Mechanical Lay Technician/Equipment Operator.
I am a highly confident and outgoing individual with strong multi-tasking and organizational skills.
I strive to excel in all areas of both my work and social life. And have proven to consistently work to high standards.
My love for new challenges is what has gifted me my ability to adapt to anything that has come before me in my past. I take great self-pride from my ability to learn new skills quickly, also helping others along the way.
WINDA ID: DS044829GB
OFFSHORE VANTAGE NUMBER: 2417039
Client - Prysmian
Dominian Offshore Windfarm - Cable recovery, repair, joint and lay.
Nordseacluster - 48 x Infield Cable load and lay
Client - NTG/Prysmian
56km export cable load-out from Prysmian cable factory to the Emma Oldendoorf.
Vessel demobilised in preparation for its sail to Virginia, USA.
Client - One Dyas
Cable loadout - TKF Eemshaven, Inter platform lay - Riffgat to One Dyas.
Offload and demobilisation Ijmuiden.
Client - RWA
7km export cable load out - Belfast.
8 point anchor spread, Cable lay/Repair - Gwynn d Mor Offshore Wind Farm, North Wales.
Client - Woodside
Offloaded 2 x 14 flowlines from the Jumbo Fairmaster to the Subsea7 Oceanic
Client - NTG
22km power cable loadout - vessel to barge.
Client - Woodside (SS7 Scarborough Project)
2 x 14" Flowlines spooled from NOV (National Oilwell Vargo) to the Jumbo Fairmaster.
Client - RWE (Thor Project)
2 x 35km export cables loaded from Hellenic cable factory to the CLV Connector.
Client - Woodside (SS7 Scarborough Project)
Offloaded 4 x 14" risers from the Jumbo Big Lift HLV to SS7 Seven Oceanic CSV.
Client - BP (Subsea7 Cypre Project)
Offloaded 4 x 14" flowlines to the SS7 Seven Seas CSV.
Client - Woodside (Subsea7 Scarborough Project)
Four of 6 x 14" risers were transpooled from the NOV production facility onto the Jumbo Fairmaster HLV.
I took control of the tower tensioner and the carousel onboard. Also Supervised the demobilisation in preparation for the vessel to sail to Australia.
Client -BP (Subsea7 Cypre Project)
Transpooled 6 x 14" flowlines from SPMT driven baskets on the quayside into two carousels onboard the Big Lift Happy Star transport Vessel.
Two loading towers with 15te tensioners on board along with a 20te deck tensioner were used in this operation.
Client - Demar
2 x 4km infield cable - seal and wet store.
Client - Tennet
2 x 30km 270mm export cable load-outs and lay.
Operation of 15t deck tensioner, 3t top tensioner, 4800t carousel, A-frame, tele leg and multiple winches.
Scope included 2 x joints and 4 x crossovers.
Client - Van Oord (Sofia Offshore Windfarm)
Multiple static stank load-out with use of 2 x BCE's and one Dice tensioner 15te.
Client - Baker Hughes
Load-out to Chinese CLV.
Client - NTG
Mobilisation of the Mv. Molengracht, load-out 4 x 138mm 20km single core power cables. BCE under crane suspension was used for this loadout.
Client - Subsea7
Spooling of three 4km flexi pipes. Individual SPMT operated static tanks and one loading tower based 15te Blue Offshore tensioner.
Client - Baker Hughes
300m test cable loaded and full demobilisation of the SAL Heavy Lift Paula.
Client - Baker Hughes
Full Mobilisation of the SAL Heavy Lift PAULA, 3km Umbilical cable loaded into the DOC carousel onboard. 3 pair, 10t tensioner and carousel.
Client - DOC
Offloaded 3km of export cable from the Nexans Aurora to shoreside at Sunderland Port.
10t DOC tensioner, BCE and double partitioned carousel on SPMT's were used in the process.
Cable Loadout from the Boskalis Transshelf to shoreside (Providence Port)
Operation and maintenance of three DOC 9000t carousels in combination with a 50t tensioner and A&R winch.
Client - Harbour Energy
Mechanical Shutdown.
Topaz Installer - CFXD & Zhong Neng Windfarm Projects.
Rotation -Cable load outs - Taichung Port, Cable lay - Taichung Straights.
Client - EnQuest
GE Frame 5001 heavy frame industrial turbine. Hot Gas Pathway Inspection (HGPI) and Inlet Guide Vane (IGV) replacement.
Client - Oil and Pipelines Agency
Confined space joint tightening and the skimming of two manway door faces.
Client - Prysmian
Load out - 2x 26km spools of export cable Oldendorff to the Ullisse.
Twin Blue Offshore Carousels and Tensioners.
Various shoreside Load-outs as an when required/available.
Carousel/Tensioner Operation/maintenance and servicing.
Client - Edinburgh Airport
Maintenance of Vanderlande conveyor systems.
Installation and commissioning of a new three tier conveyor system supplied by Robson Handling Technology.
Client - Essar Oil
Stanlow 2022 Cracking Facility Shutdown. Breaking containment, flange inspections as per ASME PCC1 criteria, reinstatement of Valves, spec blinds, and other mechanical components
Client - DOW Chemical
DOW Corning Silicone's 2022 TAR. Tensioning of various heat exchangers.
Client - EnQuest
Magnus Oil Field Shutdown 2022. Nitrogen purging, leak testing and PSV replacement.
Client - Apache
Beryl Field Shutdown Summer 2022. Sub-sea ballast system and surrounding area maintenance.
Client TATA Steel
Sinter Plant Mechanical Shutdown 2022
Client - ExxonMobil
ExxonMobil IE22 Turnaround. Ten weeks of scheduled maintenance on the four coke valves.
Client - Essar Oil
Annual mechanical shutdown consisting of isolations/de-isolations, spading, fin fan plug service/replacement, heat exchanger installation and the tightening of flanged joints using both torque and tensioning equipment.
Client - TATA Steel
Mechanical Shutdown in the Hot Works area of the plant.
Client - Essar Oil
Mechanical maintenance shutdown.
§ Dissembling and reassembling of heat exchangers and level bodies
§ Pipefitting
§ Mechanical fault diagnosis
§ Conveyor Belt Maintenance
§ Transmission maintenance
§ Use of Tensioning Equipment
§ Ability to evaluate and clean flange faces
§ Gasket Identification and Replacement
§ Mechanical fitting
§ Gas Turbine Maintenance
§ Reading of isometric drawings
§ Valve fitting and alignment
§ Torque and tensioning of bolts to specific figures using both hand and hydraulic tooling
§ Removal and assembly of flanges and valves
§ Operation and Maintenance of Carousel and Cable Tensioner Equipment
§ Vessel/Shoreside Mob/De-Mob
§ Operation of Bow Cable Engine (BCE)
§ Experience working with Export, Umbilical, Inter Array cable and Flex Pipe
§ Involvement and Supervision of Heavy Lifting operations
Cable Lay/Equipment Operator - Blue Offshore - Peter De Bie - +31 642723375
Bolting Technician - ICR - Lance Lightfoot - 07735572966
Mechanical Fitter MII Engineering - Leighton Jeffries - 07824640984
Yellow Fever Vaccination
VCA VOL - Supervisor Holland/Belgium and IS-006 Rigging of Critical Loads Holland/Belgium
GWO Working at Height, Fire Awareness, First Aid, Sea Survival (AIS Survivex)
Combined BOSIET/MIST/Norwegian Escape Chute, Offshore Medical/Chester-Step (AIS)
Full UK Driving Licence (Clean)
B1 (USA)/Chinese Visa
UK Passport/British and Luxemburg Seamen's Discharge Book