Project Manager/Program Manager/RTE
W. L. Gore & Associates, Inc.
Flagstaff, AZ
03.2014 - Current
Conducted regular status meetings with internal teams and external partners to track progress against established milestones.
Drafted reports summarizing progress made on projects for review by executive leadership team.
Ensured compliance with applicable laws, regulations, policies and procedures throughout the life cycle of each project.
Coordinated resources across multiple departments and teams as needed for successful completion of projects.
Implemented effective communication protocols between internal teams working on different aspects of a given project.
Facilitated resolution of conflicts between team members when necessary.
Actively sought out feedback from stakeholders throughout the duration of a project in order to identify areas needing improvement or adjustment.
Developed and maintained project plans, timelines, and budgets.
Maitenance & Calibration Lead
W. L. GORE
Flagstaff, AZ
02.2013 - Current
Provide leadership and mentorship for maintenance and calibration associates
Provide development opportunities for team members
In the process of implementing Change Order to turn on the e-signature function for Blue Mountain Measurement Data Templates
Engaged OPEX champion to work with my team to perform a SIPOC for maintenance and calibration activities
Lead Design for Manufacturing team for a new product
Completed Validation Report for Air Compressor system.
Start up assistance
ALPHAGRAPHICS
Flagstaff, AZ
01.2010 - Current
Developed business plan and marketing plan
Developed equipment budget and purchased equipment
Interviewed, hired and managed Account Executive & Customer Service Representative
Managed sales and marketing efforts to achieve monthly sales goals
Developed relationships with customers through networking, community events, and front counter sales
Quality Inspector/Packer
PRENT
Flagstaff, AZ
08.2012 - 02.2013
Inspected thermoform parts for poor form, embedded particles and cleanliness
Followed ISO 9000 quality procedures
Performed inspections in clean room environment.
Sales Associate
PUFFER-SWEIVEN, LP
Stafford, Texas
05.2002 - 12.2009
Provided engineered, strategic bid packages for top tier control systems and asset management products based on specifications provided by the client and knowledge of competitors’ products and bidding practices
Led development of multi-vendor proposals pulling together Safety System, Fire and Gas System, and Distributed Control System into a single value add solution
Developed winning proposals such as a $900K LNG project
This award led to a second LNG project at the same facility
Continued to provide technical and pricing support through the factory acceptance test as part of the sales relationship and customer support
Engaged Emerson proposal teams to develop bills of material and architectural drawings and acquired technical assistance
Developed profit margin analysis spreadsheet and participated in pricing reviews for competitive proposals
Developed relationships with customers and coordinated with outside sales to develop a strategy
Provided technical assistance to customers in developing control systems solutions tailored to suit their needs
Performed product demonstrations for clients for proof of concept and technology education.
Corporate Electrical Engineer
QUANTUM CHEMICAL CORP./MILLENNIUM PETROCHEMICALS, INC./EQUISTAR CHEMICALS, LP
Houston, Texas
05.1995 - 05.2002
Ensured reliability and maintainability of electrical design on capital projects while staying within the strategic business parameters of such projects
Assisted engineering firm with the design of an electrical distribution system upgrade as part of a $100MM plant expansion project
This included a 23,000 Hp synchronous motor fed by a captive transformer
Persuaded project and plant managements that this electrical upgrade was necessary to achieve the reliability required by the project scope
The other option was to reuse existing 30 year-old equipment, which would not have met the 90% onstream time required by the project
Designed 13.8kV distribution system as part of a HDPE unit debottleneck
This project required new 138kV substation to meet the new power demand
Convinced project team to use a main-tie-main design of the switchgear and a dual feed for the substation to improve reliability and maintainability of new substation
Designed and justified back up feeder for the surface water substation in an olefins plant
This included a new feed from Reliant HL&P and the transfer scheme between the existing feed and the backup
Inspected the switchgear and reviewed drawings
Worked with project management and plant engineering to understand the differing issues and goals of both parties and resolved these differences for the best outcome
Researched new technology for the purpose of improved corporate wide reliability
For example, I researched partial discharge cable testing technology and applied this technology to uncover potential failures during a scheduled plant outages
Reviewed coordination study for ethylene plant
Developed near-term and long-term reliability improvements for plant
Planned electrical preventative maintenance activities for plant outages
Worked with plant engineers to identify scope of work and risks associated with testing
Determined critical path activies
Scheduled both in house and vendor maintenance activities
Worked alongside plant engineers during outages to provide additional support
Revised and implemented corporate electrical specifications.
