Industrial Electrician with 21+ years of heavy industrial experience in installing, maintaining, and repairing electrical wiring, equipment, and machinery in power plants and plant facilities.
Overview
20
20
years of professional experience
1
1
Certification
Work History
Electrical Superintendent
ESC-Electrical Systems Company
Carlonton, GA
02.2020 - Current
Building a new copper plant
Scheduled projects and planned all required materials, tasks and team assignments.
Supervising 134 employees which include electricians, general foremans, foremans and QA/QC's
Overseeing all the start up and commission on the project.
Maintained a safe, efficient and structured work environment and mentored all new hires to better improve competency and efficiency of all staff.
Evaluated job scope and determined necessary supplies, timelines and project expenses.
Performed electrical installations and repair for new construction and industrial support projects.
Complete quality assurance and compliance reviews for every job.
Maintained job sites in compliance with all safety requirements.
Put a training method in place for all new hires that align with the company policies.
Making sure we provide a safe work site by applying knowledge of safety protocol and awareness of potential hazards.
Communicate with clients to assess needs, provide status reports and inform them of any potential hazards.
Monitored employee performance and adherence to job specification to maintain quality standards and client satisfaction.
Project Manager-Zach Smith
Martin Marietta (Copper Plant)
Project Superintendent (Oil Refiner)
Contech Construction
05.2017 - 01.2020
Scheduled projects and planned all required materials, tasks and team assignments.
Maintained a safe, efficient and structured work environment and mentored all new hires to better improve competency and efficiency of all staff.
Communicate with clients to assess needs, provide status reports and inform them of any potential hazards.
Making sure we provide a safe work site by applying knowledge of safety protocol and awareness of potential hazards.
Responsible for hiring the right people for the job.
Oversee a crew of 48 employees pulling 3 conductors 750 cables from switch yard to transformers at 1200 feet.
Oversee the setup and operating 3 tuggers for cable pull
Oversee setting up numerous pulleys and cable tray rollers for a 34.5-volt cable pull.
Oversee the fabrication of numerous brackets and supports for cable pull.
Supervisor- Harry Fisher
Electrical GENERAL Foreman (Chemical Plant)
PCL Industrial Construction
08.2016 - 05.2017
Oversee conduit and lighting crew also a crew which was installing ¾” to 4” conduit for power and control
Oversee light fixtures and receptacles installation
Oversee all lighting panels and j-boxes installation
Oversee all plc’s set up on this job and oversee all cable pull to them and all terminations.
Oversee of all the termination of devices and instrument J-Boxes in the field.
Supervisor- Anthony Thompson
Electrical General Foreman
Kbr Construction
01.2015 - 07.2016
Oversee crews pulling cables, installing conduit and cable tray.
Oversee crews terminating instruments, instrument junction boxes and motors
Oversee the Installation of ¾” to 1” aluminum & rigid conduit for devices.
Oversee Installation of lights and receptacles
Set gear, panels and plc’s in new electrical room and did all interconnection.
Supervisor-Jerry Blakemore
Electrical General Foreman (Amazon Plant)
Gaylor Electrical Contractor
Clarksville
06.2013 - 01.2015
Foreman of crew pulling cable, installing conduit and cable tray.
Setting switch gears and installing control & lighting panels
Installation of raceway for power and controls to roof top units.
Installing conduit for power and controls.
Keeping up with daily production reports and turn-over dates.
Supervisors-Donnie Harris
Electrical General Foreman(Aluminum Plant)
Jacobs Field Service
Jesup, GA
02.2012 - 06.2013
Oversee crews pulling cable, installing conduit and cable tray.
Installation of 4160, 480v, control and signal cables in cable tray and conduct.
Supervising installation of ¾-2” rigid conduit.
Doing take-offs on jobs and ordering material for crew.
Keeping up with daily production reports and turnover dates.
Supervisors-Randall Cave
Electrical Foreman(Chemical Plant)
Robins and Mortin
Charleston, TN
01.2011 - 02.2012
Installation of new chemical plant.
Installation of 4160 high voltage cable and terminations in switchgear and motors.
Pulled new cables from new PLC’s and MCC’s to new motors, instruments and control panels.
Terminated cables in MCC’s, PLC’s motors and instruments.
Installation of fiber glass cable tray and plastic-bond ¾-2” conduit.
Electrical Foreman (Biodiesel Plant)
KBR Construction
Columbus, MS
02.2010 - 01.2011
Attending weekly production meetings, safety meetings and communicating with other crafts to complete job.
Overseeing Installation of IMC conduit from ¾” to 5” to power panels, motors, and instruments.
Supervised crew while installing duct banks, manholes, and handholes.
Supervising crew during Installation of lighting systems in numerous areas.
Overseen Installation of 6.9 switchgear, Power Dist. Centers, and motor control centers.
Supervisors- Jason Parnell/Randall Cave
Electrical General Foreman(Steel Mill)
SWB Construction
Atlanta, GA
04.2009 - 02.2010
Installation of cable tray from existing plant to new structure.
Overlooking cable pulls from existing plant to new structure PDC building.
Installation of rigid conduit ¾-2” to field cabinets and devices.
Terminating 480 motors and MCC’s.
Installing panels and disconnects for motors, field instruments and devices.
Supervisors: Mike Buchanan
Electrical Journeyman
Smiley Electrical Contractors
02.2007 - 03.2009
Installation of 4160 high voltage cable and terminations in switchgear and motors.
Installation of ¾” to 2” conduit and fittings.
Installation of drives and control panels in MCC room.
Electrical Journeyman
Reinicke Industrial
08.2006 - 02.2007
Installation of 24” and 36” alum cable tray and hangers.
Pulling armored control and power cables.
Testing and terminating cables in MCC’s and DCS cabinets per blueprints.