Work Preference
Summary
Overview
Work History
Education
Skills
Timeline
Generic
Daniel Ligon-Bruno
Open To Work
Verified
This profile is verified using an email address.

Daniel Ligon-Bruno

Post Falls,ID

Work Preference

Job Search Status

Open to work
Desired start date: Flexible

Desired Job Title

Log home restoration Lead Flooring InstallerWater OperatorLead Mason Industrial Epoxy and Urethane Installer

Location Preference

HybridOn-SiteRemote
Location: Post Falls, IDTacoma, WA
Open to relocation: Yes

Summary

Agile and adaptable staff leader with stellar work history, motivational approach and upbeat nature. Skilled at training employees and leveraging organized approaches to handle daily planning, scheduling, and customer service requirements. Forward-thinking and industrious with diplomatic communication style focused on maximizing engagement and satisfaction.

Overview

22
22
years of professional experience

Work History

Prefab paint/ stain shop manager

The Paint Guys
Post Falls, Idaho
03.2026 - Current
  • Oversaw employee performance, corrected problems, and increased efficiency to maintain productivity targets.
  • Implemented store policies and procedures to remain compliant with corporate guidelines.
  • Quality control, equipment maintenance, project management and coordination with client time lines.

Log home restoration

Chewelah Paint
Chewelah , Wa
12.2024 - 02.2026
  • Skilled at working independently and collaboratively in a team environment.
  • Passionate about learning and committed to continual improvement.
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Demonstrated creativity and resourcefulness through the development of innovative solutions.
  • Operation of heavy equipment such as telescopic boom lifts, telehandlers and scissors lifts in tight spaces within OSHA compliance.
  • Fast paced, quick learning, adaptive highly productive working environment.

Lead Flooring Installer

Roe Paint
Boise, ID
08.2023 - 11.2024
  • Installation of 1/4" and hybrid vinyl flake floors. Including garages, driveways, patios and pool decks.
  • Installation of quartz system. Including commercial kitchens, and pool decks.
  • Installation "grind and seal" polished concrete.
  • Installation Urethane cement deck systems
  • Oversaw and trained installation crew to uphold quality standards.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Installed quality flooring at client sites while ensuring adherence to customer service standards.
  • Inspected work site before installation to identify potential risks and hazards.

Water Operator

Gem state water
Coeur D'Alene, ID
01.2020 - 04.2022
  • Collected samples to assess water quality and tested for pH, hardness and sediment levels.
  • Monitored chemical feed pumps to verify proper chemical dosage in treated water.
  • Maintained and calibrated chemical feed systems, pumps, valves, meters and other equipment in the water distribution system.
  • Inspected equipment or monitored operating conditions, meters, and gauges to determine load requirements and detect malfunctions.
  • Conducted daily inspections of the facility's equipment and reported any issues to management.
  • Troubleshot electrical components associated with pumps, motors, filters and other pieces of equipment within the plant.
  • Assisted in safe unloading and storage of chemicals.
  • Coordinated with outside contractors during repairs or maintenance activities at the site.
  • Repaired leaks in the distribution system using appropriate tools and techniques.
  • Reviewed safety protocols regularly to ensure safe working conditions at all times.
  • Resolved customer complaints concerning water quality or service interruptions in a timely manner.
  • Collected and sent water samples to health labs for review.
  • Recorded operational data, personnel attendance or meter and gauge readings on specified forms.
  • Performed grounds and equipment maintenance to keep facility running smoothly.
  • Provided technical assistance to personnel regarding operational problems with pumps, valves and other equipment.
  • Followed EPA and OSHA regulations to maintain safety of water and personnel.

