
Dynamic Natural Gas Technician with DDS Companies, skilled in gas line repair and pressure testing. Proven ability to enhance pipeline integrity through effective teamwork and communication. Committed to safety and code compliance, consistently achieving operational excellence while fostering a collaborative work environment. Passionate about continual improvement and customer service.
NGA-CT-06B-Inspecting for Atmospheric Corrosion, Excluding Measurement of Wall Loss
NGA-CT-08-Visually Inspecting for Internal Corrosion
NGA-CT-11/12/17B-Pipe Coatings (Hot Applied Tape)
NGA-CT-11/12/17C-Pipe Coatings (Heat Shrink Sleeve)NGA-CT-11/12/17D-Pipe Coatings (Wax Tape)06/11/27NGA-CT-11/12/17F-Pipe Coatings (Cold Applied Tape)06/13/27NGA-CT-11/12/17H-Pipe Coatings (Single Coating System Paint)06/11/27NGA-CT-14A-Installing/Replacing an Anode on a Pipeline by Exothermic Welding11/08/27NGA-CT-16A-Installing/Replacing a Corrosion Test Station on a Pipeline by Exothermic Welding11/08/27NGA-CT-20A-Investigating Leak and Odor Complaints (Inside and Outside)06/11/27NGA-CT-21-Line Locating and Mark Out (New York)11/08/27NGA-CT-23/24-Inspecting the Condition of Exposed Pipe (Critical AOC)06/13/27NGA-CT-29/30B-Repairing a Plastic and Steel Distribution Pipe (Repair Clamp)11/08/27NGA-CT-31A-Installation of Pipe: Storage, Handling, and Inspection of Pipe: General Knowledge (Critical AOC)06/13/27NGA-CT-31B-Installation of Pipe: Installing Pipe in a Ditch (Critical AOC)06/11/27NGA-CT-31D-Installation of Pipe: Installing Pipe by Horizontal Boring (Piercing Tools) (Critical AOC)06/13/27NGA-CT-31E-Installation of Pipe: Installing Pipe by Dead Insertion (Critical AOC)06/13/27NGA-CT-32/33A-Purging a Pipeline Into and Out of Service with Air or Inert Gas06/11/27NGA-CT-34A.1-Performing a Pressure Test with Air and Inert Gas06/13/27NGA-CT-35A.2-Stopping Gas Flow (Squeeze-Off Mains and Services-Manual)11/08/27NGA-CT-36/47-Abandonment of Facilities (Critical AOC)10/07/27NGA-CT-40B-Installing/Replacing Tracer Wire Only06/11/27NGA-CT-41/42B-Inspecting, Operating, and Maintaining Distribution Valves (Excluding Lubrication)06/11/27NGA-CT-45-Restoring Service (Customer Turn-on/Relight)10/10/27NGA-CT-49A-Mechanical Joining of Pipe other than Plastic (Threaded Fittings)06/11/27NGA-CT-49B-Mechanical Joining of Pipe other than Plastic (Flanged)06/13/27NGA-CT-49H.1-Mechanical Joining of Pipe Other Than Plastic-Nut Follower (Insulated and Non-Insulated)06/11/27NGA-CT-49I.1-Mechanical Joining of Pipe Other Than Plastic-Bolted (Insulated and Non-Insulated)06/11/27NGA-CT-50/51/52C.1-Joining Plastic Pipe-Saddle Electrofusion05/05/26NGA-CT-50/52C.2-Joining Plastic Pipe-Coupling Electrofusion05/05/26NGA-CT-50/52D.12-Joining Plastic Pipe-Hydraulic Butt Fusion Excluding 14" and Larger Pipe (Power-Driven)05/05/26NGA-CT-50/52E.1-Joining Plastic Pipe-Manual Butt Fusion (Coil-to-Coil and Coil-to-Stick)05/05/26NGA-CT-50B.1-Joining Plastic Pipe-Mechanical-Stab Fitting (Permasert, Servi-Sert)01/29/26NGA-CT-50B.2-Joining Plastic Pipe-Mechanical-Stab Fitting (Permasert 2.0)01/29/26NGA-CT-50H-Joining Plastic Pipe-Nut Follower01/29/26NGA-CT-50I-Joining Plastic Pipe-Bolted Fitting01/29/26NGA-CT-50J.4-Joining Plastic Pipe-Compression (Metfit - Hydraulic)01/29/26NGA-CT-51D-Tapping Using Self-Tapping Tees (Plastic and Steel)06/11/27NGA-CT-51J.1-Joining Plastic Pipe-Compression (Permalock Mechanical Tapping Tee)06/11/27NGA-CT-70-Basic Abnormal Operating Conditions and Properties of Natural Gas (Critical AOC)04/08/27NGA-CT-71-Operator Excavating and Backfilling in the Vicinity of a Pipeline (Critical AOC)05/13/27NGA-CT-72B.1-Installing and Turning Off Meters (Residential and Small Commercial) Including Regulators04/25/28NGA-CT-85-Meter Assembly Abnormal Operating Conditions (Critical AOC)04/28/28NGA-CT-88-Operating a Combustible Gas Indicator06/11/27NGA-CT-90-Pigging Debris or Water from a Main or Service