Hardworking and highly skilled professional offering proven expertise in completing and installations with high-quality work. Efficiently cut and fabricate pieces to finalize designs. Excellent technical, project management and decision-making abilities developed several years of experience.
Overview
13
13
years of professional experience
Work History
Journeyman Plumber
Prime Mechanical and Construction ltd
, TX
07.2018 - 04.2022
Using blueprints, laid out scale drawings of pipe systems and supports.
Cut or threaded pipes to blueprint or drawing specifications.
Located and repaired leaks in water supply lines.
Performed rigging and forklift operations to maneuver parts and machinery.
Tested piping systems with water and air pressure to maintain balance and accuracy.
Maintained a clean worksite during installations by utilizing drop cloths and vacuuming debris from the area.
Installed and extended underground storm, sanitation, and water piping systems to connect fixtures and plumbing.
Performed pipe fabrication, installation and fitting according to proper specifications.
Conducted routine inspections of newly installed piping systems for potential problems before finalizing the job.
Adhered to safety protocols when handling hazardous materials such as lead or asbestos.
Journeyman Plumber
Letsos Co.
Houston, TX
07.2014 - 02.2018
Using blueprints, laid out scale drawings of pipe systems and supports.
Cut or threaded pipes to blueprint or drawing specifications.
Located and repaired leaks in water supply lines.
Performed rigging and forklift operations to maneuver parts and machinery.
Tested piping systems with water and air pressure to maintain balance and accuracy.
Maintained a clean worksite during installations by utilizing drop cloths and vacuuming debris from the area.
Installed and extended underground storm, sanitation, and water piping systems to connect fixtures and plumbing.
Performed pipe fabrication, installation and fitting according to proper specifications.
Conducted routine inspections of newly installed piping systems for potential problems before finalizing the job.
Journeyman Plumber
Prime Mechanical and Construction ltd
Houston , Pennsylvaniatx
11.2008 - 05.2014
Using blueprints, laid out scale drawings of pipe systems and supports.
Cut or threaded pipes to blueprint or drawing specifications.
Located and repaired leaks in water supply lines.
Performed rigging and forklift operations to maneuver parts and machinery.
Tested piping systems with water and air pressure to maintain balance and accuracy.
Maintained a clean worksite during installations by utilizing drop cloths and vacuuming debris from the area.
Installed and extended underground storm, sanitation, and water piping systems to connect fixtures and plumbing.
Performed pipe fabrication, installation and fitting according to proper specifications.
Adhered to safety protocols when handling hazardous materials such as lead or asbestos.
Assisted with troubleshooting and used alternative methods in emergency situations.