CoSA City Hall Renovation (2018-2020)
- Managed LEED documents and oversaw project requirements to achieve LEED Silver
- Maintained project documents on Plan Grid
- Assisted Project Superintendent in supervising exterior scope trades to include earthwork, utilities, electrical underground, and masonry.
- Created and distributed OAC, subcontractor, and internal meeting agenda and minutes
- Assisted in QA/QC by managing project punch lists and verifying completion
City of Jourdanton Splash Pad & Pool (2020-2021)
- Wrote scopes of work for subcontractor buy-out
- Soley managed RFIs/submittals for duration of the project
- Assisted in QA/QC with Project Superintendent
- Managed change order logs and assisted in pay app review
- Presented change orders before the Mayor and City Council for approval
Alamo Phase 1 - Clark-Guido Joint Venture (2021-2022)
- Managed RFIs/submittals in Field Wire and owner software
- Assisted Project Superintendent to supervise Phase 1 landscaping and utilities scope as team transitioned to other phases
- Coordinated with SAWS for inspections and dye test requirements
- Assisted in scheduling CoSA inspections
- Managed closeout-completion
Alamo - Ralston Family Collection Center - Clark-Guido Joint Venture (2022-2023)
- Trade Manager for building envelope scope to include waterproofing, roofing, storefront, metal panels, and masonry trades
- Oversaw third-party testing for waterproofing and water leak detection
- Assisted Project Superintendent in creating look-a-head schedules and managing trades in the field
- Managed project documentation in Field Wire
- Managed QA/QC specific to my assigned trades
Alamo Phase 2A/2B - Clark-Guido Joint Venture (2023-2024)
- Trade Manager for canopy roof, decking, tree protection, and electrical site work
- Utilized ProCore for project record documents
- Coordinated with CPS for pre-cons, site inspections, and scheduling work
- Managed OAC meetings and subcontractor weekly check-in meetings
- Coordinated with Alamo Trust Inc for owner deliverables that impacted the project
- Managed the project material tracker log that was tied to the project schedule and submittal log
NISD Baseball/Softball Complex (2024-2025)
- Wrote scopes of work for subcontractor buy-out
- Identified cost savings and scope double-up
- Managed RFIs/submittals in Guido PM software
- Created OAC agendas and distributed meeting minutes
- Managed third-party testing requirements and documentation