I have more than 20 years of experience in construction quality management, QA/QC inspection and testing that spans a variety of project types including Caltrans, Metro, design builds, transportation, education, renewable energy, residential and commercial development. I have in-depth knowledge of codes, specifications and the standard tools and equipment utilized in construction, sampling and testing of construction materials. I have knowledge of mathematics and the methods used for computation of construction items. I have progressively increased my level of responsibilities throughout my career. The past 5 projects have extensive experience working as lead QA/QC inspector.
Rosecrans/Marquardt Grade Separation, La Mirada CA
Responsibilities included ensuring that the inspection and testing were completed in accordance with job specifications, Caltrans specifications, Metro specifications and testing frequencies. Overseeing the day to day construction quality, daily reports and testing documentation. Professional working relationship with Metro, PreScience, Flatiron staff. Specific inspection tasks included bridge, CIDH, abutments, bents, retaining walls, footings, MSE walls, utilities, civil, concrete placement, grout placement, strand stressing, reinforcement and manage technicians.
I-10 Corridor Project, Ontario CA
Responsibilities included ensuring that the inspection and testing were completed in accordance with Caltrans specifications, testing frequencies, Overseeing the day to day construction quality and providing testing documentation, daily reports. Professional working relationships with Caltrans, and LSPJV staff. Specific inspection tasks included bridges, bridge abutments, retaining walls, ground anchor walls, soil nail walls, barrier walls, CIDH, concrete placement, shotcrete placement, and grout placement.
I-405 Improvement Project, Orange County CA
Responsibilities included ensuring that the inspection and testing for the project were completed in accordance with Caltrans specifications, testing frequencies, overseeing the day to day construction quality and providing testing documentation, daily reports. Professional working relationships with Caltrans, OC405 staff, OCTD. Specific inspection tasks included bridge decks, bridge abutments, retaining walls, footings, CIDH piles, MSE walls, soil nail walls, barrier rails, approach slabs, barrier slabs, roadway, drainage, reinforcement, concrete placement, shotcrete placement, grout placement.
Kiewit-AES Huntington Beach Energy Project, Huntington Beach CA
Responsibilities included ensuring that the inspections and testing for the project were completed in accordance with CBC, ASTM and Kiewit project specifications, testing frequencies, overseeing day to day construction quality and daily reports. Professional working relationships with Kiewit, AES, NV5 and GPI. Specific inspection tasks included ACIP, pile caps, utilities, mass grading, concrete placement, grout placement, reinforcement and managing technicians.
SFI Gerald Desmond Bridge Replacement Project, Long Beach CA
Responsibilities included ensuring that the inspection and testing for the project were completed in accordance with Caltrans and POLB specifications, testing frequencies, overseeing the day to day construction quality and providing testing documentation, daily reports. Professional working relationships with Caltrans, POLB, SFI staff. Specific inspection tasks included roadway, hollow/solid columns, CIDH, MSE walls, abutments, approach slabs, retaining walls, barrier slabs, barrier walls, pile caps, MBGR, mass grading, roadway grading, storm drains, utilities, concrete placement, reinforcement, asphalt paving, managing technicians.
Devore I-15/I-215 Interchange Project, Devore CA
Responsibilities included ensuring that the inspection and testing for the project were completed in accordance with Caltrans specifications, testing frequencies, overseeing the day to day construction quality and providing testing documentation, daily reports. Professional working relationships with Caltrans, Atkinson staff. Specific inspection tasks included roadway, solid columns, CIDH, MSE walls, bridge abutments, tieback/soil nail walls, approach slabs, retaining walls, barrier slabs, barrier walls, MBGR, mass grading, roadway grading, storm drains, utilities, street improvements, reinforcement, concrete placement, shotcrete placement, grout placement, asphalt paving, managing technicians.
I-405 Sepulveda Pass widening Project, Los Angeles CA
Responsibilities included ensuring that the inspection and testing for the project were completed in accordance with Caltrans and LA City specifications, testing frequencies, overseeing the day to day construction quality and providing testing documentation, daily reports. Professional working relationships with Caltrans, LA City, Kiewit staff. Specific inspection tasks included roadway, MSE walls, CIDH, solid columns, bridge abutments, approach slabs, barrier slabs, barrier walls, retaining walls, sound walls, mass grading, roadway grading, tieback/soil nail walls, MBGR, storm drains, utilities, reinforcement, concrete placement, shotcrete placement, grout placement, street improvements, asphalt paving, managing technicians.
LADWP, Kiewit Pine Tree Wind Turbine Project, Mojave CA
Responsibilities included ensuring that the inspection and testing were completed in accordance with LADWP specifications, testing frequencies, overseeing the day to day construction quality and providing testing documentation, daily reports. Professional working relationships with LADWP, Kiewit staff. Specific inspection tasks included concrete foundations, rock anchors, CIDH, bridge deck, mass grading, roadway grading, storm drains, utilities, reinforcement, concrete placement, grout placement, concrete and grout sampling, soils testing.
K. Hovnanian Forecast Homes 4 Seasons, Moreno Valley CA
Responsibilities included ensuring that the inspection and testing for the project were completed in accordance with specifications, testing frequencies, overseeing the day to day construction quality and providing testing documentation, daily reports. Specific inspection tasks included mass grading, street improvements, MSE walls, crib walls, storm drains, sewer lines, retaining walls, reinforcement, concrete placement, asphalt paving, concrete sampling, soils testing.
Colonies Crossroads Housing and Commercial Bldgs, Upland CA
Responsibilities included ensuring that the inspection and testing for the project were completed in accordance with specifications, testing frequencies, overseeing the day to day construction quality and providing testing documentation, daily reports. Specific inspection tasks included mass grading, street improvements, storm drains, sewer lines, MSE walls, retaining walls, reinforcement, concrete placement, asphalt paving, concrete sampling, soils testing.
Kiewit, MTA Pasadena Metro Gold Line, Pasadena CA
Responsibilities included ensuring that the inspection and testing for the project were completed in accordance with specifications, testing frequencies, overseeing the day to day construction quality and providing testing documentation, daily reports. Specific inspection tasks included mass grading, storm drains, street improvements, retaining walls, CIP walls, CIDH, reinforcement, concrete placement, concrete sampling, soils testing.