Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Dante Neal

Racine,USA

Summary

To obtain a position with a progressive organization that will facilitate continued growth and development. Dedicated Industry professional with history of meeting company goals utilizing consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand. Willing to relocate: Anywhere

Overview

18
18
years of professional experience
1
1
Certification

Work History

Structural Welder Foreman

Trade Team Usa
07.2025 - Current

Directed 11-member welding team constructing US Naval warship.

Tank Structural Welder

Bechtel Oil & Gas
10.2024 - 06.2025
  • Fabricated and assembled structural components following engineering specifications and project blueprints.
  • Conducted inspections of welds to ensure compliance with quality and safety standards.
  • Operated welding equipment including MIG, TIG, and stick welding machines for various materials.
  • Collaborated with engineering teams to resolve design discrepancies and optimize processes.
  • Demonstrated adaptability by successfully completing challenging projects that required diverse welding methods and materials expertise.
  • Consistently met production targets without sacrificing craftsmanship or safety standards by balancing speed with precision in every task.
  • Completed complex welding assignments under tight deadlines without compromising safety or workmanship standards.

Welding Foreman

Kilgore Industrial
07.2023 - 10.2024
  • Supervised daily welding operations, ensuring adherence to safety and quality standards.
  • Coordinated workflow among welders, optimizing productivity and minimizing downtime.
  • Trained and mentored junior welders on techniques and best practices for efficiency.
  • Implemented process improvements, enhancing overall project delivery timelines.
  • Collaborated with project managers to align welding tasks with production schedules.
  • Assisted in recruiting skilled welders, contributing to the growth and success of the company''s workforce.
  • Enhanced welding quality by implementing rigorous inspection processes and providing feedback to team members.

Construction Foreman

HENSLEY INDUSTRIES
04.2023 - 07.2023
  • Using the CMMS system hand out work orders to the construction techs. Supervise and oversee all work performed on wheelbrator and shakeout systems. Make sure welders are apply proper weld process according to material and thickness. Hand out PM's to all techs throughout the day. Inspect work area for fire hazards and write all hot work permits to employees as well as any contractor the uses welding methods.Fill out all JSA's and or JHA's.

Stainless Tank Welder

Stainless Tank & Equipment
05.2022 - 04.2023
  • Weld Stainless Barrel Tanks Fabricated from raw stainless material using .045 316L wire and tig process using 308 3/32 and 1/8 wire. Was promoted to weld trainer for all new hires on the main production lines.

Fitter/ Tank Welder

Tradesman International-Tank
06.2021 - 05.2022
  • Use Blueprint and Drawings to Fabricate and Build flyash,Solvent,scrubing tank systems out carbon and or stainless steel using .045-1/16 carbon and stainless 308,flux core wire.all tanks are built on 360 turn table and rolling systems.

6G Pipe Welder

Trade Management Group
04.2020 - 05.2021
  • Weld Chill Water piping Sch 40 to Sch 80 ranging from 2in to 120in diameter using 6010 root and hot pass 7018 fill and cap, Also weld slip flanges and O lets.

Structural Welder

RCC, Bechtel Plant Vogtle Power Plant
07.2019 - 03.2020
  • Weld cable tray and conduit structural supports inside the API1000 Nuclear Reactor Using 7018 3/32 and 1/8 welding rod also fabricated missing supports thru welding engineers and Q.C Drawings and specs.
  • To all hold points as instructed and document any work done in the reactor.
  • Follow all rules and instructions of lock out tag out when systems were under start up and testing.

6G Pipe Welder

Trade Masters Industrial
11.2018 - 07.2019
  • Weld Chill Water piping Sch 40 to Sch 80 ranging from 2in to 120in diameter using 6010 root and hot pass 7018 fill and cap, Also weld slip flanges and O lets.

Weld Instructor

Lincoln Technical Institute
06.2018 - 01.2019
  • Teach students the fundamentals of arc welding using SMAW,GTAW,GMAW,FCAW,MCAW Instruction on set up oxyfuel metal cutting equipment also plasma arc cutting equipment.
  • Track torch set up basic Blueprint reading and iso metric drawing.

Structural Welder/Weld Foreman

Bechtel Oil & Gas
05.2018 - 05.2018
  • Weld piping support for electrical and Piping Dept.
  • Guides, supports, trapeze supports uni-struts, carbon steel plates.
  • Promoted To weld foreman position, assigned structural and pipe welders To various areas throughout the LNG refinery.

Structural Welder

CB&I
03.2016 - 10.2016
  • Weld 25-ton monorail to structure.
  • Piping supports using 7018 rod.

Structural Welder

Bechtel Construction
04.2015 - 10.2015
  • Weld iron piping supports.

Specialty Structural Welder

Bechtel Construction
02.2014 - 03.2015
  • Weld pipe supports using 7018 stick rod.

Specialty Structural Welder

Bechtel Construction
05.2013 - 02.2014
  • Weld all structural components in the piping adept.
  • Using carbon 7018 stick rod and .045 flux core processes.

