Summary
Overview
Work History
Education
Skills
Affiliations
Timeline
Generic

David Leonard

Roseville,CA

Summary

Dynamic estimator with several-year track record of developing and maintaining cost estimation for large and small projects. Experienced in estimating and providing accurate reports on material costs and labor for construction projects. Maintains great relations with contractors and vendors.

Overview

25
25
years of professional experience

Work History

Fire Sprinkler Estimator/Project Manager

Elite Automatic Fire Protection Systems, Inc.
Rocklin, CA
04.2016 - Current
  • Reviews and analyses plans, specifications, proposals, and other documentation to prepare time, cost, materials, and labor estimates.
  • Maintains accurate records of estimated versus actual costs incurred during projects.
  • Compiles data from suppliers to update material pricing databases as needed.
  • Attends pre-bid meetings with prospective clients as needed.
  • Conducts site visits when necessary to gain better understanding of scope of work prior to submitting an estimate.
  • Prepares conceptual estimates based upon limited information available at the early stages of a project.
  • Identifies potential risks associated with proposed projects and recommends strategies for mitigating those risks.
  • Obtained bids from vendors and subcontractors to make cost-effective selections.
  • Prepared detailed reports highlighting the basis for cost estimates, including assumptions and exclusions.
  • Directed and negotiated change orders and claims for contractors, suppliers and architects.
  • Analyzed blueprints and other documents to prepare time, cost and labor estimates.

Fire Sprinkler Division Manager

Mark III Construction
Sacramento, CA
06.2013 - 03.2016
  • Created and maintained budget for departmental operations, including personnel costs, materials, equipment and supplies.
  • Conducted regular employee reviews to assess job performance and identify training needs.
  • Coordinated resources for successful completion of projects within timeline and budget constraints.
  • Facilitated communication between all levels of management throughout the division.
  • Established performance standards for employees to ensure efficient workflow and quality results.
  • Implemented changes in response to changing market conditions or customer demands.

Fire Sprinkler Superintendant

Foothill Fire Protection, Inc.
Loomis, CA
09.2005 - 06.2013
  • Established procedures for completing projects within specified budgets and timelines.
  • Conducted regular meetings with contractors, subcontractors, laborers to review progress and address any issues, concerns.
  • Provided technical advice for resolving design problems and construction issues.
  • Assisted in preparing bids for new projects by analyzing blueprints, specifications and other documentation related to the project.
  • Managed multiple projects simultaneously using effective resource planning techniques.
  • Reviewed project proposals, estimates, schedules and contracts related to the project.

Journeyman Fire Sprinkler Systems Installer

Economy Fire Protection
Hollywood, FL
06.2002 - 08.2005
  • Coordinated with general contractors to ensure jobs were completed according to schedule.
  • Communicated effectively with customers about their needs and expectations for their projects.
  • Ensured that all materials used met code requirements for safety and functionality.
  • Installed, tested and maintained fire sprinkler systems in accordance with NFPA standards.
  • Worked independently or as part of a team depending on the project size or scope of work required.

Fire Sprinkler Systems Installer

Foothill Fire Protection, Inc.
Loomis, CA
07.1999 - 06.2002
  • Installed fire sprinkler systems in accordance with local codes and regulations.
  • Performed tests on newly installed systems to ensure proper operation.
  • Assembled and installed valves, pipes, fittings, gauges, alarms and other components of fire suppression systems.

Education

Bachelor of Arts - Child Development

California State Fullerton
Fullerton, CA
06-2000

Skills

  • Cost Control
  • Project Planning
  • Contract Management
  • Logistics Management
  • Document Management
  • Work flow planning
  • Vendor Sourcing

Affiliations

  • Club and High School Wrestling Coach at Del Oro High School
  • I enjoy traveling the state and country following my sons high school wrestling career.
  • I enjoy attending concerts and music festivals with my wife and son.
  • I enjoy working on, and attempting to restore my 1942 Willy's.

Timeline

Fire Sprinkler Estimator/Project Manager

Elite Automatic Fire Protection Systems, Inc.
04.2016 - Current

Fire Sprinkler Division Manager

Mark III Construction
06.2013 - 03.2016

Fire Sprinkler Superintendant

Foothill Fire Protection, Inc.
09.2005 - 06.2013

Journeyman Fire Sprinkler Systems Installer

Economy Fire Protection
06.2002 - 08.2005

Fire Sprinkler Systems Installer

Foothill Fire Protection, Inc.
07.1999 - 06.2002

Bachelor of Arts - Child Development

California State Fullerton
David Leonard