Committed job seeker with a history of meeting company needs with consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.
Overview
23
23
years of professional experience
Work History
Sr. Electrical Quality Specialist
CECFG
Irving, Texas
09.2023 - Current
Developed quality assurance protocols to ensure compliance with industry standards.
Conducted regular audits of processes and systems to identify improvement areas.
Collaborated with cross-functional teams to address quality-related concerns effectively.
Trained staff on quality control measures and best practices for operational efficiency.
Reviewed product specifications and documentation for accuracy and completeness.
Implemented corrective actions to resolve non-conformance issues promptly.
Conducted internal audits to ensure compliance with quality standards and procedures.
Provided technical support to other departments on quality-related matters.
Facilitated workshops to promote a culture of continuous improvement within the organization.
Analyzed data trends to support decision-making in quality initiatives.
Documented daily inspection results and reported any discrepancies or problems immediately.
Created inspection checklists and trained staff members in proper use of them.
Maintained records of test results, QC and QA activities, and related documents.
Reviewed drawings, blueprints, and product specifications prior to production runs.
Implemented new methods for measuring process effectiveness and efficiency within the organization.
Electrician/QA Inspector
Rosendin Electric
Sherman, TX
02.2015 - 09.2023
Performed electrical installations, maintenance and repairs of electrical systems, wiring, fixtures and components.
Tested continuity of circuits with testing devices such as ohmmeters, voltmeters and ammeters.
Installed conduit for new wiring systems in commercial buildings.
Inspected electrical equipment and systems to identify hazards, defects and the need for adjustment or repair.
Connected wires to circuit breakers, transformers or other components.
Repaired or replaced worn or defective parts using hand tools and power tools.
Maintained current electrician's license or identification card to meet governmental regulations.
Constructed control panels from blueprints or schematic drawings.
Ensured that all work was completed in accordance with applicable codes.
Identified problems with electrical systems by observing operation, listening for problems and using test equipment such as multi-meters.
Worked on high voltage switchgear projects involving transformer hookups and terminations up to 15kv level.
Installed conduit, wire and motor controls.
Connected wires to circuit breakers and transformers.
Traced and diagnosed electrical malfunctions using hand tools and test equipment.
Installed cables, conductors and wire trays and completed necessary hook-ups for primary power lines.
Provided technical support on various types of motor control circuits including VFDs.
Installed grounding system per NEC code requirements.
Worked extensively on three-phase, 277/480 volt power distribution systems.
Interpreted blueprints and technical drawings to correctly assemble panels and control boxes.
Mechanical Technician
Tyson Foods
Sherman, TX
05.2006 - 09.2015
Performed preventative maintenance on mechanical equipment and machinery.
Assisted in the installation of new machines and equipment.
Tested, diagnosed, and repaired malfunctioning components.
Replaced worn or defective parts with new ones.
Inspected completed work for accuracy and quality assurance.
Monitored performance parameters to ensure optimal operation of machinery.
Conducted routine lubrication of moving parts according to safety protocols.
Adjusted machine settings as needed to optimize production processes.
Maintained accurate records of repairs and preventive maintenance activities.
Developed detailed reports on operational issues and recommended corrective actions.
Calibrated instruments used in testing operations to verify performance specifications.
Researched technical manuals for troubleshooting guidance when necessary.
Organized spare parts inventory to facilitate quick access during repairs or replacements.
Operated computer-controlled automated systems for manufacturing processes.
Followed safety regulations while working with hazardous materials and chemicals.
Attended training sessions for updates on product changes or modifications.
Inspected and tested machinery, equipment and component parts to identify defects, diagnose malfunctions and facilitate repairs.
Diagnosed mechanical problems and determined solutions to correct concerns.
Asphalt Paving Foreman
JRJ Paving
Dallas, TX
03.2005 - 09.2005
Planned, organized and supervised the paving crew in order to complete projects on time and within budget.
Conducted daily safety meetings with the crew to ensure that all operations were conducted safely and efficiently.
Performed layout of asphalt paving jobs using survey stakes, grade rods, levels, string lines and transits.
Coordinated trucking needs for each project based on job specifications.
Ensured that proper materials were used in accordance with project plans and specifications.
Monitored progress of work crews to ensure compliance with job requirements.
Provided guidance to workers regarding proper installation techniques for asphalt paving applications.
Directed personnel in the safe operation of construction equipment such as backhoes, loaders, pavers, rollers and other power tools.
Maintained accurate records of production rates for labor and material costs associated with each job site.
Ordered additional materials when needed in order to keep projects running smoothly.
Resolved disputes between employees or contractors regarding quality or quantity of work performed.
Confirmed that final product met customer expectations by conducting a thorough inspection at completion of job.
Troubleshot problems related to asphalt paving operations including drainage issues, erosion control measures and surface finish concerns.
Project Superintendent
Alltex paving
Dallas, TX
05.2003 - 03.2005
Managed subcontractors, ensuring that all work was completed according to project specifications and standards.
Supervised day-to-day operations of construction sites, including scheduling of workers, materials delivery, and equipment usage.
Coordinated with other departments to ensure timely completion of projects.
Inspected worksites on a regular basis to ensure safety regulations were followed and quality control standards were met.
Maintained records of construction progress and reported any discrepancies or delays immediately to the Project Manager.
Held weekly meetings with subcontractors to review job performance, discuss potential problems, and provide guidance for improvement.
Developed detailed project plans outlining scope of work, budget estimates, timelines and milestones for each phase of the project.
Ensured compliance with local building codes as well as company policies throughout the duration of the project.
Assisted in resolving conflicts between subcontractors regarding cost overruns or missed deadlines.
Monitored labor hours against estimated costs for each task in order to stay within budget limits.
Reviewed blueprints and drawings prior to commencement of work to ensure accuracy in material ordering and installation process.
Education
Associate of Applied Science - Industrial Maintenance Technology
Grayson County College
Denison, TX
03.2014
Skills
Quality Control
Production Experience
Issue Escalation
Reporting and Analysis
Blueprint Interpretation
Visual Inspections
Non-Conformance Reporting
Quality Processes
Equipment Calibration
Inspection Procedures
Inspections and Reviews
Quality Control Planning
Inspection Documentation
Forms Management
Quality assurance
Data analysis
Process improvement
Quality system implementation
Establishing and enforcing policy
Documentation and reporting
Functional testing
Testing efficiency
Testing processes
Team leadership
Documentation control
Calibration management
Quality management systems
Continuous improvement
Team collaboration
Effective communication
Technical documentation
Military
United States Marine Corps
Affiliations
Member, Alumni Association
Timeline
Sr. Electrical Quality Specialist
CECFG
09.2023 - Current
Electrician/QA Inspector
Rosendin Electric
02.2015 - 09.2023
Mechanical Technician
Tyson Foods
05.2006 - 09.2015
Asphalt Paving Foreman
JRJ Paving
03.2005 - 09.2005
Project Superintendent
Alltex paving
05.2003 - 03.2005
Associate of Applied Science - Industrial Maintenance Technology