Christopher Snell

Coy,AL

Summary

Industrial Electrician with 21+ years of heavy industrial experience in installing, maintaining, and repairing electrical wiring, equipment, and machinery in power plants and plant facilities.

Overview

20
20
years of professional experience
1
1
Certification

Work History

Electrical Superintendent

ESC-Electrical Systems Company
Carlonton, GA
02.2020 - Current
  • Building a new copper plant
  • Scheduled projects and planned all required materials, tasks and team assignments.
  • Supervising 134 employees which include electricians, general foremans, foremans and QA/QC's
  • Overseeing all the start up and commission on the project.
  • Maintained a safe, efficient and structured work environment and mentored all new hires to better improve competency and efficiency of all staff.
  • Evaluated job scope and determined necessary supplies, timelines and project expenses.
  • Performed electrical installations and repair for new construction and industrial support projects.
  • Complete quality assurance and compliance reviews for every job.
  • Maintained job sites in compliance with all safety requirements.
  • Put a training method in place for all new hires that align with the company policies.
  • Making sure we provide a safe work site by applying knowledge of safety protocol and awareness of potential hazards.
  • Communicate with clients to assess needs, provide status reports and inform them of any potential hazards.
  • Monitored employee performance and adherence to job specification to maintain quality standards and client satisfaction.
  • Project Manager-Zach Smith
  • Martin Marietta (Copper Plant)

Project Superintendent (Oil Refiner)

Contech Construction
05.2017 - 01.2020
  • Scheduled projects and planned all required materials, tasks and team assignments.
  • Maintained a safe, efficient and structured work environment and mentored all new hires to better improve competency and efficiency of all staff.
  • Communicate with clients to assess needs, provide status reports and inform them of any potential hazards.
  • Making sure we provide a safe work site by applying knowledge of safety protocol and awareness of potential hazards.
  • Responsible for hiring the right people for the job.
  • Oversee a crew of 48 employees pulling 3 conductors 750 cables from switch yard to transformers at 1200 feet.
  • Oversee the setup and operating 3 tuggers for cable pull
  • Oversee setting up numerous pulleys and cable tray rollers for a 34.5-volt cable pull.
  • Oversee the fabrication of numerous brackets and supports for cable pull.
  • Supervisor- Harry Fisher

Electrical GENERAL Foreman (Chemical Plant)

PCL Industrial Construction
08.2016 - 05.2017
  • Oversee conduit and lighting crew also a crew which was installing ¾” to 4” conduit for power and control
  • Oversee light fixtures and receptacles installation
  • Oversee all lighting panels and j-boxes installation
  • Oversee all plc’s set up on this job and oversee all cable pull to them and all terminations.
  • Oversee of all the termination of devices and instrument J-Boxes in the field.
  • Supervisor- Anthony Thompson

Electrical General Foreman

Kbr Construction
01.2015 - 07.2016
  • Oversee crews pulling cables, installing conduit and cable tray.
  • Oversee crews terminating instruments, instrument junction boxes and motors
  • Oversee the Installation of ¾” to 1” aluminum & rigid conduit for devices.
  • Oversee Installation of lights and receptacles
  • Set gear, panels and plc’s in new electrical room and did all interconnection.
  • Supervisor-Jerry Blakemore

Electrical General Foreman (Amazon Plant)

Gaylor Electrical Contractor
Clarksville
06.2013 - 01.2015
  • Foreman of crew pulling cable, installing conduit and cable tray.
  • Setting switch gears and installing control & lighting panels
  • Installation of raceway for power and controls to roof top units.
  • Installing conduit for power and controls.
  • Keeping up with daily production reports and turn-over dates.
  • Supervisors-Donnie Harris

Electrical General Foreman(Aluminum Plant)

Jacobs Field Service
Jesup, GA
02.2012 - 06.2013
  • Oversee crews pulling cable, installing conduit and cable tray.
  • Installation of 4160, 480v, control and signal cables in cable tray and conduct.
  • Supervising installation of ¾-2” rigid conduit.
  • Doing take-offs on jobs and ordering material for crew.
  • Keeping up with daily production reports and turnover dates.
  • Supervisors-Randall Cave

