Work History
Education
Skills
Timeline
Generic

Cory Catanese

Meraux,LA

Work History

Installer

Ez Breeze Patio
2025 - 2025
  • Assisted in installation of patio products, ensuring adherence to safety protocols.
  • Learned operation of tools and equipment for efficient assembly processes.
  • Collaborated with team members to complete installations within designated timelines.
  • Supported quality control measures by inspecting finished installations for accuracy.
  • Laid out materials and system components to prepare for installation.
  • Built screened-in rooms.

Warehouse Manager

American Building Products
2023 - 2025
  • Managed inventory accuracy through regular cycle counts and reconciliation processes.
  • Supervised a team in daily warehouse operations, ensuring adherence to safety protocols.
  • Coordinated shipments and deliveries, maintaining effective communication with logistics partners.
  • Trained new staff on operational procedures and best practices for equipment usage.
  • Coordinated with vendors to verify timely delivery of materials and supplies, avoiding delays.
  • Oversaw warehouse staff and maintained efficiency in fast-paced environment.
  • Cleaned and maintained warehouse in compliance with OSHA safety standards.
  • Ran the aluminum sheet metal machine

Laborer/Plasterer

Pelican Plastering
2012 - 2014
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Helped with erecting scaffolding and ladders.
  • Mixed and poured concrete for variety of projects.
  • Used variety of hand and power tools to complete tasks.
  • Assisted in reducing material waste by accurately measuring, cutting, and assembling materials as needed.
  • Applied coats of plaster or stucco to structure surfaces using trowels, brushes or spray guns.
  • Patched holes in drywall and repaired plaster breaks and cracks.
  • Moved and cleared debris from work sites to dispose of in designated areas.

Laborer

Local 478 Movie Production
2009 - 2010
  • Maintained clean and organized work areas to ensure safety compliance.
  • Collaborated with team members to complete tasks on schedule.
  • Assisted in loading and unloading materials for various job sites.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Cleaned and maintained tools, equipment and worksites.
  • Moved and cleared debris from work sites to dispose of in designated areas.

Education

GED -

Nunez Community College
Chalmette, LA

Skills

  • Power tool operation
  • Pre-installation site prep
  • Multitasking
  • Staff supervision
  • Inventory and stocking
  • Customer service
  • Safety awareness
  • Positive attitude
  • Equipment operation

Timeline

Installer

Ez Breeze Patio
2025 - 2025

Warehouse Manager

American Building Products
2023 - 2025

Laborer/Plasterer

Pelican Plastering
2012 - 2014

Laborer

Local 478 Movie Production
2009 - 2010

GED -

Nunez Community College
Cory Catanese