Creative BIM professional with13 years in construction & 10 years of experience using Autodesk products to deliver quality, precision oriented LOD 200-500 models. Organized and hardworking individual knowledgeable in design, construction, and fabrication.
Results-oriented Management trainee with a broad spectrum of knowledge in commercial construction and manufacturing industries. Driven to consistently exceed objectives in sales, service, and operations. History of providing high-quality support to customers and staff alike. Focused on continuous professional development and process improvements.
Overview
13
13
Years of professional experience.
Work History
BIM Engineer
Kenosha EPC
09.2022 - Current
Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.
Controlled engineering activities to maintain work standards, adhere to timelines and meet quality assurance targets.
Displayed strong communication and interpersonal skills while visiting clients, jobsites and consultant offices to support project and business development needs.
Used Revit, Navisworks, CADmep, and BIM360 to analyze building data and design solutions.
Acted as contact for client's communication with field personnel.
Assessed new engineering designs to verify technical feasibility and compliance with building codes and company standards.
Assessed scope and requirements to make accurate project design determinations.
Drafted and reviewed construction schedules.
Achieved financial targets with well-planned and solidly implemented engineering solutions.
Monitored impacts of changes to infrastructure and MEP systems, effectively determining courses of actions based on existing conditions.
Determined schedule and budget requirements for renovation projects and coordinated efficient workflows.
Actively worked to prevent field issues by closely monitoring existing conditions on job sites to effectively collaborating with trade partners.
Worked closely with design team to minimized collisions continued managing all projects until as-built and assets where handed off to op's team.
Owner
1BIMSolution
03.2022 - 09.2022
Monitored participant workflow and behaviors throughout training process.
Performed continuous evaluations of content and plans in order to enhance delivery and improve effectiveness.
Scheduled and taught in class and online courses to increase learning opportunities.
Quickly adapted training plans for client needs, keeping timelines, budgets and desires in mind.
Used Revit to manage documentation of new and revised 3D designs.
Used Revit, Unreal Engine Navisworks and BIM360 to make presentations for owners.
Taught and trained incoming designers on proper use of graphic design software.
VDC Fabrication Specialists Consultant
Microdesk
12.2019 - 12.2021
Worked with multiple clients guiding them on proper BIM workflows
Guided team mates and built standards for internal BIM workflows
Determined scope and pricing along with hiring team members
Helped build content and build fabrication databases for clients and internal use
Helped QA software to make sure it met the industry standards to compete with larger companies.
Delivered outstanding service to clients to maintain and extend relationship for future business opportunities.
Supported clients with business analysis, documentation and data modeling.
Liaised with customers, management and sales team to better understand customer needs and recommend appropriate solutions..
Developed service plans in consultation with clients, and performed follow-ups assessing quantity and quality of services.
Tracked costs and expenses to compare with original budget and identify failure points.
Developed strategic component development plans to support future projects.
Initiated success of client's organization by improving performance, hiring practices and management systems.
Boosted success of client's organization by improving performance, hiring practices, training programs and management systems.
Took detailed notes and kept records of program and performance progress, education initiatives and leadership.
Gathered, organized and input information into digital database.
Coached staff on weekly performance and conducted evaluations to constructively address concerns.
Enhanced production of deliverables by adjusting workflows to exceed goals.
Prepared, checked and coordinated documentation to support component design and application.
Evaluated existing procedures and made proactive adjustments to meet changing demands.
Provided technical leadership for company to effectively steer strategic plans and future projects.
Established project goals to carry out directives of top management.
Coordinated project teams with up to 15 people for New construction & renovation projects in commercial and industrial development.
Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
Demonstrated respect, friendliness and willingness to help wherever needed.
Worked flexible hours; night, weekend, and holiday shifts.
Proved successful working within tight deadlines and fast-paced atmosphere.
Used critical thinking to break down problems, evaluate solutions and make decisions.
Boosted customer experiences by delivering superior customer service and issue resolution.
Observed other instructors and lecturers, gathering valuable techniques to be implemented into future lectures and courses.
Assisted adults in professional development by creating and facilitating training.
Oversaw curriculum implementation and continuous improvement of industry best practices.
Used BIM 360 to manage documentation of new and revised 3D designs.
Interpreted drawing markups and implemented drawing revisions provided by engineers.
Communicated with supervisor to brainstorm ideas and discuss upcoming projects, successfully completing them from start to finish.
Developed primary models and sketches to showcase final product designs.
Resolved problems, improved operations and provided exceptional service.
Used computer-aided design software to prepare blueprints and schematics.
Interpreted technical drawings, schematics and computer-generated reports to make revisions to CAD drawings.
Calculated dimensions and allowances with accurate precision for project specifications.
Consulted with clients to align future software development with customer priorities.
Served as technical expert on products at press events and conferences.
Aided in software implementation for clients in construction and manufacturing Industry, providing setup and initial training services.
Offered software-related technical support through various communications channels.
Performed software demonstrations for potential clients, highlighting strengths of plugins and scripts.
Provided quality assurance testing for pre-release software through alpha and beta cycle development channels.
Analyzed existing systems and databases and recommended enhancements to solve business needs
Collaborated closely with upper management to drive strategy through development and implementation of new processes.
Performed internal system acceptance to deliver well-tested enhancements and meet business requirements.
Offered input for complex documents to support client-ready final versions.
Piping Detailer
BIM, Detailer Dynamic Systems USA
09.2018 - 12.2019
Coordinate the full construction and fabrication processes
Run models and guide other trades on timely completions of projects
Review submittals, equipment, material & contract drawings to help guide project managers and engineers to efficient design
Handled communications with field and fabrication shops to finalize the deliverables process
Reviewed routings to help cut cost and create shop drawings for field installation.