Electrical Foreman(Chemical Plant)

Robins and Mortin
Charleston, TN
01.2011 - 02.2012
  • Installation of new chemical plant.
  • Installation of 4160 high voltage cable and terminations in switchgear and motors.
  • Pulled new cables from new PLC’s and MCC’s to new motors, instruments and control panels.
  • Terminated cables in MCC’s, PLC’s motors and instruments.
  • Installation of fiber glass cable tray and plastic-bond ¾-2” conduit.

Electrical Foreman (Biodiesel Plant)

KBR Construction
Columbus, MS
02.2010 - 01.2011
  • Attending weekly production meetings, safety meetings and communicating with other crafts to complete job.
  • Overseeing Installation of IMC conduit from ¾” to 5” to power panels, motors, and instruments.
  • Supervised crew while installing duct banks, manholes, and handholes.
  • Supervising crew during Installation of lighting systems in numerous areas.
  • Overseen Installation of 6.9 switchgear, Power Dist. Centers, and motor control centers.
  • Supervisors- Jason Parnell/Randall Cave

Electrical General Foreman(Steel Mill)

SWB Construction
Atlanta, GA
04.2009 - 02.2010
  • Installation of cable tray from existing plant to new structure.
  • Overlooking cable pulls from existing plant to new structure PDC building.
  • Installation of rigid conduit ¾-2” to field cabinets and devices.
  • Terminating 480 motors and MCC’s.
  • Installing panels and disconnects for motors, field instruments and devices.
  • Supervisors: Mike Buchanan

Electrical Journeyman

Smiley Electrical Contractors
02.2007 - 03.2009
  • Installation of 4160 high voltage cable and terminations in switchgear and motors.
  • Installation of ¾” to 2” conduit and fittings.
  • Installation of drives and control panels in MCC room.

Electrical Journeyman

Reinicke Industrial
08.2006 - 02.2007
  • Installation of 24” and 36” alum cable tray and hangers.
  • Pulling armored control and power cables.
  • Testing and terminating cables in MCC’s and DCS cabinets per blueprints.

Education

High School Diploma -

Skills

  • Project Superintendent
  • Blueprints & Schematics
  • Motors & Conduit
  • Testing Instruments
  • Generators & Transformers
  • Cable Trays & Raceways
  • Wiring Diagrams
  • Electrical Code
  • Switches & Circuit Breakers
  • Electrical Systems & Controls
  • Installations & Maintenance

Certification

  • ALABAMA JOURNYMEN LICENCES
  • TEXAS STATE LICENCES
  • NCCER Plus Certification/INSTRUCTOR
  • 3M Certification ON STRESS CONES
  • OSHA 30 Card
  • ADULT FIRST AID/CPR/AED CERTIFIED
  • TWIC Card

Timeline

Electrical Superintendent

ESC-Electrical Systems Company
02.2020 - Current

Project Superintendent (Oil Refiner)

Contech Construction
05.2017 - 01.2020

Electrical GENERAL Foreman (Chemical Plant)

PCL Industrial Construction
08.2016 - 05.2017

Electrical General Foreman

Kbr Construction
01.2015 - 07.2016

Electrical General Foreman (Amazon Plant)

Gaylor Electrical Contractor
06.2013 - 01.2015

Electrical General Foreman(Aluminum Plant)

Jacobs Field Service
02.2012 - 06.2013

Electrical Foreman(Chemical Plant)

Robins and Mortin
01.2011 - 02.2012

Electrical Foreman (Biodiesel Plant)

KBR Construction
02.2010 - 01.2011

Electrical General Foreman(Steel Mill)

SWB Construction
04.2009 - 02.2010

Electrical Journeyman

Smiley Electrical Contractors
02.2007 - 03.2009

Electrical Journeyman

Reinicke Industrial
08.2006 - 02.2007