Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

CLETUS CONNERS

Columbus,OH

Summary

Strategic Production Lead specializing in workflow optimization, quality assurance, and data analysis. Enhances production efficiency and streamlines processes to minimize waste and improve team collaboration. Experienced in production planning and process improvement, driving productivity through effective communication across departments.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Production Lead

Gilson Company Inc
Lewis Center, Ohio
02.2024 - Current
  • Coordinated workflow among team members to optimize production efficiency.
  • Maintained production schedules and addressed any delays promptly.
  • Conducted quality checks to uphold product standards throughout the process.
  • Collaborated with management to improve workflow and reduce waste.
  • Streamlined interdepartmental communication to improve operational efficiency across teams.
  • Developed training program for new employees on equipment usage and company policies to enhance onboarding experience.
  • Assisted in inventory management, ensuring adequate supply levels for production needs.
  • Provided team members with essential hand tools, supplies, and power equipment to minimize production interruptions.

Tile Setter

Six Floors Down
Westerville, Ohio
05.2016 - 12.2023
  • Installed various tile types including ceramic, porcelain, and natural stone.
  • Prepared surfaces by cleaning, leveling, and applying adhesives.
  • Cut tiles to fit specific areas using wet saws and hand tools.
  • Collaborated with contractors to meet project deadlines and enhance client satisfaction.
  • Maintained tools and equipment for optimal performance and safety compliance.
  • Used power tools and machinery properly to avoid job site accidents.
  • Ensured that all customer requirements were met before leaving job site.
  • Repaired damaged tiles by replacing them with new ones or patching them up with matching pieces.
  • Prepared sub-floor surfaces by removing existing material or filling in cracks.
  • Installed backer boards on floors and walls to provide a base for the tiling process.
  • Identified materials and amount of labor required for project completion after reviewing blueprints.

Education

Some College (No Degree) -

Columbus State Community College
Columbus, OH

Skills

  • Production planning
  • Quality assurance
  • Inventory management
  • Workflow optimization
  • Process improvement
  • Equipment maintenance
  • Data analysis
  • Team collaboration
  • Problem solving
  • Effective communication
  • Attention to detail
  • Troubleshooting

Certification

Forklift

Timeline

Production Lead

Gilson Company Inc
02.2024 - Current

Tile Setter

Six Floors Down
05.2016 - 12.2023

Some College (No Degree) -

Columbus State Community College
CLETUS CONNERS