Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Dante Loperz

Placentia,CA

Summary

Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

7
7
years of professional experience

Work History

Construction Worker

Troys Paintings
Santa Ana, CA
09.2017 - 06.2024
  • Lifted heavy objects into place with cranes or hoists.
  • Measured distances accurately using tape measures or laser measuring devices.
  • Operated a variety of tools to excavate, move and grade earth for foundations, trenches and roads.
  • Followed blueprints or engineering plans to determine the best methods of assembling structures.
  • Provided assistance to supervisors when needed completing additional duties as assigned.
  • Utilized power tools such as saws, drills and sanders when necessary on projects.
  • Assisted in the preparation of construction sites by clearing debris, leveling ground and erecting scaffolding.
  • Coordinated with other workers onsite to ensure efficient completion of tasks.
  • Cleaned job sites daily removing debris, dirt and hazardous materials safely.
  • Monitored progress of construction activities making sure deadlines were met.
  • Inspected work areas for safety issues before beginning any task.
  • Transported materials from one site location to another using trucks or trailers.
  • Performed various carpentry tasks such as constructing walls, installing doors, windows and siding.
  • Maintained clean, safe working environment by removing debris from job site prior to shift completion.
  • Collected and removed debris from work sites to maintain team productivity and minimize safety hazards.
  • Addressed and resolved on-site problems to keep teams on-task and avoid development of larger concerns.
  • Met company and OSHA safety guidelines for work site operations to minimize worker risk.
  • Logged inventory to track supply counts, organize equipment, and gather important materials.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Inspected sites before and after construction projects.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Loaded or unloaded building materials to distribute machinery or tools.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Demonstrated best safety practices working at heights and lifting various objects.

Education

Some College (No Degree) - Natural Sciences

Fullerton College
Fullerton, CA

Some College (No Degree) - Humanities

Santiago Canyon College
Orange, CA

Skills

  • Organization and Time Management
  • Active Listening
  • Planning
  • Decision-Making
  • Multitasking
  • Conflict Resolution
  • Critical Thinking
  • Flexible and Adaptable
  • Teamwork and Collaboration
  • Task Prioritization
  • Friendly, Positive Attitude

Languages

Spanish
Professional
English
Professional

Timeline

Construction Worker

Troys Paintings
09.2017 - 06.2024

Some College (No Degree) - Natural Sciences

Fullerton College

Some College (No Degree) - Humanities

Santiago Canyon College
Dante Loperz