Adept at optimizing project outcomes, I spearheaded a team at HEMI Systems, achieving completion under budget with precision in pipefitting and leadership. My expertise in blueprint analysis and fostering team collaboration has consistently enhanced safety and efficiency on job sites, securing successful project deliveries and stakeholder satisfaction.
Overview
25
25
years of professional experience
1
1
Certification
Work History
Pipefitter
Systems Maintenance Services
09.2024 - 12.2024
feild enginered fabricated and installed pipe whithout prints
Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
Threaded pipes using piping machines.
Followed safe work practices, which included fall protection and personal protective equipment.
Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
Installed new systems and connected piping to existing components by welding, bolting and threading.
Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems.
Enhanced safety by conducting regular inspections of tools and equipment, ensuring proper maintenance and functionality.
Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
Contributed to overall company success by maintaining a strong work ethic, adaptability, and commitment to delivering exceptional service on all projects undertaken.
Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
Demonstrated versatility in skillset by working with various types of pipes such as PVC, copper, steel, cast iron among others.
Utilized specialized tools and equipment for precise pipefitting processes, ensuring optimal results for each project.
Contributed to successful project outcomes by working closely with plumbers, steamfitters, and welders on diverse job sites.
Optimized material usage by accurately measuring and calculating required materials for each project, minimizing waste.
Increased efficiency by collaborating with team members to install, assemble and repair piping systems in various construction projects.
Supported fellow team members in their tasks, fostering a collaborative work environment that prioritized both safety and efficiency.
Maintained high-quality standards through consistent attention to detail while fitting pipes according to building code requirements.
Improved workflow with efficient pipe system modifications, including cutting, threading, welding, and soldering components as needed.
Consistently met client expectations through timely completion of projects while maintaining high levels of quality control checks throughout the process.
Reduced project completion time by interpreting blueprints, sketches, and specifications to accurately plan pipefitting installations.
Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
Supported team efficiency through clear communication regarding progress updates and potential issues during the course of projects.
Assisted in achieving project deadlines through effective organization of work assignments and prioritization of tasks based on urgency.
Connected piping systems to water heaters, boilers, pumps and auxillary equipment to complete installations.
Inspected and tested existing pipe systems to identify system defects and malfunctions.
Continuously expanded knowledge of industry best practices through participation in professional development courses and workshops.
Performed preventive maintenance to clean, adjust and lubricate piping systems and parts.
Collaborated effectively with supervisors to ensure that all necessary permits were obtained before commencing work on new projects.
Maximized system longevity through routine preventative maintenance checks on existing piping infrastructure within various industrial settings.
Collaborated with engineers to design piping systems that met project specifications and budget constraints, delivering high-quality results.
Implemented innovative pipe bending methods to preserve pipe strength and functionality, extending system lifespan.
Enhanced safety on job sites by strictly adhering to OSHA regulations and conducting regular safety audits.
Improved project completion times by coordinating effectively with other tradespeople on large-scale industrial projects.
Pipe General Foreman
Gulfspan Industrial
09.2022 - 05.2023
Supervised the fabrication shop as well as another crew working in the field. Great job good people,
Pipe General Foreman
Ohmstede Industrial Services
01.2000 - 01.2022
Conducted thorough pre-construction reviews of drawings and specifications to identify potential issues before they impacted project progress or budget.
Optimized field operations equipment usage labor distribution resulting in significant cost savings increased profitability across multiple projects.
Conducted regular performance evaluations for team members, identifying strengths weaknesses opportunities for improvement.
Improved project efficiency by consistently meeting deadlines through effective resource allocation and task delegation.
Pipefitter Foreman
Stork
01.2017 - 02.2020
my crew and i say my crew for a reason, Because anybody in supervision relies on his team , Very important to me to have the right people. We as a team fabricated and installed around 40000 feet of 6 and 8 inch pipe at Formosa plastics in Point Comfort TX
General Foreman
HEMI Systems
04.2014 - 10.2016
I was responsible for a piping system that started at 24 inch went vertical to 36inch stepped up incrementally to 56 inch . many rolling offsets and laterals, at peak of the job i had 20 welders 15 fitters and equipment operators under my supervision, We finished the project on time and under budget!
Worked alongside team to accomplish work goals according to schedule.
Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
Completed final walkthroughs at job sites to close out projects.
Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
Demonstrated strong leadership abilities in managing diverse teams to achieve common goals while fostering a positive work environment.
Improved project efficiency by effectively delegating tasks and managing a team of skilled workers.
Showcased exceptional adaptability when faced with unexpected project challenges, rapidly adjusting strategies and reallocating resources to maintain progress and minimize delays.
Delivered project updates to superintendent and detailed issues that could halt work progress.
Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
Collaborated with subcontractors for seamless coordination of work scopes, ensuring smooth project execution from start to finish.
Ordered necessary supplies and materials required for installation of new work and remodeling of existing systems.
Kept teams properly supplied with materials, tools, plans and supplementary assistance to meet project deadlines.
Liaised between field engineers and trade workers align construction projects with drawings and specifications.
Conducted thorough risk assessments before commencing projects, identifying potential challenges and developing contingency plans accordingly.
