Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
David Hall

David Hall

Newport,NC

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

13
13
years of professional experience
1
1
Certificate

Work History

Superintendent

Yates Construction
11.2015 - Current

Work

2015 TPCO Pipe Plant in TX, I learned how to read construction drawling also use a tremble total station where I check anchor bolts and QC work using drawings and specifications.

2016 to 2017 I worked in Santa Rosa Beach Fl, We built a four-story condo 31 on 30A. On this job i did all the layout for the auger cast piles, foundations, and keep control lines and a benchmark elevation for subcontractors. I also operated heavy equipment.

2018-2020 I worked in Hollywood Fl, Holywood Hard Rock 1.8 billion dolor job where at the peak of the job we had over 3000 employees. For my first 4 mounts on this job i was an assistant superintendent where I assisted a superintendent in day to day activates wile he cootch me in how to be an effective superintendent.

2020 till Dec of 2020 i worked in Nashville TN an the Virgin Hotel. I was sent to the job to help push completion and the punch list. Aso worked at the Embassy Suites & 1-Hotel where i worked with the framers and electricians.

Dec 2020 to Sep 2021 I worked At the Beach Club in Alabama. This job was hurricane damage repair where the condos where completely gutted and rebuilt.

Sep 2021 to present, Im at the Rivers Casino in Portsmouth VA, on this job i am the superintendent in charge of the structure, the shell of the building and the roof. I also helped other superintendents with the interior work.

  • Monitored priorities and liaised between team and management, delegating tasks to complete on time.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.
  • Supervised staff by checking work against project expectations.
  • Maintained safety onsite and upheld all OSHA regulations by [Action].
  • Monitored daily progress and work quality.
  • Communicated and documented expectations to subcontractors during weekly meetings.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Reviewed and studied blueprints to double-check installation and implementation project requirements.
  • Oversaw daily operations at site, keeping team production moving at optimal pace

Installer

Dowty Air Conditioning
11.2014 - 08.2015

In staled AC units

Insulator

Allied Insulation
08.2012 - 09.2014
  • Cut, formed and arranged insulation to promote efficiency of materials for each project.
  • Measured and prepared work materials and surfaces by marking dimensions and reference lines on material.
  • Fabricated fiberglass pipe and duct materials for installation in commercial and residential projects.

Cook, Dishwasher

Pizza Inn
01.2010 - 08.2012
  • Checked for quality, kept track of old and new items and rotated stock to confirm freshness of food and ingredients.
  • Kept work area clean, dry, and free of debris to prevent incidents and accidents.
  • Set up and prepared cooking supplies and workstations during opening and closing to maximize productivity.
  • Cleared, washed and stacked all plates, dining utensils, and trays quickly and without breaking.
  • Kept kitchen areas neat and clean by removing trash and organizing supplies.
  • Managed time by organizing and prioritizing kitchen duties to prepare and serve food quickly.
  • Instructed new staff in proper food preparation, storage, use of kitchen equipment and sanitation.
  • Changed and sanitized cutting boards, benches, and surfaces between tasks to avoid cross-contamination.

Education

High School Diploma -

Croatian High School
Newport, NC
06.2012

Skills

  • Team Oversight
  • Commercial Projects
  • Quality Assurance
  • Policy Implementation
  • Safety Oversight
  • Hand and Power Tools
  • Subcontractor Relations
  • Coordinate Work
  • Adaptability and Flexibility
  • Dependable and Consistent

Certification

  • OSHA 30HR
  • CPRFIRST
  • CONFINED SPACE
  • FORKLIFT
  • AERIAL LIFT
  • SCISSOR LIFT
  • TRACKHOE
  • LOADER
  • DOZER

Timeline

Superintendent

Yates Construction
11.2015 - Current

Installer

Dowty Air Conditioning
11.2014 - 08.2015

Insulator

Allied Insulation
08.2012 - 09.2014

Cook, Dishwasher

Pizza Inn
01.2010 - 08.2012

High School Diploma -

Croatian High School
  • OSHA 30HR
  • CPRFIRST
  • CONFINED SPACE
  • FORKLIFT
  • AERIAL LIFT
  • SCISSOR LIFT
  • TRACKHOE
  • LOADER
  • DOZER
David Hall