Developed isometric drawings for field repairs and pipeline routings.
Effectively managed multiple projects concurrently through careful preparation and time management.
Interacted with clients to discuss project design and better understand scope changes.
Provided extensive support to project in all aspects of piping design for MEP client.
Utilized exemplary communication and active listening skills to develop strong rapport with employees in other departments and clients.
Eliminated risks by correctly identifying potential safety hazards.
Planned pipe system layout, installation and repair according to specifications.
Communicated with customers to provide recommendations on repairs, determine project estimation costs and define project completion dates.
Read and interpreted blueprints and schematics to determine locations, quantities and sizes of materials required.
Evaluated inconsistencies in current and pending designs to reduce and prevent future challenges.
Produced engineering design solutions to optimize existing industrial equipment.
Used Revit and Autocad to prepare 3D models and 2D drawings.
Facilitated and coordinated project meetings with design team, engineers and product consumers.
Created 3D valves, fittings and actuators for parts library.
Located positions for equipment, control panels electric panels and pipe supports.
Interacted with engineers and architects to clarify design intent and resolve implementation issues.
Assembled work packages and presented scopes of work and drawings to clients and construction teams.
Oversaw, mentored and trained junior designers and CAD operators providing guidance.
BIM Coordinator/ Trimble Manager
TDIndustries
11.2016 - 07.2018
Interpreted drawing markups and implemented drawing revisions provided by engineers.
Carried out day-day-day duties accurately and efficiently.
Gathered photo references to use as guidelines for models.
Developed primary models and final product designs.
Taught and trained incoming designers on proper use of graphic design software.
Created scale and full-size blueprints, highlighting all aspects of mechanical designs.
Updated designs with latest feedback from customers and supervisors.
Worked with CAD systems and software to turn engineer designs into workable specifications, drawings and equipment details.
Built 3D models with Revit to outline machinery designs for production teams.
Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
Researched customer design proposals and requests to evaluate feasibility, cost, and maintenance requirements of designs.
Developed communication documentation to help convey key design aspects to clients.
Developed manufacturing drawings and oversaw teams of technicians in construction of systems.
Designed and optimized mechanical components for fabrication and installation.
Developed and supported workflows and procedures for layout design and managed multiple teams using total stations.
CAD Designer/BIM Coordinator/ Trimble Manager
Raven Mechanical
03.2013 - 11.2016
Coordinated the construction of plumbing systems
Assisted with Calculation and design of plumbing systems on design build projects along with managing layout drawings and Trimble team.
Prepared, checked and coordinated documentation to support component design and application.
Evaluated existing procedures and made proactive adjustments to meet changing demands.
Presented project information and status updates to customers and fielded concerns.
Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
Carried out day-day-day duties accurately and efficiently.
Demonstrated respect, friendliness and willingness to help wherever needed.
Worked flexible hours; night, weekend, and holiday shifts.
Performed duties in accordance with applicable standards, policies and regulatory guidelines to promote safe working environment.
Proved successful working within tight deadlines and fast-paced atmosphere.
Used critical thinking to break down problems, evaluate solutions and make decisions.
Offered friendly and efficient service to customers, handled challenging situations with ease.
Developed and maintained courteous and effective working relationships.
Lead Technician,Trimble Operater
Raven
11.2012 - 03.2013
Drafted system setup and imaging documentation, creating standardized frameworks to rapidly onboard new hardware.
Understood local city plumbing codes and interpreted architectural and mechanical drawings.
Supervised installation, maintenance and repair of plumbing systems and related appurtenances.
Assigned plumbers to specific tasks to complete and supervised activities for quality.
Trained workers in proper methods, equipment operation and safety procedures.
Directed projects according to schedule and quality demands.
Inspected sights to evaluate safety, operations and crew performance against objectives.
Calculated materials and labor required to complete jobs on-schedule and prepared estimates.
Carried out day-day-day duties accurately and efficiently.
Worked independently in fast-paced environment while meeting productivity and quality expectations.
Utilized hammers, saws, squares, levels and fastening devices to complete projects.
Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
Interacted daily with various project managers, subcontractors and municipal inspectors to complete construction projects.
Prepared job sites for work plans by measuring and marking different distances.
Interpreted job site supervisor's orders and technical documentation to complete accurate work.
Plumber's Apprentice
Plumber BEST PLUMBING
03.2011 - 11.2012
Installed valves, hangers, supports and flanges inside piping systems.
Selected type and size of piping required for each project.
Worked from drawings, sketches or verbal instructions to install and modify plumbing systems.
Obtained precise results by performing accurate hydro testing.
Measured, threaded and cut materials to correct angles.
Located and repaired or replaced worn and broken components to enhance system functionality and durability.
Conducted thorough inspects and tests of previously installed systems to locate and correct faults.
Fabricated piping pieces and components in line with design specifications for each system.
Finalized plumbing systems with correct piping, fittings and valves.
Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.
Cut and drilled holes in walls to permit passage of pipes.
Planned pipe system layout, installation and repair according to specifications.
Completed preventive maintenance on water heaters, toilets, urinals and plumbing fixtures.
Operated drill motors, grinders, chop saws, hack saws and burning torches to perform duties.
Fit valves, couplings and assemblies to tanks and pumps.
Secured rising mains and boiler piping to structural supports in new construction and remodeling projects.
Loaded and unloaded building materials along with preparing materials for construction.
I am in the process of relaunching 1BIMSolution in a different direction. My goal is to be able to recruit young professionals who don't have the ability to afford traditional college courses. In doing so I believe I can offer a low cost staff augment with the potential to hire when the company sees fit this will also allow peace of mind by guaranteeing quality of work.