Lead Mason

Bruno masonry
Hayden, ID
03.2016 - 12.2019
  • Installed anchors in masonry walls to support pipes, conduits, door frames and other fixtures.
  • Laid bricks or blocks in the proper configurations according to plans.
  • Erected brick walls and stone columns, using trowels, levels and other tools.
  • Restored mortar joints by removing mortar to exact depth and replacing with fresh mortar.
  • Repaired or altered structural and superficial damage to various masonry work and surfaces.
  • Sealed joints between bricks, blocks and stones using caulking compounds or grout.
  • Applied stains, sealer and curing agents to masonry.
  • Applied waterproofing materials on exterior surfaces of structures as directed.
  • Smoothed final surfaces by removing excess mortar and finishing joints.
  • Constructed retaining walls to hold back soil behind them.
  • Built bracing systems, forms and supports for pouring foundations and construction.
  • Placed steel reinforcement bars in forms prior to pouring concrete footings and foundations.
  • Mixed mortar and grout and used to adhere building materials and create structures.
  • Mixed mortar to the correct consistency for laying bricks or stones.
  • Readied work areas by clearing and smoothing surfaces and adjoining structures.
  • Moved bricks, tools and supplies with equipment such as forklifts and hand trucks.
  • Prepared concrete by mixing water with cement, sand and gravel.
  • Set tile into mortar beds for floors, patios, showers or countertops.
  • Checked vertical alignment of courses using plumb bobs, levels and string lines.
  • Installed lintels above doors or windows to provide structural support.
  • Calculated mixture ratios, angles and square footage to determine materials needed and plan layouts.
  • Cut stone or brick into shapes required for specific jobs.
  • Broke or cut bricks, tiles and blocks to size, using trowel edge, hammer or power saw.
  • Assembled scaffolding around buildings for access during construction projects.
  • Caulked crevices in masonry work for weather-proof seal.
  • Configured expansion joints and edges with related tools.
  • Installed manufactured stone veneer products on interior or exterior walls.
  • Created decorative designs such as arches and columns with brick, block and stone veneers.
  • Removed broken masonry and constructed replacement sections for walls and floors.
  • Removed broken masonry and constructed replacement sections for walls and floors.
  • Laid bricks or blocks in the proper configurations according to plans.

Industrial Epoxy and Urethane Installer

Covey Construction
Hayden, ID
01.2014 - 12.2015
  • Installation of industrial grade concrete coatings, including epoxy, cove and Urethane cement.
  • Concrete floor prep for Installation of coatings
  • Travel work throughout the pacific northwest.

Mason/ Mason's Tender

Bruno masonry
Hayden, ID
03.2004 - 12.2014
  • Constructed durable walls using brick, stone, and concrete materials.
  • Installed architectural features like chimneys and columns with precision.
  • Mixed and applied mortar for efficient masonry installations.
  • Tended to the mason's needs including, station prep, surface prep, loading materials, mixing mortars and concrete, setting scaffolding and tarping, poring and finishing concrete, laying stone, brick and block, and finishing/detailing work.

Education

High School Diploma -

Coeur D'alene High School
Coeur D'alene, ID
01-2005

Some College (No Degree) - Prerequisites

North Idaho College
Coeur D'alene, ID

Skills

  • Lead installation of vinyl flake flooring
  • Installation of quartz flooring
  • Installation of industrial epoxy coatings
  • Grind and seal concrete
  • Concrete repair and prep
  • Installation of troweled materials
  • My work is a core value in my life

Timeline

Prefab paint/ stain shop manager

The Paint Guys
03.2026 - Current

Log home restoration

Chewelah Paint
12.2024 - 02.2026

Lead Flooring Installer

Roe Paint
08.2023 - 11.2024

Water Operator

Gem state water
01.2020 - 04.2022

Lead Mason

Bruno masonry
03.2016 - 12.2019

Industrial Epoxy and Urethane Installer

Covey Construction
01.2014 - 12.2015

Mason/ Mason's Tender

Bruno masonry
03.2004 - 12.2014

Some College (No Degree) - Prerequisites

North Idaho College

High School Diploma -

Coeur D'alene High School
Daniel Ligon-Bruno