with crane operator and provide load handling instructions.
  • Troubleshot and maintained chainsaws, pneumatic tools and other pile driving tools to keep equipment in good working conditions.
  • Used skid steer, telehandler forklift and excavator equipment on daily basis to carry out critical job tasks.
  • Completed basic welding and cutting of metal materials to prepare components for different job requirements.
  • Launched shackles, slings, chains and other rigging components to appropriately handle loads.
  • Executed repair procedures for broken piles, rusted hardware and damaged fender systems to keep docks functional.
  • Exercised precise boats and barge terminology to properly communicate with pile driver supervisor, pile driver workers and boat crews.
  • Oversaw routine job operations to maintain work schedules and keep teams focused.
  • Performed expert and highly safe rigging and unrigging of cranes and other equipment.
  • Operated various types of machinery, demonstrating versatility and adaptability in diverse work environments.
  • Maintained a safe working environment by enforcing strict adherence to safety guidelines and protocols.
  • Assisted in training new operators, sharing knowledge of best practices and promoting a culture of teamwork amongst peers.
  • Provided on-the-job training to newly hired workers and team members.
  • Maintained knowledge of industry policies and procedures to set up and operate equipment safely.
  • Worked outside in all weather conditions.
  • Collaborated with team members to ensure seamless coordination of tasks and efficient completion of projects.
  • Reduced equipment downtime by troubleshooting issues and performing timely repairs.
  • Consistently met or exceeded performance targets while maintaining strict adherence to health, safety, and environmental regulations.
  • Upheld quality standards through regular inspections of completed products, addressing any inconsistencies immediately.
  • Accurately documented all operational data, ensuring up-to-date records for review and analysis.
  • Conducted preventative maintenance on equipment to reduce repair costs.
  • Enhanced team morale and productivity by organizing regular team-building activities.
  • Conducted routine maintenance checks to prevent unexpected machinery downtime, ensuring continuous production flow.
  • Made sure that products were produced on time and are of good quality.
  • Met production targets and tight deadlines by collaborating closely with team members.
  • Performed general equipment maintenance and repair to minimize downtime.

Ac/Heating and Air Conditioning Service Technician

Stefan's Ac
12.2015 - 06.2019
  • Conducted maintenance service on HVAC systems to increase life expectancy of equipment and prevent costly repair work.
  • Inspected and tested refrigeration systems, safety devices and controls to determine proper functionality.
  • Repaired and replaced heating and air conditioning systems for commercial customers in [Type] industry.
  • Collaborated with team members on large-scale projects, ensuring timely completion and high-quality results.
  • Maximized system longevity for clients through regular preventative maintenance services, resulting in reduced repair costs over time.
  • Supported colleagues in troubleshooting complex HVAC issues, sharing knowledge of best practices and innovative solutions.
  • Ensured safety compliance with proper installation of heating and cooling equipment, following industry standards and regulations.
  • Improved customer satisfaction by promptly responding to service calls and accurately diagnosing HVAC issues.
  • Reduced callbacks from customers by thoroughly testing systems after repairs or installations to ensure optimal functioning.
  • Maintained a clean work environment during all service calls, demonstrating professionalism and respect for clients'' homes or businesses.
  • Provided exceptional customer service through clear communication, detailed explanations of services, and addressing any concerns or questions.
  • Managed inventory effectively to reduce waste while ensuring access to necessary parts during service calls.
  • Worked overtime, holidays and weekends to accommodate company needs.
  • Traveled to job sites for both scheduled and emergency appointments.
  • Performed troubleshooting on HVAC systems to determine root cause of issues.
  • Repaired and replaced motors, bearings and belts.
  • Read blueprints, wiring diagrams, piping schemes and engineering specifications to diagnose and repair units.
  • Investigated major malfunctions and breakdowns of heating and air-conditioning systems and used troubleshooting to determine causes.
  • Installed new air conditioning, heating and refrigeration systems according to manufacturer's specifications and local codes.
  • Repaired and replaced faulty motors, blowers, switches and compressor units.
  • Used technical skills, tools, and techniques like soldering to repair parts.
  • Assisted in maintenance, repair and installation of ventilation systems.
  • Repaired, replaced and serviced both residential and commercial HVAC equipment, components, and wiring.
  • Troubleshot and diagnosed issues with HVAC and refrigeration units.
  • Installed HVAC system expansions, discharge valves, air ducts, dampers, and stokers.
  • Worked in strict compliance with applicable OSHA regulations and safety requirements.
  • Worked on both home and business units for maintenance, repairs, and new installations.
  • Installed, connected and adjusted thermostats, humidistats and timers for optimal performance.
  • Supervised and instructed assistants.

Trawling/deckhand/Co Captain

Ross Parria
03.2011 - 11.2015
  • Developed strong teamwork skills by actively collaborating with fellow crew members in various tasks and emergency situations.
  • Handled lines during mooring operations efficiently, securing the vessel safely at designated locations.
  • Inspected and maintained deck equipment and supplies.
  • Performed maintenance tasks such as painting, chipping rust, and greasing equipment to extend the lifespan of onboard assets.
  • Contributed to efficient operations by maintaining a clean and organized deck environment.
  • Communicated clearly, concisely and politely with passengers and crew members.
  • Followed safety protocols and procedures to prevent accidents.
  • Operated winches, cranes, and other deck machinery proficiently, resulting in efficient completion of tasks.
  • Provided necessary support during docking maneuvers, contributing to successful berthing at various ports.
  • Implemented effective communication with team members, ensuring smooth coordination during critical operations.
  • Operated and maintained deck machinery, including winches and cranes.
  • Repaired, maintained and cleaned [Number] square feet of decking.

Education

L.W. Higgins High School
Marrero, LA

Skills

  • Rigging Knowledge
  • Construction safety
  • Heavy Lifting
  • Heavy Equipment Operation
  • Site preparation
  • Bridge Construction
  • Concrete Work
  • Environmental Compliance
  • Permit acquisition
  • Excavation Support
  • Sheet Piling
  • Shoring Systems
  • Marine Construction
  • Augercast Piles
  • Timber Piling
  • Steel Piling
  • Pile Driving Techniques
  • Ground Improvement
  • Building Foundations
  • Driven Piles
  • Deep Foundation
  • Helical Piles
  • Teamwork and Collaboration
  • Skid steer operation
  • Problem-Solving
  • Time Management
  • Attention to Detail
  • Torch cutting
  • Problem-solving abilities
  • Multitasking
  • Worksite safety
  • Multitasking Abilities
  • Reliability
  • Excellent Communication
  • Organizational Skills
  • Team Collaboration
  • Active Listening
  • Adaptability and Flexibility
  • Decision-Making
  • Truck loading and unloading
  • Relationship Building
  • Team building
  • Welding
  • Task Prioritization
  • Equipment Operation
  • Self Motivation
  • Interpersonal Skills
  • Mechanical Troubleshooting
  • Professionalism
  • Safety Monitoring
  • Continuous Improvement
  • Adaptability
  • Written Communication
  • Rigging skills
  • Equipment Inspection
  • Louisiana Driver's License
  • Welding skills
  • Crane support

Timeline

Pile Driver/operator

APC Construction Co
07.2019 - Current

Ac/Heating and Air Conditioning Service Technician

Stefan's Ac
12.2015 - 06.2019

Trawling/deckhand/Co Captain

Ross Parria
03.2011 - 11.2015

L.W. Higgins High School
Christopher Polkey