Summary

Resourceful Technician known for high productivity and efficiently completing tasks. Skilled in troubleshooting, preventive maintenance, and equipment repair. Excel at time management, problem-solving, and communication, ensuring seamless operations and team coordination.

Overview

13
13
years of professional experience

Work History

Tech 2

MasTec
dallas, tx
03.2025 - 04.2026
  • Inspected rigging for defects, documented findings, and coordinated replacements to maintain safety standards.
  • Check all rigging if there's any bad take a picture, document it and send it in and replace it.
  • Check document that tells you how much everything weighs and find the right slings and shackles to do job
  • Mark out the drop zone with orange cone
  • Stage everything out: dead mans, rotor stand and the rigging to tie it down.

Tech 2

Pearce Renewables
Stephenville, Texas
09.2022 - 05.2024
  • Communicate with the Crane to bring down major components
  • Move to the very top where we install the nacelle
  • Communicate with the Crane to bring down major components
  • Ensured crew inspected harnesses and tools each morning for safety compliance
  • Replaced defective components or parts as needed.
  • Replaced defective components or parts.

Lead Topout

Wood Duncan Craft
Duncan, South Carolina
01.2021 - 04.2021
  • Check document tells you how much everything weighs and find the right slings and shackles to do job
  • Mark out the drop zone with orange cone
  • Stage everything out: dead mans, rotor stand and the rigging to tie it down.
  • Start the day out greasing equipment and look over machines to make sure everything is to par
  • Directed dump truck operations and utilized dozer and road grader for material application
  • Checked over tools to ensure proper alignment for asphalt application. to make sure it's to grade and level
  • Inspected rigging and tools to ensure safety and readiness
  • Start the day out greasing equipment and look over machines to make sure everything is to par
  • Applied water on construction site using a water truck to control dust. with a water truck
  • Released crane and initiated blade installation process

Apprentice Plumber

Blackburn Plumbing
Durant, Oklahoma
02.2018 - 12.2019
  • Performed various rough in tasks on construction sites
  • Use an excavator and shovel to dig ditches and unload all material
  • Measure out everything to make sure pipes are going to fall where they are supposed to
  • Read blueprints, glue pipe and fittings together while maintaining elevation
  • Use shovel and excavator to cover the ditches back up
  • Assisted with top out responsibilities during plumbing installations
  • Drilled holes for water lines and drains to ensure proper plumbing layout
  • Installed stubs for water supply and drainage systems during plumbing installations
  • Installed hot water heater and tankless hot water systems to enhance water heating efficiency
  • Hook up sinks garbage disposals, dish washers, bathtubs and shower

Heavy Equipment Operator

Rk Hall
Denison, Texas
03.2018 - 11.2018
  • Front end loader grease and fill up the equipment
  • Load material in a hopper to mix with concrete
  • Pushed material upward after it was dumped to ensure proper material flow.
  • Logged and entered tickets into the computer system for accurate tracking.
  • Remove excess material from loading pad to maintain safety and efficiency
  • Cleaned surrounding areas of the plant and powered down equipment to maintain safety.

Combo Pipe Welder

G2 Construction
Monroe, Louisiana
02.2013 - 01.2015
  • Read blueprints and see what kind of pipe we will be using in the paper mill
  • Identified material type as stainless or carbon pipe for project requirements.
  • Positioned pipe in stand, beveled edges with grinder, and cleaned surfaces with wire brush for optimal preparation
  • Used two-hole level to ensure flange alignment for stainless steel connections.
  • Executed root pass, fill pass, and cap pass during welding process.
  • Welded pipe assemblies and operated JLG lift to transport completed sections to designated areas with permits
  • Use lockout/tagout and ensure you have all permits
  • Aligned and secured pipe, then performed welding to ensure strong connections.
  • Conducted cleanup after welding, ensuring a fire watch remained for 30 minutes.

Education

High School Diploma -

Bennington High School
Bennington, OK

Skills

  • Rigging inspection
  • Equipment operation
  • Equipment maintenance
  • Troubleshooting methods
  • Problem resolution
  • Safety documentation
  • Project planning
  • Work planning
  • Time optimization
  • Deadline management
  • Leadership
  • Teamwork
  • Critical thinking
  • Technical drawing interpretation

Timeline

Tech 2

MasTec
03.2025 - 04.2026

Tech 2

Pearce Renewables
09.2022 - 05.2024

Lead Topout

Wood Duncan Craft
01.2021 - 04.2021

Heavy Equipment Operator

Rk Hall
03.2018 - 11.2018

Apprentice Plumber

Blackburn Plumbing
02.2018 - 12.2019

Combo Pipe Welder

G2 Construction
02.2013 - 01.2015

High School Diploma -

Bennington High School