Clear-thinking Supervisor with experience in pipe plan development and design. An excellent construction liaison with demonstrated skills in managing a crew of bilingual employees. Offering expertise in pipe fabrication and a commitment to delivering stellar service.
Overview
12
12
years of professional experience
Work History
Pipe General Foreman
Optimized Process Designs
Vidor, TX
11.2023 - Current
Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
Recruited and hired workers, in addition to supervising and monitoring daily performance.
Defined and monitored personnel and project schedules to ensure on-time project completion.
Pipefitter Foreman
PSC Primoris
Vidalia, LA
06.2023 - 10.2023
Enforced safety and client-specific policies procedures on job sites to protect workers and general public.
Set new equipment into place like conveyors,furnace.
Installed pipe and high heat resistant hoses the equipment.
Pipefitter Foreman
Zachry Industrial
Sabine Pass , TX
12.2022 - 06.2023
Kept production team moving forward for progress in daily site operations.
Established and enforced procedures and work standards, promoting team performance and safety.
Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
Pipefitter Foreman
PSC Primoris
Geismar, LA
11.2022 - 12.2022
Complied with company policies, objectives and communication goals.
Coordinated employee schedules according to shift changes and availability.
Pipefitter General Foreman
S&D Engineering and Construction
Baytown, TX
10.2022 - 11.2022
Planned and managed resources to consistently meet production, quality and cost goals.
Responded to customer questions regarding products, prices and availability.
Reviewed completed work to verify consistency, quality and conformance.
Pipefitter Foreman
Performance Contracting
Port Arthur, TX
06.2022 - Current
Documented orders, daily activities, weekly schedules and team performance.
Completed all repairs and maintenance work to company standards.
Collaborated with staff engineers to optimize product testing processes.
Applied changes requested by engineers, or inspectors to optimize work.
Resolved product issues with manufacturers to maintain relationships with key producers and deliver quality LNG to customers.
Pipefitter Foreman
S&D Engineering and Construction
Nederland, TX
05.2022 - 05.2022
Supervised a turnaround safely with fresh air for H2s and harmful gasses.
LOTO trained and also performed line breaks after pipeline was drained and flushed with nitrogen air.
Carefully inspected worksites to determine presence of any obstructions, unsafe conditions and crew errors.
Performed hydrostatic pressure testing of boilers and pressure vessels.
Pipefitter General Foreman
Wyatt Field Service, Port Arthur, Tx. Valero
Port Arthur, TX
03.2022 - 05.2022
Maintained strong quality control standards to prevent costly rework.
Completed site reports, materials requisitions, RFIs and log books.
Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining.
Successfully managed team of 16 English- and Spanish-speaking work crews for piping constructions, completing projects two weeks in advance of projection date.
Established work priorities to meet contractual obligations for schedule and installations.
Pipefitter Foreman
The Industrial Company, TIC
Cameron, LA
11.2020 - 02.2022
Measured and marked pipes for cutting and threading.
Prepared and planned worksites to help jobs run smoothly.
Delegated duties to employees based on skillset.
Recorded job supplies, parts, equipment and employee hours.
Worked closely with team members to deliver project requirements, develop solutions and meet deadlines.
Pipefitter Foreman
S&B Engineers and Constructors Ltd.
Nederland, TX
02.2020 - 10.2020
Used work orders, verbal directions and technical documentation to coordinate team plans.
Read and interpreted specifications, diagrams and blueprints for job.
Oversaw 11 apprentices, answered questions and provided feedback on work.
Observed safe work rules, including fall protection and PPE.
Managed employee training for maximum performance and safety.
Pipefitter Foreman
Mcdermott International Inc.
Lake Charles, LA
07.2017 - 01.2020
Studied project specifications to plan the sequence and schedule for pipe installations.
Examined pipelines using a pressure gauge, hydrostatic testing, and other methods.
Used Navisworks to measure elevations and coordinates of drawings.
Modified and cleaned out piping systems with air blows and steam blows to perform preventative maintenance activities.
Filled piping systems with water and air to test for leaks.
Pipefitter
Optimized Process Designs Inc.
Mont Belvieu, TX
05.2016 - 07.2017
Fabricated and positioned screw pipe, socket weld pipe and stainless steel tubing.
Threaded pipes using specified machinery.
Read and interpreted specifications, diagrams and blueprints for the job.
Cut and hammered pipes to meet design specifications for individual system installations.
Heavy Equipment Operator
Halliburton Co
San Antonio, TX
03.2014 - 05.2016
Completed jobs operating excavator and forklift equipment on regular basis with advanced skill.
Created holes and trenches in the ground.
Employed best heavy equipment operation safety practices with minimal complaints or incidents.
Transported materials around construction sites to work locations.
Education
High School Diploma -
Rio Grande City High School
Rio Grande City, TX
Skills
Blueprint analysis
Pipe plan sequencing
Job order prioritization
Exceptional problem solver
Bilingual (English & Spanish)
Project oversight
Strong communication skills
Activities
Volunteer security personnel for community events facilitated a local church.
Volunteer clean-up team member at a children's community center renovation project.