Summary
Overview
Work History
Education
Skills
Core Professional Competencies
Timeline
Generic

Chuck Velez

Davison,Michigan

Summary

Diplomatic leader achieves breakthrough performance implementing meaningful change on the shop floor and within engineering organizations. Drives results through guidance, coaching and focusing teams on critical objectives. Demonstrated pace & rigor in achieving significant Capex reduction, improved operational efficiencies and successful new model launches.

Overview

31
31
years of professional experience

Work History

Senior Manager – Vehicle Process Engineering – Launch & Execution

Stellantis - NAFTA Region
Auburn Hills, Michigan
01.2017 - Current
  • Led the GAPE BOF Team to design, install and launch the all-new Grand Wagoneer at a Detroit area assembly plant
  • Overcame significant obstacles brought on by executing this significant project during the Global Covid Pandemic.
  • The budget that my General Assembly team managed was upwards of $200M
  • Significant scope included commissioning all new Trim conveyors, Rotating Carrier System, Skillet System, Final Conveyor system, I/P Load, Glass Cell, Body Decking, Fluid Fills (Coolant, Brake & A/C), Three new Aligners, Rolls & ADAS that accommodates the new Grand Wagoneer and the Ram Classic Pickup Truck.
  • Successflly launched the all new Grand Wagoneer and Ram Classic Pickup Truck, on time and within budget.

Senior Manager – Mfg Engineering Throughput & Simulation

Fiat Chrysler Automobiles - NAFTA Region
Auburn Hills, Michigan
01.2014 - 01.2017
  • Created and deployed a Throughput Methodology across eight U.S and Canadian vehicle assembly plants for Fiat Chrysler Automobile (FCA) Vehicle Operations
  • Led a team of 15 Managers / Simulation Engineers, completely revamping NAFTA FCA's Throughput Simulation strategy, correlating physical world performance with digital modeling to greatly improve simulation accuracy
  • Hand picked by senior leadership to lead cross functional team implementing Change Management / Global Plant Organization for NAFTA vehicle operations.

Senior Manager – Vehicle Line Manufacturing

Chrysler Corporation
Auburn Hills, Michigan
01.2012 - 01.2014
  • Managed significant project, overseeing scope, budget and timing to successfully launch the 2013 Dodge Challenger & Charger with the all new Hell Cat engine.
  • Chosen by senior leadership to lead a cross functional Manufacturing team creating the seven steps of Program Management, a new Pillar in World Class Technology (FCA Manufacturing Engineering’s effort to implement a World Class Operating System, an industry first).

Senior Manager – Body Welding Department

Chrysler Corporation – Toledo Jeep Assembly Complex
Toledo, Ohio
01.2002 - 01.2012
  • Senior Manager with full responsibility for the entire Body Welding/Assembly Department which built the Jeep Liberty and Dodge Nitro SUV’s producing 1,200 units per day with 36 salaried staff and 430 hourly operators & trades.
  • Appointed to position of Professional Maintenance Pillar Leader and the Autonomous Maintenance Pillar Leader.

Manager – Stamping Manager

Chrysler Corporation – Belvidere Assembly Plant
Belvidere, Illinois
01.2000 - 01.2002
  • Oversaw three shifts of production and maintenance in the satellite stamping plant at the FCA Belvidere Assembly Plant producing 95% of all metal panels for the Dodge & Plymouth Neon managing 12 salaried, 20 skilled trades employees and 30 production operators.

Manager – Vehicle Launch Coordinator

Chrysler Corporation – Belvidere Assembly Plant
Belvidere, Illinois
01.1999 - 01.2000
  • Coordinated launch activities at the FCA Belvidere Assembly Plant with Vehicle Engineering Small Car Platform Team, Advanced Manufacturing Engineering, Advanced Stamping Manufacturing Engineering and Plant Operations to successfully launch the 1998 & 1999 model year Dodge & Plymouth Neon
  • Successfully launched 1999 MY Neon R/T and ACR Models.

Manager – Body Welding Area Manager

Chrysler Corporation – Belvidere Assembly Plant
Belvidere, Illinois
01.1997 - 01.1999
  • Managed staff of 10 with 160 production & trades employees. Guided the afternoon shift team to significant improvements in Safety, Quality, Delivery, Cost & Morale.
  • Key leader chosen to implement the Chrysler Operating System (COS) in an established union manufacturing environment through employee engagement and participation.

Chrysler Operating System (COS) Lean Specialist

Chrysler Corporation – Belvidere Assembly Plant
Belvidere, Illinois
01.1995 - 01.1997
  • Selected by the Plant Manager to learn the Toyota Production System, master Lean Manufacturing concepts and lead the implementation of the Chrysler Operating System (COS) on the shop floor.

Supervisor – Production Supervisor Chassis

Chrysler Corporation – Belvidere Assembly Plant
Belvidere, Illinois
01.1993 - 01.1995
  • Led 55 hourly employees in the launch of the Dodge & Plymouth Neon at the FCA Belvidere Assembly Plant, as a Chassis Production Supervisor on the afternoon shift.

Education

BSME - Mechanical Engineering

Oakland University

MSME - Mechanical Engineering

University of Michigan – Dearborn

Skills

  • Industrial Engineering
  • Operations Management
  • Talent Development
  • Budget Oversight
  • Resource Allocation
  • Budget Administration
  • Cross-Functional Team Leadership
  • Organizational Development
  • Documentation and Reporting
  • Cross-Functional Collaboration
  • Data-Driven Decision-Making
  • Operations Planning
  • Cross-Functional Communication
  • Organizational Improvement
  • Innovation Management

Core Professional Competencies

  • World Class Manufacturing
  • World Class Technology
  • Relationship Building
  • Team-Based Leadership
  • Capex Management
  • Process Development
  • Organizational & Leadership Development
  • Coaching / Mentoring
  • Project Management
  • Change Management
  • Strategic Planning
  • Manufacturing Best Practices

Timeline

Senior Manager – Vehicle Process Engineering – Launch & Execution

Stellantis - NAFTA Region
01.2017 - Current

Senior Manager – Mfg Engineering Throughput & Simulation

Fiat Chrysler Automobiles - NAFTA Region
01.2014 - 01.2017

Senior Manager – Vehicle Line Manufacturing

Chrysler Corporation
01.2012 - 01.2014

Senior Manager – Body Welding Department

Chrysler Corporation – Toledo Jeep Assembly Complex
01.2002 - 01.2012

Manager – Stamping Manager

Chrysler Corporation – Belvidere Assembly Plant
01.2000 - 01.2002

Manager – Vehicle Launch Coordinator

Chrysler Corporation – Belvidere Assembly Plant
01.1999 - 01.2000

Manager – Body Welding Area Manager

Chrysler Corporation – Belvidere Assembly Plant
01.1997 - 01.1999

Chrysler Operating System (COS) Lean Specialist

Chrysler Corporation – Belvidere Assembly Plant
01.1995 - 01.1997

Supervisor – Production Supervisor Chassis

Chrysler Corporation – Belvidere Assembly Plant
01.1993 - 01.1995

BSME - Mechanical Engineering

Oakland University

MSME - Mechanical Engineering

University of Michigan – Dearborn
Chuck Velez