Boilermaker Pipe Welder

Holman Boiler Works
03.2013 - 05.2013
  • Install and repair superheat and reheat boiler tubes on cleaver brooks boiler systems.
  • Lock out tag out system was imminent to do all work done was on live boiler systems.
  • Repairs were mad when allotted time was given.
  • All locks had to be removed only by the signee on the LOTO documents.

Boilermaker/Structural Welder

Zachry Construction
10.2012 - 11.2012
  • Dis-assembled air pre-heaters, repaired cracks in the internal air pre-heater housings by weld and fabrication then re-installed baskets.
  • Weld using 7018 1/8.3/32 6018 3/32 6010 3/32 C309 stainless stick rods, .045 flux cored.
  • All work done on live system so LOTO procedure was implemented.

Boilermaker Structural Welder

Road Dog Industrial outage
08.2012 - 10.2012
  • Dis-assembled furnace burners, rebuilt and repaired by grinding and welding pits on burner housings then re-installed burners.
  • Weld using 7018 1/8.3/32 6010 3/32 C309 stainless stick rods, .045 flux core.
  • Power Plant shut down was a live system so LOTO protocol was in effect.

Boilermaker Journeyman Plate Welder

Bechtel Construction
09.2010 - 12.2010
  • Pre-fab water walls assembled.
  • Weld using stick process 7018 1/8.
  • Assemble coal hoppers seal weld using .045 flux core process.

Boilermaker Tube/Structural Welding Foreman

Becon/Bechtel Construction
11.2008 - 10.2009
  • Supervise tube and structural welders.
  • Read blueprints.
  • Set up and organize work for tube and structural welders.
  • Assigned welding lines in the furnace and backpass of the boiler.
  • Prefab structural material; screw dogs, lugs, wedges, etc.

Boilermaker Journeyman Combo Welder

Bechtel Construction
06.2007 - 05.2008
  • Stick and flux core welding of mild steel, heavy plate and stainless steel.
  • Weld loose, sling, division wall, front cage wall tubes, repair tubes by cutting and installing Dutchman's to build and repair boiler.
  • Fillet, overhead and horizontal welding.
  • Thermal cutting and grinding.

Education

Welding Maint. - Welding

Gateway Technical College
Racine

GED - undefined

St. Paul Technical College
Kenosha, WI
06.1988

Skills

  • Plasma cutting
  • Forklift
  • Welding
  • Fabrication
  • Blueprint reading
  • Organizational skills
  • Press brake machine
  • Assembly
  • Construction
  • Construction management
  • Flux welding
  • Boiler
  • MIG welding
  • Confined space welding
  • Weld defects identification
  • Pipe welding
  • Flux core welding
  • Shaping and cutting
  • TIG experience
  • Welding quality control
  • Stainless steel welding
  • Gas metal arc welding
  • Welding documentation
  • Welding positions
  • Quality controls
  • Oxy-fuel cutting
  • Cutting techniques
  • Structural fabrication
  • Aluminum welding
  • Shielded metal arc welding
  • Welding standards
  • Cast iron welding
  • Beam welding
  • Joint preparation
  • Welder qualification test
  • Welding consumables
  • Quality assurance
  • Preheating procedures

Certification

Nccer Safety Technician #14266953

Timeline

Structural Welder Foreman

Trade Team Usa
07.2025 - Current

Tank Structural Welder

Bechtel Oil & Gas
10.2024 - 06.2025

Welding Foreman

Kilgore Industrial
07.2023 - 10.2024

Construction Foreman

HENSLEY INDUSTRIES
04.2023 - 07.2023

Stainless Tank Welder

Stainless Tank & Equipment
05.2022 - 04.2023

Fitter/ Tank Welder

Tradesman International-Tank
06.2021 - 05.2022

6G Pipe Welder

Trade Management Group
04.2020 - 05.2021

Structural Welder

RCC, Bechtel Plant Vogtle Power Plant
07.2019 - 03.2020

6G Pipe Welder

Trade Masters Industrial
11.2018 - 07.2019

Weld Instructor

Lincoln Technical Institute
06.2018 - 01.2019

Structural Welder/Weld Foreman

Bechtel Oil & Gas
05.2018 - 05.2018

Structural Welder

CB&I
03.2016 - 10.2016

Structural Welder

Bechtel Construction
04.2015 - 10.2015

Specialty Structural Welder

Bechtel Construction
02.2014 - 03.2015

Specialty Structural Welder

Bechtel Construction
05.2013 - 02.2014

Boilermaker Pipe Welder

Holman Boiler Works
03.2013 - 05.2013

Boilermaker/Structural Welder

Zachry Construction
10.2012 - 11.2012

Boilermaker Structural Welder

Road Dog Industrial outage
08.2012 - 10.2012

Boilermaker Journeyman Plate Welder

Bechtel Construction
09.2010 - 12.2010

Boilermaker Tube/Structural Welding Foreman

Becon/Bechtel Construction
11.2008 - 10.2009

Boilermaker Journeyman Combo Welder

Bechtel Construction
06.2007 - 05.2008

GED - undefined

St. Paul Technical College

Welding Maint. - Welding

Gateway Technical College