Summary
Work History
Education
Skills
Timeline
Hi, I’m

David Golden

13041 moorpark st APT#4 studio city,Ca

Summary

Proficient [Job Title] skilled in pipe installations for diverse projects such as water and sewer systems. Well-versed in following instructions, drawings and orders and resolving routine and complex problems

Work History

Foster construction
26893 bouquet canyon road # c-188

Pipe layer,operater,concrete finisher,head tender of masonry, grade checker,laborer
03 2020 - 08 2024

Job overview

  • Maintained clean and organized work site, contributing to safer working environment for all personnel.
  • Installed various types of pipes, including PVC, concrete, and metal, ensuring efficient water and waste flow for municipal projects.
  • Handled all repairs for sanitary and storm water sewer structures and pipe systems.
  • Boosted productivity by efficiently using hand tools such as pipe cutters, wrenches, and shovels in pipe laying tasks.
  • Covered completed pipes with earth or materials and prepared sites for grading.
  • Used hand signals to direct equipment operators and alert to hazards.
  • Observed all safety measures and company equipment policies to prevent job site accidents.
  • Used equipment such as rollers, dump trucks and front-end loaders to move important supplies.
  • Graded or leveled trench bases using tamping machines or hand tools.
  • Read and understood drawings, written instructions and blueprints to plan work and layout pipe.
  • Adapted to diverse working conditions, from urban environments to remote locations, ensuring high-quality work regardless of setting.
  • Assembled and installed underground pipe, fittings, and valves of various sizes.

Gall Brothers General Engineering
514 commerce Avenue STE-A palmdale ca 93551

Pipe Layer wet and dry
02 2018 - 03 2020

Job overview

  • Displayed adaptability by seamlessly transitioning between various types of pipe materials, including PVC, steel, and concrete pipes.
  • Maximized team performance by providing mentorship and guidance to less experienced crew members, fostering a culture of learning and growth.
  • Observed all safety measures and company equipment policies to prevent job site accidents.
  • Contributed to a decrease in on-site accidents through diligent adherence to safety protocols during heavy machinery operation.
  • Assembled and installed underground pipe, fittings, and valves of various sizes.
  • Adapted to diverse working conditions, from urban environments to remote locations, ensuring high-quality work regardless of setting.
  • Maintained clean and organized work site, contributing to safer working environment for all personnel.
  • Used hand signals to direct equipment operators and alert to hazards.
  • Optimized water flow in residential areas with precise installation of sewage and drainage pipes.
  • Followed plans to locate existing utilities prior to digging and flagged locations for operators.
  • Graded or leveled trench bases using tamping machines or hand tools.

Sierra construction and excavation inc
10417 meacham road Bakersfield ca, 93312

Pipe Layer
03 2017 - 02 2018

Job overview

  • Maintained clean and organized work site, contributing to safer working environment for all personnel.
  • Contributed to a decrease in on-site accidents through diligent adherence to safety protocols during heavy machinery operation.
  • Enhanced safety protocols on site by meticulously adhering to all federal and state regulations during pipe laying operations.
  • Installed various types of pipes, including PVC, concrete, and metal, ensuring efficient water and waste flow for municipal projects.
  • Displayed adaptability by seamlessly transitioning between various types of pipe materials, including PVC, steel, and concrete pipes.
  • Used hand signals to direct equipment operators and alert to hazards.
  • Conducted thorough pre-installation site inspections to assess and prepare groundwork for pipe laying, minimizing disruptions.
  • Observed all safety measures and company equipment policies to prevent job site accidents.
  • Reviewed schematics and measured pipes to make accurate cuts.
  • Used equipment such as rollers, dump trucks and front-end loaders to move important supplies.
  • Read and understood drawings, written instructions and blueprints to plan work and layout pipe.

Bobby J's concrete finishing
26910 sierra hwy #262 Santa clarita ca,91321

Concrete finisher,laborer
06 2013 - 03 2017

Job overview

  • Mixed, spread, and patched concrete to specifications.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Created specific finishes on poured concrete.
  • Shoveled materials such as dirt, gravel, and asphalt.
  • Set wood and other forming materials to prepare for concrete pours.
  • Demolished and repaired old concrete surfaces.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Observed manufacturer's safety procedures and corporate standards for pouring and finishing.
  • Routinely lifted and moved items weighing up to [Number] pounds.
  • Completed physically demanding tasks such as lifting up to [Number] pounds to move job materials.
  • Enhanced team productivity, guiding less experienced workers on proper finishing techniques.
  • Reduced project downtime by maintaining and cleaning tools and equipment, ensuring readiness for each task.
  • Reduced material wastage through effective use of leveling, screeding, and concrete smoothing techniques.
  • Upheld company reputation for excellence in the field through consistent delivery of high-quality finished surfaces that met or exceeded client expectations.
  • Monitored concrete as it was poured, spread, and leveled, adjusting work for weather conditions.
  • Enhanced overall job site safety by ensuring proper usage of tools and equipment during concrete finishing processes.
  • Achieved smooth finishes by operating power vibrator to compact concrete.
  • Demonstrated versatility by successfully completing various types of concrete projects, including residential, commercial, and industrial applications.
  • Improved durability and appearance of structures with application of sealants and waterproofing compounds.
  • Achieved cost savings through effective reuse and maintenance of finishing tools and equipment.
  • Prepared and placed concrete to create sidewalks, driveways, or patios.
  • Troweled and finished concrete to create textured or decorative surfaces.
  • Handled repairs on concrete finishing equipment, keeping tools operational.
  • Installed forms for shaping, insulating, or creating decorative effects in concrete.

