Skilled in overseeing construction trades and extraction work with solid background in coordinating diverse teams and managing projects from inception to completion. Possess strong leadership abilities, effective communication skills, and capacity to solve problems efficiently. Improved workflow and team coordination on multiple projects, enhancing project completion rates and quality of work. Demonstrated adaptability to changing industry trends and technologies, ensuring project specifications are met with precision.
Overview
22
22
years of professional experience
Work History
Superintendent/Project Manager
petroplex pipe and Construction
Midland, Texas
06.2025 - Current
Coordinated daily operations and ensured seamless workflow across multiple construction sites.
Implemented effective project management techniques to maintain budgetary constraints and timelines.
Reviewed and approved project schedules, ensuring timely completion of milestones.
Prepared comprehensive reports detailing project status, issues, and recommendations for management.
Maintained accurate records such as daily logs, time sheets, inspection reports, for each project.
Planned, managed and coordinated construction activities to ensure timely completion of projects.
Coordinated installation activities for projects to promote smooth workflow and achieve quality standards.
Directed all phases of construction projects, ensuring adherence to budget and timeline constraints.
Drafted reports summarizing progress made on projects for review by executive leadership team.
Drafted project construction schedule and updated as job progressed.
Generated and tracked change orders and other contractual modifications affecting budget and schedule.
Prepared cost estimates for projects of varying sizes.
Field Supervisor
MR-Braz and Associates
Azle, Texas
10.2023 - 06.2025
Led daily field operations to ensure compliance with safety and quality standards.
Conducted regular site inspections to monitor project progress and enforce adherence to timelines.
Facilitated effective communication between field teams and management to address project needs.
Prepared detailed reports on project status, including progress, challenges, and solutions.
Conducted safety meetings to promote a culture of safety and awareness among field personnel.
Collaborated with clients to understand project specifications and ensure satisfaction.
Monitored timelines, set up order of operations and managed field schedules.
Investigated accidents or incidents that occurred in the workplace; documented findings accordingly.
Read specifications, blueprints or schematics to determine project requirements or to plan procedures.
Prepared and submitted detailed progress reports to senior management.
Fostered strong communication between field and office staff, enhancing project coordination and execution.
Project Manager/Rig Welder
ProTorque
Midland, TX
02.2023 - 10.2023
Built and established strong partnerships with teams, vendors and contractors.
Created project plans with established timelines, assigned to appropriate teams and managed workflow throughout construction.
Managed contracts with vendors and suppliers by assigning tasks and communicating expected deliverables.
Identified needs and coordinated resource allocation to deliver quality standards on time and within budget.
Made changes to project scope and cost and implemented most effective change management processes to keep project up-to-date.
Generated and tracked change orders and other contractual modifications affecting budget and schedule.
Project Manager/Supervisor/Rig Welder
RG Welding
Midland, TX
07.2021 - 02.2023
Supervised project teams to ensure successful completion of projects within budget and timeline constraints.
Prepared cost estimates for projects of varying sizes.
Make x-ray quality welds.
Hook up well heads, Boosters, Compressors, Pipeline, SWD's and build compressor facilities.
Read drawings designed by engineers (P&IDS).
Rig Welder Lead
Petroplex pipe and construction
Midland, TX
03.2015 - 07.2021
Performed pre-welding inspections on welding equipment and materials to ensure safety and quality standards were met.
Installed various piping systems on oil rigs using different welding techniques.
Repaired damaged parts in accordance with standard operating procedures.
Ensured that all safety protocols were followed during welding operations.
Developed new techniques for improving the efficiency of welding processes.
Maintained detailed records of work completed, including material used, quantity, time taken.
Welded parts together on metals such as carbon steel, stainless steel and alloys.
Welded components in flat, vertical or overhead positions.
Rig Welder
Elkhorn
07.2013 - 05.2015
Performed pre-welding inspections on welding equipment and materials to ensure safety and quality standards were met.
Build and fabricate pipelines
Determined welding strategies using metallurgy knowledge, geometry and welding techniques.
Set up equipment and welded parts according to welding chart specifications and type.
Welder
Cameron
Magnolia, TX
02.2010 - 07.2013
Set up welding machines and related equipment to weld parts in flat, vertical, or overhead positions according to specifications.
Fabricate metal components using layout tools and welding equipment.
Inspect completed work for conformance to specifications.
Maintain a clean working environment ensuring that all safety regulations are adhered to at all times.
Welded pipes in accordance with industry standards, using a variety of welding techniques.
Assisted in training junior welders in proper safety protocols.
Welded and worked with stainless steel and various alloys.
Welder
Caterpillar
Decatur, IL
01.2008 - 01.2010
Fabricated and welded components to assemble structural forms, such as machinery frames, tanks, pressure vessels, and furnace shells.
Monitored the fitting, burning, and welding processes to avoid overheating of parts or warping, shrinking, distortion, or expansion of material.
Constructed templates and jigs for fabrication according to blueprints.
Gathered required materials for each project in order to meet production deadlines.
Performed gas tungsten arc welding with filler rods as needed.
Welder
National Maintenance & Repair
Hartford, IL
06.2007 - 01.2008
Fabricated and welded components to assemble structural forms, such as machinery frames, tanks, pressure vessels, and furnace shells.
Set up welding machines based on the job at hand.
Utilized oxyacetylene torches for preheating metals prior to welding or bending them into desired shapes.
Heavy Equipment Operator
United States Marine Corps
07.2003 - 07.2007
Managed daily operations of heavy equipment fleet, including troubleshooting and preventative maintenance.
Operated multiple pieces of heavy equipment in a safe and efficient manner to excavate land for construction projects.
Operated excavators and other construction equipment to properly grade land.
Operated front end loader to move dirt and different base materials.
Loaded and offloaded rocks, debris and other materials from heavy equipment.
Operated cranes to lift, move and place materials in designated areas.