Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

David Cisneros

Brownsville,Texas

Summary

Responsible Construction Superintendent with 10 years of comprehensive experience leading teams of up to 3 contractors and subcontractors. Outstanding blueprint and design interpretation and comprehension abilities with excellent communication, budgeting and project management talents. Extensive knowledge of all construction sub-trades, construction materials and supplies.

Overview

17
17
years of professional experience
1
1
Certification

Work History

Construction Superintendent

Bay Ltd.
08.2013 - Current
  • Established successful procedures for day-to-day operations and long-term planning.
  • Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Worked with specialized teams to accomplish all objectives and achieve goals.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Stepped up during foreman's absence to answer questions and delegate project tasks to employees.
  • Maintained safety onsite and upheld all OSHA regulations by [Action].
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.

General Foreman

REPCON
02.2010 - 04.2012
  • Worked alongside team to accomplish work goals according to schedule.
  • Kept teams properly supplied with materials, tools, plans and supplementary assistance to meet project deadlines.
  • Completed final walk downs at job sites to close out projects.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Directed projects according to schedule and quality demands.
  • Prepared daily time cards and assisted in preparation of estimates and scope of work statements.
  • Delivered project updates to superintendent and detailed issues that could halt work progress.
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.

Pipe Shop Supervisor

Shaw Group
03.2009 - 01.2010
  • Oversaw employee performance, corrected problems, and increased efficiency to maintain productivity targets.
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Monitored workflow to improve employee time management and increase productivity.
  • Created successful work schedules for each team member to maintain deadlines and fully staff shifts.
  • Conducted routine inspections to check quality and compliance with established specifications.

Pipefitter Foreman

Turner Industries
01.2007 - 11.2008
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Supervised team of installers and mechanics to complete work on time and to company standards.
  • Reviewed and studied blueprints to double-check installation and implementation project requirements.

Pipefitter Journeyman

REPCON
09.2006 - 01.2007
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Monitored pipeline pressure and flow rates to facilitate safe and efficient operation.
  • Fabricated piping pieces and components in line with design specifications for each system.

Education

High School Diploma -

Rivera Early College High School
Brownsville, TX
08.1999

Skills

  • Operating Manlifts
  • Project Budgeting
  • Verify Work Quality
  • Project Commissioning
  • Rough Layouts
  • Punch Lists
  • Materials Estimating
  • Production and Processing
  • Safe Equipment Handling
  • Pneumatic Systems
  • OSHA Regulations
  • Managing Employees
  • Self Control and Integrity
  • Attention to Detail
  • Subcontractor Coordination
  • Materials Take-Offs
  • Job Planning
  • Construction Protocols and Standards
  • Hand and Power Tools
  • Delegating Work Assignments
  • Managing Subcontractors
  • Dedicated Work Ethic
  • Foreman Briefing
  • Blueprint Reading

Certification

PIPE FITTER NCCER

Timeline

Construction Superintendent

Bay Ltd.
08.2013 - Current

General Foreman

REPCON
02.2010 - 04.2012

Pipe Shop Supervisor

Shaw Group
03.2009 - 01.2010

Pipefitter Foreman

Turner Industries
01.2007 - 11.2008

Pipefitter Journeyman

REPCON
09.2006 - 01.2007

High School Diploma -

Rivera Early College High School
David Cisneros