Design Masonry
20703 Santa Clara st Santa clarita ca,91351

Mason Tender
08 2011 - 06 2013

Job overview

  • Mixed mortar by hand and with power mixer.
  • Enhanced project efficiency by mixing and preparing mortar for masonry work.
  • Ensured timely completion of projects by maintaining clean and organized work sites.
  • Contributed to high-quality construction projects by transporting materials to the worksite as needed.
  • Managed inventory of supplies on-site so that necessary materials were always available when needed.
  • Built and took down scaffolding for larger jobs.
  • Collaborated closely with other trade professionals such as electricians or plumbers for seamless coordination during joint projects.
  • Used hand and power tools such as block saws on daily basis.
  • Cut and bent reinforced steel to support constructions.
  • Gained familiarity with different types of building materials, including bricks, stones, and concrete blocks to provide the best quality workmanship for each project.
  • Supported team members in completing complex masonry tasks through effective communication and collaboration.
  • Assisted with structural repairs of existing buildings while preserving architectural integrity, ensuring long-lasting results for clients'' investments.
  • Cut materials to the correct size using power saws, chisels, or hammers, ensuring proper fit and placement.
  • Assisted masons in laying bricks, blocks, and stones with precision and attention to detail.
  • Expedited project timelines by quickly responding to mason requests for assistance or materials during construction processes.
  • Demonstrated strong work ethic while performing physically demanding tasks such as lifting heavy objects or operating machinery.
  • Increased productivity by efficiently loading, unloading, and organizing tools and materials on job sites.
  • Molded expansion joints and edges using correct tools.
  • Operated drills, paving breakers, and powered abrasive saws to cut or demolish bricks and concrete.
  • Applied sealants or other protective coatings to waterproof or restore concrete surfaces.
  • Signaled truck drivers to position truck to facilitate pouring concrete into constrained locations.
  • Operated equipment such as forklifts to move bricks and supplies.
  • Applied hardening and sealing compounds to cure surface of concrete and waterproof or restore surfaces.
  • Used rakes and shovels to spread, level and smooth concrete.
  • Operated power vibrator to compact materials and create level bases.
  • Cut bricks and concrete using approved tools such as powered abrasive saws, paving breakers, drills, and hand tools.
  • Performed basic masonry tasks such as tuckpointing, caulking, grinding, and other required duties.
  • Repaired and replaced damaged bricks, blocks and pavers.

Randy A Frei Construction
2510 W Sunbrook Dr Saint George UT 84770

Basement wall form setter
09 2009 - 08 2011

Job overview

  • Poured, vibrated, and graded concrete.
  • Enhanced project efficiency by identifying and implementing innovative solutions for common challenges faced during the form setting process.
  • Contributed to a safe working environment by adhering to company safety protocols and guidelines at all times.
  • Chipped, scraped, and grinded high spots to level finished concrete.
  • Improved overall team efficiency by diligently maintaining a clean and organized work area.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Set wood and other forming materials to prepare for concrete pours.
  • Safely operated concrete-cutting and finishing drills, power saws and trowels to complete assigned tasks.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Routinely lifted and moved items weighing up to [Number] pounds.
  • Used variety of hand and power tools to complete tasks.
  • Cleaned and maintained tools, equipment and worksites.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Loaded and unloaded materials onto trucks and trailers.
  • Provided labor support to carpenters, masons and other skilled trades.
  • Assisted in digging, trenching and backfilling trenches and foundations.

Bang concrete llc
1745 E 3850 #1 St George UT 84790

Basement form setter
06 2007 - 09 2009

Job overview

  • Collaborated with fellow form setters to complete projects on schedule and within budget constraints.
  • Poured, vibrated, and graded concrete.
  • Read digital and paper blueprints and created and laid accurate forms.
  • Gained proficiency in various form systems utilized throughout the industry, enabling seamless transitions between different project types or requirements.
  • Developed strong relationships with coworkers, fostering a positive work environment that encouraged teamwork and collaboration.
  • Upheld company reputation for excellence in craftsmanship through attention to detail in all aspects of form setting duties performed onsite.
  • Improved overall team efficiency by diligently maintaining a clean and organized work area.
  • Enhanced project efficiency by identifying and implementing innovative solutions for common challenges faced during the form setting process.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Set wood and other forming materials to prepare for concrete pours.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Routinely lifted and moved items weighing up to [Number] pounds.
  • Used variety of hand and power tools to complete tasks.
  • Cleaned and maintained tools, equipment and worksites.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Loaded and unloaded materials onto trucks and trailers.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Provided labor support to carpenters, masons and other skilled trades.

Education

Golden oak adult school

01.1996

Skills

  • Storm drain piping
  • Loading and unloading piping
  • Equipment and tools
  • Pipe laying
  • Backfilling experience
  • Manhole setting
  • Hydrant installation
  • Self-Motivated
  • Teambuilding
  • Maintenance and Repair

Timeline

Pipe layer,operater,concrete finisher,head tender of masonry, grade checker,laborer

Foster construction
03 2020 - 08 2024

Pipe Layer wet and dry

Gall Brothers General Engineering
02 2018 - 03 2020

Pipe Layer

Sierra construction and excavation inc
03 2017 - 02 2018

Concrete finisher,laborer

Bobby J's concrete finishing
06 2013 - 03 2017

Mason Tender

Design Masonry
08 2011 - 06 2013

Basement wall form setter

Randy A Frei Construction
09 2009 - 08 2011

Basement form setter

Bang concrete llc
06 2007 - 09 2009

Golden oak adult school

David Golden