
This was a solar project the crew I was on installed underground conduit runs and pulled wire for DC to DC converters and DC to AC inverters, installed control modules for torque tubes, installation/ termination of inverters and BESS.
This project was a commercial rough in for high school theatre and a welding/autoshop. I was at both of these projects from start to finish and did various tasks such as underground/ inwall rough in, wire pulling, terminating fixtures, lighting etc
Solar Panel Installation
This was my first job as an industrial electrician apprentice my tasks varied from ladder tray fabrication and installation, wire pulling, terminate e-stops, 480v 3 phase terminations