Assigned daily duties to each employee based upon individual strengths, effectively completing [Number]% of roofing jobs on time.
Established open lines of communication with clients, providing regular updates on project status and addressing concerns promptly.
Mentored junior team members in the development of their skills, providing guidance and support that facilitated career advancement opportunities.
Ensured compliance with all relevant regulations and industry standards during the execution of assigned tasks, mitigating potential legal issues or penalties.
Contributed to company growth by consistently delivering exceptional results, leading to repeat business opportunities from satisfied clients.
Maintained cost-effective inventory of spare parts to help achieve production goals.
Prepared daily time cards and assisted in preparation of estimates and scope of work statements.
Planned each job with appropriate safety measures, addressing weight limits and fall protection.
Adhered to US Occupational Health and Safety Administration mandates requiring use of gloves and insulating blankets for installation of high-voltage equipment.
Optimized resource allocation for increased productivity by closely monitoring project progress and adjusting schedules as needed.
Elevated team morale through the implementation of effective recognition programs that acknowledged outstanding individual contributions.
Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
Streamlined workflow processes by introducing innovative tools and techniques that enhanced overall efficiency levels.
Spearheaded training initiatives to develop workforce skills, resulting in improved performance and reduced turnover rates.
Inspected completed work to verify quality standards and compliance with criteria.
Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
Checked equipment to determine if maintenance was required.
Reviewed project details to specify correct materials and equipment for job sites.
Oversaw daily operations at site, keeping team production moving at optimal pace.
Investigated and reported on accidents, injuries and near-miss incidents.
Provided feedback to workers on job performance and safety procedures.
Supervised layout, assembly and installation of various sizes and types of drainage pipes.
Trained workers in proper methods, equipment operation and safety procedures.
Prepared and submitted reports on job progress and safety conditions to upper management.
Administered disciplinary actions to workers violating safety regulations and company policies.
Directed projects according to schedule and quality demands.
Inspected equipment and tools used for safe operation.
Developed and maintained positive relationships with clients and other stakeholders.
Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
Supervised training of new construction and extraction workers on safety practices and procedures.
Devised and implemented safety protocols to reduce risks on construction and extraction sites.
Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
Established and enforced safety regulations, procedures and standards for construction and extraction workers.
Assisted in recruiting and hiring new construction and extraction workers.
Created and implemented plans to maximize efficiency of workers.
Supported construction and extraction workers to facilitate timely completion of projects.
Communicated with stakeholders on job milestones.
Feild Engineer
Asi Piping
03.2002 - 09.2002
Layed out cut lines on existing pipe and new tower. Overseen the transition fabrication piping . We picked up a coke tower ou ,
t of the middle of the unit, Dropped the new tower in place .All my transition rolling offsets i pre fabbed on the ground tacked right in an welded out. Lots of planning!
Education
High School Diploma -
Port Neches Groves
Port Neches, TX
Computer And Information Systems
Lamar University
Port Arthur, TX
Skills
Worksite safety
Pipe measuring
Safety procedures
Blueprints and specifications
Pipefitting
Material cutting
Pipe hanger installation
Installation and maintenance
Pipe threading
Piping specifications
Flange assembly
Grooved pipe installation
Pressure testing
Welding
Pipe support design
Hand and power tools
Emergency repairs
Steam piping
Materials ordering
Threaded pipe fabrication
Commercial pipefitting
Project management
Commercial construction experience
Residential construction
Material selection
Construction management
Material prepping
Systems troubleshooting
Pipe welding
Blueprint analysis
Hydraulic systems
Pipe insulation
Work order management
Diagram interpretation
Materials selection
Pneumatic systems
Equipment testing
Brazing joints
Project estimation and bidding
Hydraulics
HVAC systems
Pipe cutting
Piping layout
Leak detection
Codes expertise
Pneumatic and hydraulic equipment
Piping installations
OSHA rules and regulations
cGMP compliance
Industrial piping
Cutting and threading
Pipe bending
Valve installation
Job order prioritization
Piping diagram interpretation
Pipe fabrication
Maintenance and repair
Construction installations
Problem-solving
Piping installation
Blueprint reading
Skilled with both hand and power tools
Hand and power tool operation
Power tool operation
OSHA compliance
Decision-making
Layout planning
Equipment maintenance
Mentoring and coaching
Job site evaluation
Team collaboration
Systems testing
Relationship building
Schematic reading
Preventive Maintenance
Plumbing repairs
Equipment inspection
Safety protocols
Quality control
Codes compliance
Project estimation
Commercial plumbing
Parts fabrication
Industrial plumbing
Basic carpentry
Heavy lifting
Emergency response
Code compliance
Safety inspection
Detail-oriented
Conflict resolution
Commercial and residential jobs
Project bids
Certification
NCCER Boilermaker Certification - National Center for Construction Education and Research (NCCER).
NCCER Pipefitter Certification - National Center for Construction Education and Research (NCCER).
Technical Support Engineer II at Systems Maintenance Services, Dell TechnologiesTechnical Support Engineer II at Systems Maintenance Services, Dell Technologies