Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

David Martinez

Bakersfield,CA

Summary

Automation Technician with 18 years of experience with Automated systems, Industrial electrical installations , and motor controls. Possessing in-depth knowledge of PLC/DCS control loops in the oil and gas industry and power generation.

Overview

19
19
years of professional experience
1
1
Certification

Work History

I&E Technician

Chevron
Bakersfield, CA
02.2024 - Current
  • Troubleshooting motor controls and automated control loops.
  • Document all repairs and close all corrective maintenance work orders.
  • Support operations during GE frame 7EA turbine start up.
  • Clean all flame scanners on combustion chamber. Replace Bentley Nevada vibration probes when needed.
  • Calibrate variable inlet guide vanes along with the gas turbine control valves using the Mark VI toolboxST.

Automation Technician

NAES
McKittrick
02.2021 - 02.2024
  • Use DocuWare and Mainsaver software to organize my work orders to carry out my task everyday.
  • Responsible for other companies that work in the plant on PMs or new construction.
  • Mentored and supported new hired technicians on calibrating and troubleshooting continuous emissions monitoring system (CEMS) analyzers.
  • Reviewed all Instrument calibration sheets and closed all the PM work orders in a timely maner.
  • Completed NERC standards PMs on time. Transmission Line Inspections Battery PMs and Dynamic fault recorder.
  • Configure Temperature transmitters using PACTware software and Consoft.
  • Testing and troubleshooting of AC/DC motors and swapped them when needed.
  • Troubleshooting of instruments on the gas turbine, generator, and gas compressor in the power plant.

Automation Technician

Contra Costa Electric IBEW Local 428
Bakersfield, CA
02.2019 - 12.2020
  • Installed 120/208 volt systems and 277/480 volt systems. Following 1387 Chevron standard.
  • Loop check and Start up including red lines. For the reliability Upgrade Project In station 36 Kern River and the CHAN Plant in Lost HIlls.
  • Bend conduit and Stainless steal Tubing. Install and configure new instrument devices pressure, flow, level and temperature.

Automation Technician

Electrical Systems And Instrumentation ESI
Bakersfield, CA
02.2012 - 01.2019
  • Configured and Calibrated Instruments on Automated well Testers AWT. Installed Solenoid Valves as well as adding New Well addresses on the Wonderware software.
  • Build PLC Panels and terminated all the Cables Analog and Discrete. For the Station 36 Reliability Upgrade project.
  • Terminated PLC panels in the Chevron CHAN plant for the Reliability Upgrade project's. Terminated all the transmitters in the plant and loop check with the projects automation engineer.
  • Reviewed drawings added any new specifications or red lines.
  • Preventative Maintenance on Chevron Cogeneration plants.

Automation Technician

KSI DCCK Engineering
Bakersfield, CA
05.2005 - 02.2012
  • Installed instrument devices on many prefabricated skids for Chevron and AERA.
  • Tested the skids after assembly to inspect for leaks
  • Worked in the Fabrication and machine shop repairing all damaged electrical outlets ,plugs,cranes and welding machines.
  • Bend and cut conduit,Pull wire and terminated panelboards and Motors.
  • Worked at the Chevron Kern River Oil field in the AWT upgrade Project.Bended SS Tubing for Pneumatic valves,Pressure,Level and Flow transmitters.

Education

General Electrician Craft Training - Electrical Apprenticeship

Associated Builders & Contractors, Construction Academy
Bakersfield, CA
06.2009

High School Diploma -

Arvin High School
Arvin, CA
07.2000

Skills

  • Troubleshooting
  • Commissioning Support
  • Calibrations
  • Motor Controls
  • Start Up
  • Loop Check

Certification

ISA Certified Control System Technician (CCST)

Certified General Electrician No.146016

Health, Environmental & Safety

  • Have Used Chevron Tenets, See it wheel and 1389A
  • NAES HES team member

Technical Training

  • 2022 QEW
  • PART 75 Continuous Emission Compliance Training
  • NERC Training

Timeline

I&E Technician

Chevron
02.2024 - Current

Automation Technician

NAES
02.2021 - 02.2024

Automation Technician

Contra Costa Electric IBEW Local 428
02.2019 - 12.2020

Automation Technician

Electrical Systems And Instrumentation ESI
02.2012 - 01.2019

Automation Technician

KSI DCCK Engineering
05.2005 - 02.2012

General Electrician Craft Training - Electrical Apprenticeship

Associated Builders & Contractors, Construction Academy

High School Diploma -

Arvin High School
David Martinez