Summary
Overview
Work History
Education
Skills
Timeline
Generic

C.J Humphrey

Auxvasse,MO

Summary

Dynamic Installation Lead at Henderson Products with a proven track record in problem-solving and teamwork. Skilled in Welding and fabrication, Electrical, Hydraulics Body prep and Final assembly, I enhance service quality and safety. Known for my dependable nature and organizational skills, I streamline processes while maintaining a positive attitude in fast-paced environments.

Experienced leader with strong background in guiding teams, managing complex projects, and achieving strategic objectives. Excels in developing efficient processes, ensuring high standards, and aligning efforts with organizational goals. Known for collaborative approach and commitment to excellence.

Experienced with team leadership, strategic planning, and operational management. Utilizes effective communication and organizational skills to drive project success. Track record of fostering productive work environments and achieving set goals.

Strong leader and problem-solver dedicated to streamlining operations to decrease costs and promote organizational efficiency. Uses independent decision-making skills and sound judgment to positively impact company success.

Overview

21
21
years of professional experience

Work History

Installation Lead

Henderson Products
08.2020 - Current
  • Self-motivated, with a strong sense of personal responsibility.
  • Worked effectively in fast-paced environments.
  • Skilled at working independently and collaboratively in a team environment.
  • Proven ability to learn quickly and adapt to new situations.
  • Worked well in a team setting, providing support and guidance.
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Streamlined processes by creating detailed work plans and schedules for the installation team.
  • Implemented cost-saving measures while maintaining quality standards, ultimately benefiting company profits and reputation.
  • Completed complex installations within tight deadlines, showcasing strong problem-solving abilities and adaptability under pressure.
  • Increased overall efficiency through effective communication with clients and team members.
  • Established long-term relationships with clients by providing excellent post-installation support services.
  • Stayed current on industry trends and technology advancements, allowing for seamless integration of new systems into existing setups when necessary.
  • Maintained high-quality standards, resulting in excellent customer feedback and repeat business.
  • Provided exceptional service by troubleshooting issues and resolving them promptly during installations.
  • Managed inventory effectively, reducing costs associated with excess or outdated equipment.
  • Performed regular maintenance checks on all tools and equipment used during installations, minimizing downtime due to broken or faulty equipment.
  • Assisted in the hiring process of skilled technicians, resulting in an overall stronger workforce capable of handling larger projects more efficiently.
  • Developed customized solutions for clients based on their unique requirements, leading to increased satisfaction rates.
  • Evaluated team performance regularly to identify areas of improvement, fostering professional growth among technicians.
  • Conducted regular training sessions for technicians to ensure up-to-date knowledge on industry best practices.
  • Ensured safety compliance, leading to a decrease in workplace accidents during installations.
  • Used hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Diagnosed and troubleshot system faults, identifying equipment issues and resolutions.
  • Installed and configured new equipment and systems according to company standards.
  • Evaluated equipment to determine if it needed to be repaired or replaced.
  • Diagnosed and repaired problems with electrical and mechanical systems.
  • Tested systems, noting issues and completing preventive maintenance.
  • Oversaw quality control measures during installations, identifying potential issues early on to minimize costly rework later.
  • Conducted thorough post-installation inspections to verify adherence to design specifications and client expectations.
  • Managed a team of technicians, providing guidance and support to ensure high-quality workmanship.
  • Managed installation schedules proactively to avoid delays and reduce downtime for clients.

Heavy Truck and Trailer Technician

Travel Centers of America
01.2015 - 08.2020
  • Managed multiple concurrent tasks effectively, prioritizing workload to meet deadlines without compromising attention to detail.
  • Maintained up-to-date knowledge of industry advancements in trailer technology through regular training and professional development courses.
  • Communicated proactively with service advisors regarding job status updates or potential delays, keeping clients informed throughout the repair process.
  • Streamlined the trailer repair process by implementing a detailed documentation system for tracking work orders and parts inventory.
  • Supported fellow technicians in troubleshooting difficult problems, fostering a collaborative atmosphere within the workplace.
  • Promoted a clean workspace by consistently following established housekeeping procedures, contributing to an organized shop environment.
  • Conducted electrical diagnostics and repairs on trailers, improving overall functionality and reliability.
  • Fabricated parts and welded connections.
  • Troubleshot problems and implemented solutions to fix issues with brakes.
  • Ran diagnostic procedures for electrical issues.
  • Documented all actions in computer system.
  • Diagnosed mechanical problems for repair or replacement.
  • Serviced and maintained engines by performing regular oil and filter changes.
  • Used specialized tools and equipment to diagnose and repair issues with diesel engines.

Utility Locate Technician

UNITED STATES INFRASTRUCTURE CORPORATION
03.2004 - 11.2015
  • Reduced damage claims by consistently adhering to industry best practices when performing locates and marking utilities.
  • Enhanced safety measures by diligently marking utility lines to prevent accidents during excavation projects.
  • Improved service quality by accurately locating underground utilities using specialized equipment.
  • Streamlined project timelines by efficiently completing locate requests within designated time frames.
  • Facilitated clear communication with construction crews, homeowners, and other stakeholders regarding utility locations and potential hazards.
  • Provided reliable service to clients by consistently meeting all deadlines and ensuring accurate locates were provided to prevent costly delays or damages.
  • Promoted a culture of safety among colleagues by actively participating in safety meetings and sharing best practices for utility locating.
  • Conducted thorough site investigations to gather necessary data for accurate utility mapping and recordkeeping.
  • Completed large-scale projects expediently through effective time management skills that allowed for simultaneous handling of multiple locate requests.
  • Reviewed maps and blueprints to identify locations for and sizes of underground utilities
  • Photographed utility sites and marked lines with paint and flags for identification by excavating personnel.
  • Actively responded to emergency situations pertaining to illegal digging and excavation accidents.
  • Identified depths of water, sewer, gas, cable, oil and electric lines using Radio Detection equipment.
  • Read blueprints and schematics to correctly place equipment.

Education

Associate of Applied Science - Automotive Technology And Business/shop Management

Lincoln College of Technology
Indianapolis, IN
04-2024

High School Diploma -

David H Hickman Highschool
Columbia, MO
05-2023

Skills

  • Teamwork and collaboration
  • Customer service
  • Problem-solving
  • Dependable and responsible
  • Computer skills
  • Organizational skills
  • Calm under pressure
  • Welding
  • Fabrication
  • Blueprint reading
  • Layout and fitting
  • Vertical welding
  • Structural welding
  • Tool repair and maintenance
  • MIG welding professional
  • Precision measuring tools
  • Crane operation
  • Rigging techniques
  • Power tool operation
  • Machinery operation
  • Hand and power tools
  • Repair work
  • Troubleshooting
  • Equipment maintenance
  • Plasma cutting
  • Installation and maintenance
  • Oxy-fuel cutting
  • Quality inspections
  • Maintenance and repairs
  • Mechanical Knowledge
  • Documentation and reporting
  • Decision-making
  • Quality assurance
  • Strategic planning
  • Goal setting
  • Inventory management
  • Resource allocation
  • Time management
  • Safety procedures

Timeline

Installation Lead

Henderson Products
08.2020 - Current

Heavy Truck and Trailer Technician

Travel Centers of America
01.2015 - 08.2020

Utility Locate Technician

UNITED STATES INFRASTRUCTURE CORPORATION
03.2004 - 11.2015

Associate of Applied Science - Automotive Technology And Business/shop Management

Lincoln College of Technology

High School Diploma -

David H Hickman Highschool