Summary
Overview
Work History
Education
Skills
Timeline
Generic

Corey Ray

Craigsville,WV

Summary

Hardworking professional well-versed in handling materials, operating machinery and supporting overall team and project needs. In-depth knowledge of compliance mandates governing site and worker safety. Focused on helping complete skilled work under deadlines.

Overview

13
13
years of professional experience

Work History

Construction Worker

New River Construction
Fayetteville, WV
05.2024 - Current
  • Utilized power tools such as saws, drills and sanders when necessary on projects.
  • Cleaned job sites daily removing debris, dirt and hazardous materials safely.
  • Built temporary supports during construction processes such as shoring up beams or columns until they are set in place permanently.
  • Mixed concrete, mortar and other materials to prepare building material.
  • Performed various carpentry tasks such as constructing walls, installing doors, windows and siding.
  • Installed formwork for concrete structures according to specifications.
  • Measured distances accurately using tape measures or laser measuring devices.
  • Maintained clean, safe working environment by removing debris from job site prior to shift completion.
  • Completed carpentry work and installed crown molding and wood flooring to meet customer preferences.

Construction Worker

Larry Mazzella Construction
Fenwick, WV
08.2021 - 07.2023
  • Operated a variety of tools to excavate, move and grade earth for foundations, trenches and roads.
  • Utilized power tools such as saws, drills and sanders when necessary on projects.
  • Cleaned job sites daily removing debris, dirt and hazardous materials safely.
  • Built temporary supports during construction processes such as shoring up beams or columns until they are set in place permanently.
  • Mixed concrete, mortar and other materials to prepare building material.
  • Performed various carpentry tasks such as constructing walls, installing doors, windows and siding.
  • Installed formwork for concrete structures according to specifications.
  • Measured distances accurately using tape measures or laser measuring devices.
  • Repaired damaged structures with appropriate materials including wood and metal components.
  • Used laser measuring tools to calculate lengths, widths, and heights.

Belt Operator

Carter Roag Coal Company
Mill Creek, WV
03.2021 - 07.2021
  • Removed debris from conveyor lines to prevent jams or malfunctions in the system.
  • Inspected belts for wear, tear, or other signs of damage and replaced as needed.
  • Operated belt conveyor systems to move products through production processes.
  • Operated conveyor, stacker and loader equipment, observing safety features to avoid accidents.

Commercial Roofer

Centimark Roofing
Charleston, WV
06.2018 - 07.2020
  • Applied waterproof coatings to protect roofs from water damage.
  • Utilized power tools such as nail guns, drills, saws and hammers while constructing new commercial roofs.
  • Collaborated with other tradesmen when necessary in order to complete projects efficiently.
  • Cut materials with hand tools such as scissors or utility knives according to measurements taken on site.
  • Ensured that all debris was removed from the job site after each shift.
  • Measured, cut, and installed insulation board, felt paper, and shingles for commercial roofs.
  • Climbed ladders and scaffolding in order to reach difficult-to-access areas of the roof.
  • Removed old roofing material prior to installation of new roofing system.
  • Disassembled old roofs and disposed of components.

Construction Worker

Craigsville Construction
Craigsville, WV
03.2011 - 06.2018
  • Operated a variety of tools to excavate, move and grade earth for foundations, trenches and roads.
  • Utilized power tools such as saws, drills and sanders when necessary on projects.
  • Cleaned job sites daily removing debris, dirt and hazardous materials safely.
  • Built temporary supports during construction processes such as shoring up beams or columns until they are set in place permanently.
  • Mixed concrete, mortar and other materials to prepare building material.
  • Performed various carpentry tasks such as constructing walls, installing doors, windows and siding.

Education

High School Diploma -

Webster County High School
Upperglade, WV
05-2010

Skills

  • Scaffold building
  • Power Tool Operation
  • Heavy Equipment Operation
  • Traffic routing
  • Team-oriented and dependable
  • Equipment Maintenance
  • Construction
  • Worksite preparation
  • Carpentry
  • Flooring Installation
  • Framing
  • Window Installation

Timeline

Construction Worker

New River Construction
05.2024 - Current

Construction Worker

Larry Mazzella Construction
08.2021 - 07.2023

Belt Operator

Carter Roag Coal Company
03.2021 - 07.2021

Commercial Roofer

Centimark Roofing
06.2018 - 07.2020

Construction Worker

Craigsville Construction
03.2011 - 06.2018

High School Diploma -

Webster County High School
Corey Ray