Summary
Overview
Work History
Education
Skills
Timeline
Generic

Cody Bouldin

West Frankfort,IL

Summary

To seek and maintain a full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Dedicated professional with history of meeting company goals utilizing consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.

Overview

11
11
years of professional experience

Work History

Carpentry Laborer

J. Odle Construction
Benton, IL
01.2021 - Current
  • Framed, remodeled and finished wood structures.
  • Installed and repaired cabinets; and shelves.
  • Inspected completed work for conformance with specifications and requirements and confirmed compliance with applicable building and safety regulations.
  • Cleaned, calibrated and serviced tools and equipment.
  • Maintained variety of hand tools, portable power tools and standard measuring instruments on daily job assignments.
  • Used hand tools such as utility knives, hammers and deglazing devices to complete carpentry tasks.
  • Developed proficiency in stain-grade trim work, hanging doors and drilling and setting door hardware.
  • Cut and installed insulation for residential and commercial buildings.
  • Installed interior doors and hardware, accessories, cubicle curtain tracks and TV brackets.
  • Cut and shaped materials to meet outlined measurements.
  • Followed protocols and stayed organized to provide personal and teammate safety.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
  • Repaired roofs and flooring and remodeled bathrooms and kitchens to complete projects
  • Carefully read blueprints, sketches and technical drawings to inform comprehensive understanding of project scope and specifications.
  • Measured and marked cutting lines on materials using pencil or chalk and marking gauge.
  • Repaired roofs and flooring and remodeled bathrooms and kitchens to complete [Number] projects.
  • Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.

Project Manager

Supreme Construction
Zion, IL
04.2014 - 11.2020
  • Developed and initiated projects, managed costs, and monitored performance.
  • Identified plans and resources required to meet project goals and objectives.
  • Headed project teams specializing in design and launch activities.
  • Provided management for internal personnel, contractors and vendors.
  • Managed projects from procurement to commission.
  • Orchestrated projects within strict timeframes and budget constraints by solving complex problems and working closely with senior leaders.
  • Sourced, vetted and managed vendors needed to accomplish project goals.
  • Verified quality of deliverables and conformance to specifications before submitting to clients.
  • Recruited and oversaw personnel to achieve performance and quality targets.
  • Reported regularly to managers on project budget, progress and technical problems.
  • Tracked project and team member performance closely to quickly intervene in mistakes or delays.
  • Maintained open communication by presenting regular updates on project status to customers.

Production Worker

IRIS, USA
Pleasant Prairie, WI
10.2013 - 04.2014
  • Supported machine operators in setup and operation of production equipment resulting in efficient runs.
  • Inspected final products to assess compliance with quality standards and established tolerances.
  • Supported current production needs by moving items between equipment, conveyors and staging areas.
  • Conducted quality inspections of finished products and made minor repairs to meet project expectations.
  • Calibrated machines to maintain required productivity levels and adherence to quality standards.
  • Maintained machinery to prevent overloads and avoid malfunctions.
  • Documented production information via daily system logs and discussed issues with management.
  • Assembled plastic products according to changing daily work orders and specific customer needs.
  • Unloaded incoming products and moved boxes to staging areas, sorted items and transported to final storage locations.
  • Took on additional shifts during peak work periods to keep projects on schedule.
  • Graded and packaged finished products, transporting items for additional processing, storage or shipment off-site.
  • Organized work to meet demanding production goals.
  • Used hand trucks, forklifts and scissor lifts to complete tasks and transport items.

Production Line Worker

Monarch Plastics
Kenosha, WI
03.2011 - 02.2014
  • Used hand trucks, forklifts and scissor lifts to complete tasks and transport items.
  • Inspected extruded product for appearance and size defects according to specifications.
  • Used established assembly instructions to complete jobs quickly, accurately and with zero errors.
  • Calibrated equipment to maintain optimal performance.
  • Used basic mathematical abilities to calculate materials, hourly rates and other relevant details.
  • Performed hand-finishing of final products after assembling component parts for items.
  • Maintained organized work area by cleaning and removing hazards.
  • Made sure that products were produced on time and are of good quality.
  • Inspected products and machines to maintain quality and efficiency.
  • Tested products or subassemblies for functionality or quality and troubleshot problems with equipment, devices or products.

Education

GED -

Bella Venture
Racine, WI

Skills

  • Client Relations
  • Finishing Techniques
  • Precision and Accuracy
  • Demolition and Cleanup
  • Attention to Detail
  • Project Management
  • Cabinet Repair
  • Technical Troubleshooting
  • Hardware Installation
  • Time Management
  • Decision Making and Prioritization
  • Crew Management
  • Structure Assembly
  • Problem Solving
  • Residential and Commercial Renovations
  • Interpreting Blueprints
  • Power Tool Maintenance and Care
  • Safety Compliance
  • Subflooring Installation
  • Hand and Power Tool Operation
  • Carpentry and Woodworking
  • Materials Selection
  • Heavy Lifting
  • Client Billing
  • OSHA Compliance
  • Facilities Maintenance
  • Flooring Installation
  • Lumber Cutting
  • Wood Staining
  • Electrical Wiring
  • Drywall Installation
  • Multitasking and Prioritization
  • Quality Control
  • Interior and Exterior Painting
  • Flexible and Adaptable
  • Home Renovation
  • Reading Schematics
  • Stud Framing
  • Interior Trimming

Timeline

Carpentry Laborer

J. Odle Construction
01.2021 - Current

Project Manager

Supreme Construction
04.2014 - 11.2020

Production Worker

IRIS, USA
10.2013 - 04.2014

Production Line Worker

Monarch Plastics
03.2011 - 02.2014

GED -

Bella Venture
Cody Bouldin