Professional Summary
Overview
Work History
Education
Skills
Additional Information
Timeline

Daniel Sanchez

Tier 1 Solutions
Fontana,United States
7
years of professional experience

Hands-on technician with experience in electrical infrastructure, power plant construction, CNC manufacturing, and community leadership. Skilled in installing and assembling electrical equipment, power distribution systems, cable routing, CNC machine operation, fixture setup, machine calibration, blueprint interpretation, and quality control. Additional experience as a lay missionary providing Bible studies, leading retreats, delivering talks, and conducting community outreach. Strong problem-solving, communication, leadership, teamwork, and attention-to-detail skills, with a commitment to safety and completing work accurately and efficiently.

Work History

Electrical Apprentice

7 Months
Tier 1 Solutions | 02.2026 - Current
  • Installed electrical systems and components according to blueprints and codes.
  • Assisted in troubleshooting electrical issues, ensuring compliance with safety standards.
  • Collaborated with senior electricians on complex installations and repairs.

Routed, organized, and secured large electrical cables and wiring.
Identified and helped resolve installation and equipment issues.Followed workplace safety procedures and maintained an organized work area.

CNC Machine Operator

4 Years 9 Months
Cal Tech Precision | 07.2019 - 04.2024
  • Monitored machines during operation to make adjustments when necessary and produce quality parts.
  • Properly loaded and unloaded materials in and out of machines.
  • Performed accurate Type tool changes and offsets.
  • Input instructions for machine operations based on specifics of work orders.
  • Detected malfunctions and control errors by monitoring machine operation and checking completed pieces.
  • Assisted other machinists with set-up and troubleshooting of CNC machines.
  • Adhered to high level of safety by following company rules and regulations to prevent injuries.
  • Kept accurate operating records by documenting machine usage, production numbers and any issues that arose.
  • Assessed equipment after each production run and performed preventive maintenance to keep machines running smoothly.
  • Adjusted machine settings to achieve desired results and meet customer specifications.
  • Inspected finished parts by checking for defects to meet quality standards.
  • Learned and followed safety procedures to keep machines operated safely and prevent accidents.
  • Prevented machine breakdown by maintaining proper lubrication and cooling during operation.
  • Electrical equipment installation
  • Power distribution systems
  • Power plant construction and assembly
  • Cable installation and routing
  • Equipment rack and cabinet installation
  • Reading technical drawings and diagrams
  • Using hand and power tools
  • Troubleshooting and problem-solving
  • Quality control and inspections
  • Following safety procedures
  • Teamwork and communication
  • Attention to detail
  • Preparing and giving presentations
  • Leadership
  • Organization and planning
  • Teamwork
  • Time management
  • Conflict resolution
  • Building relationships

Education

Henry J Kaiser High School | 11155 Almond Ave Fontana | 05.2019

Skills

Verbal and Written Communication
Maintenance Processes
Materials Loading
Quality Control
Hand and Power Tools
Safety Processes
Material Loading and Unloading
Issue Reporting
Work Area Oversight
Executing Numerical Control Programs
Machine and Tool Maintenance
Production Efficiency
Monitoring Gauges
Precision Measuring Instruments
Electrical power systems installation
Power plant construction and assembly
Power distribution equipment
Electrical equipment installation
Cable routing and organization
Equipment rack and cabinet assembly
Technical drawing and diagram interpretation
Hand and power tool operation
Equipment troubleshooting
Quality control and inspections
Safety procedures and compliance
Teamwork and communication
Problem-solving
Attention to detail
Project completion and time management
Preparing and giving presentations
Leadership Organization and planning
Teamwork
Time management
Conflict resolution
Building relationships

Additional Information

The one year and eight months gap is from my Lay Mission experience. I did eight months of formation (April 2024- December 2024) and a year of mission work in the San Juan island Washington state (January 2025-January 2026)

Timeline

Electrical Apprentice

Tier 1 Solutions
02.2026 - CurrentRead More

CNC Machine Operator

Cal Tech Precision
07.2019 - 04.2024Read More

Henry J Kaiser High School

Read More
Daniel Sanchez