Construction and Painter
Home Services of the Low Country
Hilton Head Island, SC
06.2024 - 07.2024
- Cleaned and properly stored paint equipment and supplies at end of each workday.
- Painted walls and other surfaces using traditional and sprayer methods and worked efficiently to complete jobs within required timeframes.
- Readied surfaces and surrounding areas for painting with sandpaper, tape and other materials.
- Constructed scaffolding and supports to complete work above ground-level.
- Covered floors before prepping, priming and painting walls and ceilings to protect them from chemicals and paint.
- Removed pictures, door knobs or electric switch covers prior to painting.
- Wore protective clothing such as masks, respirators and gloves.