Experienced Pipefitter Foreman skilled in training new employees and coordinating projects. Known for strong problem-solving abilities and effective communication, contributing to safety compliance and project success.
Overview
12
12
years of professional experience
1
1
Certification
Work History
Pipefitter Foreman
Starcon International
New Lenox, Illinois
10.2021 - Current
Supervised pipefitting crew on industrial projects for efficient workflow.
Trained new employees on pipefitting techniques and safety protocols.
Inspected completed work to ensure compliance with industry standards.
Managed daily operations to maintain a safe and productive work environment.
Communicated project updates and challenges to upper management regularly.
Evaluated blueprints, diagrams, drawings and other specifications to plan layouts for piping systems.
Supervised a team of Pipefitters to ensure safety protocols were adhered to.
Coordinated with other tradespeople such as welders, electricians, plumbers when necessary.
Inspected existing piping systems for potential issues or hazards prior to installation of new components.
Used work orders, verbal directions and technical documentation to coordinate team plans.
Troubleshot problems that arose during the course of the project and implemented solutions quickly and efficiently.
Boilermaker
Manhattan Mechanical Services
Manhattan, Illinois
09.2014 - 10.2021
Fabricated and assembled metal components for various industrial projects.
Installed and repaired boiler systems according to safety standards.
Collaborated with teams to ensure timely project completion and quality control.
Conducted inspections to identify defects in materials and workmanship.
Maintained tools and equipment for optimal performance and safety compliance.
Trained junior boilermakers on techniques and safety procedures in the workplace.
Interpreted blueprints and technical drawings to guide fabrication processes.
Followed safety procedures and protocols to minimize equipment mishaps.
Repaired worn or damaged parts of boilers, tanks, and vats by cutting out defective areas and replacing them with new plates or sections.
Cut materials to size with torches and hand tools.
Signaled to crane operator to lift components to specific positions.