Summary
Overview
Work History
Education
Skills
Affiliations
Timeline
Generic

DANIEL LATHROP

Belton

Summary

Dynamic GSE Manager with a proven track record at GigIndustrial, excelling in project management and component fabrication. Spearheaded the design of innovative testing systems, optimizing processes and enhancing efficiency. Adept at cross-functional collaboration and quality assurance, delivering significant cost savings and elevating operational performance in high-stakes aerospace environments.

Overview

15
15
years of professional experience

Work History

GSE Manager

GigIndustrial
Briggs
07.2023 - 02.2025

Designed and fabricated an engine test cart.

Designed and fabricated a component stand.

Created GSE workshop and clean room area.

Performed research and development testing for aerospace components.

Performed research and development for engine and chamber testing.

I was the acting project manager for the portable hypergolic engine stand. Research and quoted components, fittings, hardware, and materials.

Help design and fabricate a portable hypergolic engine stand.

Created an inventory system using the Excel program.

  • Developed detailed project plans and tracked progress against goals.
  • Collaborated with cross-functional teams to identify areas of improvement in processes related to project execution.
  • Recommended strategies for optimizing efficiency while still meeting organizational objectives.

Lead Systems Fabrication Technician

Firefly Aerospace
01.2019 - 01.2022
  • Completed and implemented projects by overseeing the design, fabrication, installation, and project planning of multiple stands, including the Structure Stand, Component Stand, 1st & 2nd stage Stand, Helium shed, and COPV testing stand.
  • Ensured smooth operations and availability of necessary resources by managing shop inventory, fittings, components, and tooling.
  • Improved skills and enhanced productivity among the team by training engineers and technicians on test systems, fabrication techniques, job planning, and proper tool usage.
  • Facilitated efficient project planning by working with engineers to create accurate bills of materials for full systems or full system test stands.
  • Lowered production time and optimized workflow by creating and fabricating special tooling, such as 2-panel stands, 2 mobile tube benders, and a GSE mobile cart for facing and flaring.
  • Enabled easy retrieval of inventory items by creating inventory system via Excel program and implementing color codes and bin locations for over 10K pieces.
  • Eliminated fuel waste during testing and saved the company millions of dollars by building fuel return system for the stage stand.
  • Created a mobile 6k Helium cart, specifically designed for testing system functions and conducting leak checks for the Blue Ghost moon lander.
  • Engineered and built a mobile Lox flight valve cart, capable of testing flight valves at Lox temperatures for flight vehicles.
  • Increased helium pressure and pressure speed by researching, developing, and installing high-pressure Hydro-Pac system at the stand.
  • Realized 11-fold boost in the efficiency of testing check valves by fabricating mobile IPA bath check Valve cart.
  • Constructed launch site for the first flight at Vandenburg Air Force Base, California within six months by working with cross-functional teams.

Test Technician and Fabricator

SPACE X
01.2014 - 01.2019
  • Manufactured different sizes of tubing for over 50 space flight missions across multiple on-site locations while ensuring precise construction and adherence to quality standards.
  • Rolled out complex aerospace systems by creating, installing, and fabricating system components and two full test facilities.
  • Facilitated successful operation and performance of critical systems by handling tube construction, component selection, and testing for a wide range of systems, including pneumatics, GN2, helium, liquid oxygen, gaseous oxygen, RP1 fuel, nitrogen tetroxide, triethyl borane, methane, and hydraulics.
  • Advanced space exploration by building second-stage structures, Raptor engines, Falcon 9 rockets, and Dragon stands/fly tests.
  • Reduced downtime by investigating and successfully resolving 26 projects involving unaccounted or missing components.
  • Assured reliable and efficient operations by producing multiple test panels via appropriate materials for all required systems, including fittings, O-rings, seals, and gaskets.
  • Attended classes to learn 5S methodology (sort, set in order, shine, standardize, sustain) for teaching and promoting a clean, organized, and efficient work environment.
  • Successfully dismantled the entire Spaceport America New Mexico site by effectively separating, loading, and shipping materials to other locations as required.
  • Elevated performance reliability by constructing complex helium and GN2 test panels specifically designed for landing leg functions in California.
  • Completed project within time by replacing pre-cut, drilling, and missing components panel with a medium-pressure version as per engineer blueprints precisely in decimals and maintaining component-to-component spacing.
  • Reduced expenses by $200K per day for the company by guiding launch facility lox system for COPV (Composite Overwrapped Pressure Vessel) testing.
  • Raised efficiency in testing processes by creating specialized $300K test cart that increased the testing ratio from 1 to 12 components and leveraging only 3D pictures as references.
  • Streamlined the assembly process by developing optimal piping and plumbing supply systems for test panel builds, including separating, arranging, and labeling over 200 fittings in bin locations through part numbers.

Modification Installer and Quality Control Team Leader

BAE SYSTEMS
01.2010 - 01.2013
  • Eliminated turret, engine, and interior components, including upper and lower fuel cells with cabling and relays to advance Bradley project's timeline.
  • Enhanced vehicle functionality by upgrading fittings, installing batteries, wiring, relays, and interior stowage, along with upper and lower fuel cells.
  • Realized highest production rate at each site for three consecutive years by directing cross-functional teams.

Education

High School Diploma -

Sheffield Area High School
Sheffield, PA
06-1995

Skills

  • Project management
  • Engine testing
  • Component fabrication
  • Inventory management
  • Process optimization
  • Cross-functional collaboration
  • Technical documentation
  • Quality assurance
  • Research and development
  • Operations management
  • Goal setting
  • Policy and procedure development
  • System fabrication
  • Component selection
  • Attention to detail
  • Problem solving
  • Welding techniques
  • Machine operation
  • Metal fabrication
  • Hydraulics and pneumatics
  • Sheet metal work

Affiliations

  • motocross
  • running

Timeline

GSE Manager

GigIndustrial
07.2023 - 02.2025

Lead Systems Fabrication Technician

Firefly Aerospace
01.2019 - 01.2022

Test Technician and Fabricator

SPACE X
01.2014 - 01.2019

Modification Installer and Quality Control Team Leader

BAE SYSTEMS
01.2010 - 01.2013

High School Diploma -

Sheffield Area High School
DANIEL LATHROP