Focused Electrical Engineer with background in power systems, telecommunications and special system. In-depth understanding of control and power-delivery systems. Experienced in developing technical studies and investigations on software such as SKM.
• Coordination of personnel, which includes coordination of daily tasks to comply with the targets set in time and form, interdisciplinary coordination of projects, definition of drawing and modeling criteria for each project.
• Design and inspection during the construction of electrical power systems, medium and low voltage systems, fire alarm, telecommunications, CCTV and access control and BMS system, includes calculation memories, reports, specifications, value engineering review.
• Development of projects in Costa Rica, Mexico, Honduras, Panama and the Dominican Republic, in industrial type projects (medical, microprocessors and food), distribution centers CEDIs, governments, hoteliers, hospitals (clinics), commercial, multi-family (apartment towers) and luxury residential.
• Design and inspection of buildings of more than 25,000 square meters, projects up to 5000kVA of installed power.
• Electrical design focused on costs according to customer budget.
• Information on the main projects in the attached document.
• Electrical Engineer in the Construction and Design team of Projects.
• Responsible for electrical construction in assigned projects, monitoring project overview, schedule compliance, coordination with customers, suppliers of equipment and materials and equipment, administration of subcontracts, Quality control in the field, preparation of change orders.
MAIN PROJECTS
PROJECTS IN WHICH I HAVE HAD A PARTICIPATION AS PRINCIPAL ENGINEER IN DESIGN-INSPECTION-BUILD OR A SECONDARY OR PARTIAL PARTICIPATION IN THEM.
MOST RELEVANT HOSPITALITY PROJECTS
2019 Hilton Hampton Inn, Alajuela, 4-level building of rooms, 2,435.0 sqm, - Desing and inspection
2019 Hotel Westin - Reserva Conchal Expansion, Guanacaste, 60 rooms, 6,300.0 sqm – Transformer 500kVA Desing
2018 Hotel Andaz Residences, 5 apartment buildings, Peninsula Guanacaste, 6,375.0 sqm – 5 transformer 225kVA - Desing
2019 Hampton Inn Rohrmoser Hotel, San Jose, 17-level building, 13,000 sqm - transformer 750kVA Desing
2019 Fiesta Resort Hotel, Electric remodeling of main building and BOH commissioning - Desing and inspection
MOST RELEVANT RESIDENTIAL PROJECTS
2018 635 Four Season Residence, Papagayo Peninsula, Guanacaste, 1,692.0 sqm - Desing
2018 Alma Escalante Vertical Condominium, 10-story building. Escalante, San Jose, 4,585.0 sqm - Desing and inspection
2018 Vertical Condominium AE-402, Avenida Escazú, 11-story building, 6,530.0 sqm, transformer 300kVA - Desing
2018 Rivers Residence, Jacó, Puntarenas, 764.0 sqm - Desing
2016 COCOY Condominium, Escazú, 4-story building, San Jose, 12,864.0 sqm, transformer 300kVA - Inspection
2016 Golfside Vertical Condominium, Guayabos Curridabat, 3 buildings of 7 levels each, 28,300.0 sqm, transformer 300kVA - Inspection
MOST RELEVANT COMMERCIAL PROJECTS
2021 Multitenant 2 Phase 2 La Lima Free Zone, Cartago, industrial warehouse, 14,486.0 sqm - Inspection
2018 Tower AE104 Medical, 5-level medical consulting building, Avenida Escazú, San Jose, 11,121.0 sqm, transformer 500kVA - Desing and inspection
2018 Momentum Pinares Business Center, Curridabat, 7-story office center, 630kVA dry-type medium voltage transformer, 18,500.0 sqm - Inspection
2017 TCM APM Terminal, Construction of 3-level administrative building, workshop and maintenance buildings. Construction of facilities to a GIS-type high voltage and medium voltage substation for distribution cells at 35kV. Administration of contract for the construction of a temporary solution of port cranes with a 5000kVA 35kV-20kV transformer. Moín, Limón - Contruction
2017 Pinares Place Commercial Center, Pinares, 3-story shopping center, 6,000.0 sqm, transformer 300kVA - Inspection
2018 Free Zone ATMOS Leumi, Lagunilla Heredia, Shell office building, with 1250kVA dry-type transformer. Industrial Shell area of 23 warehouses and administrative building, exterior works, 757,704 sqm - Desing and inspection
MOST RELEVANT OFFICE PROJECTS
2020 Tribunales de Justicia (Court of Justice), San Carlos, Alajuela, 3-level building, 5,375.0 sqm, transformer 300kVA- Desing
2019 Tribunales de Justicia, (Court of Justice), inspection, Puntarenas, installed capacity 2000kVA, 23,500.0 sqm - Inspection
2018 EY Office, Panama, 1,200 sqm – Desing
MOST RELEVANT INDUSTRIAL PROJECTS
2020-2021 Microprocessor Production Plant located in Belén INTEL, Heredia, Design and inspection of electrical expantion medium and low voltage distribution systems with redundant systems in medium voltage substations and 2500kVA transformers for manufacturing operations.
Design of 7 medium voltage subestation 35kV for distribution and 2 subestation 4.16kV to mechanical equipment. Design and inspection of distribution systems with 4000A and 2000A using busways and transformer type substation of 2500kVA
Fire alarm, ligthing, special outles, mechanical feerders - Desing and inspection
2021 Microprocessor Production Plant located in Belén INTEL, Heredia, Electrical design of laboratories with an installed capacity of 2500kVA
2018 Cargill CEDI. Refrigerated Distribution Center, medium voltage design with SE SM6 cells, 2-story administrative building, complementary buildings, San Rafael de Alajuela, 15,000.0 sqm, Redundance transformers 1500kVA - Desing and inspection
2020 Cargill CEDI. Refrigerated Distribution Center, San Pedro Sula Honduras, 5188 sqm - Desing
2020 SMC Ltd., Coyol, Alajuela, expansion of industrial manufacturing plant of medical devices, 9,600.0 sqm, transformer 500kVA - Desing and inspection
2016 Microprocessor Production Plant located in Belén INTEL, Design-Construction, remodeling, conversion of spaces, laboratories. Site Belén CR1 CR2 CR3. sqm - Construction
2017 ST Jude Medical, Coyol, Alajuela, construction of internal remodeling projects. - Construction
2022 Edwards Lifesciences, La Lima Cartago, Clean Room #5 – Inspection
2022 Edwards Lifesciences, La Lima Cartago, Clean Room #4 - Inspection
2024 Boston Scientific Heredia , North and south expansion of building B. Expansion of production floor, offices and new cafeteria, 2000kVA transformer.
2024 Boston Scientific La Lima , Expansion of production floor.
2024 Boston Scientific La Lima , Concord New building, installed load of 3 transformers of 3000 kVA each. Inspection starting
PROFESSIONAL TRAINING
National Learning Institute - INA.
Technological Institute of Costa Rica
College of Electrical, Mechanical and Industrial Engineers NFPA 72
College of Electrical, Mechanical and Industrial Engineers
College of Electrical, Mechanical and Industrial Engineers
College of Electrical, Mechanical and Industrial Engineers
College of Electrical, Mechanical and Industrial Engineers
College of Electrical, Mechanical and Industrial Engineers
College of Electrical, Mechanical and Industrial Engineers