Instrumentation and Electrical Maintenance Engineer
QUANTUM CHEMICAL CORP./MILLENNIUM PETROCHEMICALS, INC./EQUISTAR CHEMICALS, LP
Houston, Texas
05.1995 - 09.1999
Specified and planned the replacement of a motor control center
Assisted with construction of LLDPE unit Reviewed final drawings for adherence to standards, reliability, and maintainability
Addressed National Electric Code violations during construction
Developed lock out procedure for use during construction
Developed procedure to energize new switchgear
Inspected electrical equipment
Lead night loop check and start up crew
Evaluated motor maintenance shops for the purpose of forming an alliance
Evaluations were done based on safety, work procedures, motor storage availability, and shop equipment
Provided technical support and review for capital projects to ensure the designs were reliable and maintainable
Reviewed motor schematics, loop drawings, and instrument data
Visited construction sites to inspect the construction and to assist by answering questions that arose
Provided engineering assistance for technicians on a daily basis
Planned preventative maintenance activities when unexpected plant outages occurred
Designed instrument/electrical portion of small projects to improve reliability and production
Designed closed loop temperature control system for catalyst pumps using Moore single loop controller
Designed minimum flow line to prevent pump cavitations
Evaluated need for new instrumentation when process flow was increased
Recommended instrumentation based on the needs of the process controller
Designed and implemented instrument/electrical portion of small projects to improve reliability and production.
Electrical Power System Engineer with Safety and Mission Assurance
GHG CORPORATION/NASA JSC
Houston, Texas
01.1997 - 08.1997
Responsible for the technical accuracy of the Failure Modes and Effects Analysis of the electrical power distribution system on the International Space Station
Responsible for the technical accuracy of the Hazard Reports pertaining to the electrical power distribution system on the International Space Station
Completed class in system safety which provided a basic understanding of hazard analysis concepts based on NASA requirements.
Education
M.S. - Electrical Engineering
University of Missouri-Rolla
01.1995
B.S. - Electrical Engineering
University of Missouri-Rolla
01.1992
Skills
Project Management
Project Planning
Risk Management
Project Development
Cross-Functional Collaboration
Project Scope Analysis
Requirements Gathering
Coaching and Mentoring
Agile Methodology
Affiliations
Cosplay
Tabletop Gaming
VIdeo Gaming
Certification
Agile Scrum Master Certification
SAFe POPM Certification
Timeline
Project Manager/Program Manager/RTE
W. L. Gore & Associates, Inc.
03.2014 - Current
Maitenance & Calibration Lead
W. L. GORE
02.2013 - Current
Quality Inspector/Packer
PRENT
08.2012 - 02.2013
Start up assistance
ALPHAGRAPHICS
01.2010 - Current
Sales Associate
PUFFER-SWEIVEN, LP
05.2002 - 12.2009
Electrical Power System Engineer with Safety and Mission Assurance
GHG CORPORATION/NASA JSC
01.1997 - 08.1997
Corporate Electrical Engineer
QUANTUM CHEMICAL CORP./MILLENNIUM PETROCHEMICALS, INC./EQUISTAR CHEMICALS, LP
05.1995 - 05.2002
Instrumentation and Electrical Maintenance Engineer
QUANTUM CHEMICAL CORP./MILLENNIUM PETROCHEMICALS, INC./EQUISTAR CHEMICALS, LP