Summary
Overview
Work History
Education
Skills
Timeline
Generic

David Davis

Skilled Labor
Lynx,OH

Summary

Dynamic Project Manager with a proven track record at Labor Saver, adept at strategic planning and risk management. Successfully delivered high-quality projects on time by prioritizing tasks and fostering strong client relations. Skilled in contract negotiation and team collaboration, enhancing project outcomes and client satisfaction.

Overview

27
27
years of professional experience

Work History

Project Manager

Laber Saver
Loveland, Colorado
04.2020 - 09.2025
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Identified plans and resources required to meet project goals and objectives.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Monitored progress against established goals, adjusting schedules and resources as needed to keep projects on track.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Managed risk assessments and implemented mitigation strategies to minimize potential issues during project execution.
  • Developed comprehensive project plans with clear timelines, milestones, and budget requirements, ensuring timely delivery of high-quality results.
  • Developed strong relationships with stakeholders through regular communication updates, fostering trust and confidence in the team''s ability to deliver results.
  • Enhanced overall project success by conducting thorough post-project evaluations and incorporating lessons learned into future efforts.
  • Negotiated and managed third-party contracts related to project deliverables.
  • Proved successful working within tight deadlines and a fast-paced environment.

Lead Water Technician

US Flood Team
Loveland , OH
09.2015 - 03.2022
  • Led a team of technicians in maintaining and repairing water systems for optimal performance.
  • Trained new hires on proper procedures, safety protocols, and equipment usage, ensuring consistency in service delivery.
  • Improved water quality by conducting regular testing and implementing appropriate treatment methods.
  • Established strong relationships with vendors and suppliers, negotiating favorable terms that resulted in significant cost savings over time.
  • Evaluated performance metrics regularly to inform continuous improvement strategies targeting increased efficiency levels.
  • Implemented cost-saving measures by optimizing the use of resources such as chemicals, energy, and manpower during treatment processes.
  • Reduced downtime with efficient troubleshooting and resolving issues in water supply systems.
  • Spearheaded community outreach initiatives aimed at educating customers about responsible water usage practices that contributed to overall conservation efforts.
  • Enhanced customer satisfaction by addressing concerns related to water quality and system maintenance promptly.
  • Conducted routine inspections of water infrastructure to identify potential problems before they escalated.
  • Developed and implemented risk management plans for water treatment plant.
  • Adhered to EPA and OSHA regulations.
  • Serviced, cleaned and supplied restrooms.
  • Gathered and emptied trash.
  • Wiped windows, glass surfaces and mirrors to give public and employee areas professional and clean appearances.
  • Maintained proper handling, storage, mixing and application procedures when working with detergents and chemicals.

Total Package Laber

Local Union 265
Loveland, OH
09.1998 - 08.2015
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Expanded skill set through continuous learning of new techniques, tools, and equipment related to laborer tasks.
  • Supported construction projects by assisting with heavy equipment operations and manual labor tasks.
  • Enhanced project timelines by collaborating effectively with team members on various tasks.
  • Performed general housekeeping and cleaning tasks.
  • Assisted in reducing material waste by accurately measuring, cutting, and assembling materials as needed.
  • Promoted a positive work environment by demonstrating strong teamwork and communication skills.
  • Delivered consistent results under challenging weather conditions or other external factors affecting productivity.
  • Demonstrated flexibility with shifting responsibilities based on project needs, contributing to overall productivity levels.
  • Upheld company reputation for quality workmanship through dedication to best practices within the laborer role.
  • Facilitated timely project completions by consistently meeting deadlines for assigned tasks.
  • Mitigated potential hazards with thorough site cleanup efforts at the end of each workday.
  • Ensured safety compliance through regular inspection of tools and equipment, reporting any issues promptly.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Cleaned and maintained tools, equipment and worksites.
  • Used variety of hand and power tools to complete tasks.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Provided labor support to carpenters, masons and other skilled trades.
  • Mixed and poured concrete for variety of projects.
  • Worked on sites, installing roofs and other exterior components.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Assisted in digging, trenching and backfilling trenches and foundations.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Helped with erecting scaffolding and ladders.
  • Installed drywall, siding and other structural components.
  • Operated forklifts and boom lifts to complete various tasks.
  • Finished surfaces of woodwork or wallboard in houses and buildings with paneling, paint and hand tools.

Education

High School Diploma -

Goshen High School
Goshen, OH
06.1997

Skills

Project management

Project planning

Risk management

Schedule management

Work flow planning

Project scheduling

Client relations

Productivity improvement

Contract management

Staff management

Project closure

Processes and procedures

Inventory control

Construction management

Customer relations specialist

Residential construction

Drywalling

Timeline

Project Manager

Laber Saver
04.2020 - 09.2025

Lead Water Technician

US Flood Team
09.2015 - 03.2022

Total Package Laber

Local Union 265
09.1998 - 08.2015

High School Diploma -

Goshen High School
David DavisSkilled Labor