Pulaski Skyway, Kearny, NJ- June, 2022- July, 2024
- Supervised and tracked bridge steel repairs across 13 spans
- Managed small tool inventory and repair
- Assisted with maintenance and protection of traffic (MPT) within the project site
George Washington Bridge, Fort Lee, NJ- July, 2024-October, 2024
- Tracked suspender replacement and main cable rehabilitation
- Directed application of new Methyl Methacrylate surface on recently constructed pedestrian walkway
Portal North Bridge, Coeymans, NY- October, 2024- February, 2025
- Coordinated cable stay installation and stressing on bridge spans
- Collaborated with management team to prepare spans for completion and relocation
- Facilitated in bridge span lifting using self propelled modular transporters to move the span onto designated barges
Portal North Bridge, Kearny, NJ- February, 2025- Present
- Assisted with final bridge span transport
- Oversaw Mammoet heavy equipment yard demobilization
- Prep/Plan cable stay operations for all three arches
- Planning crane operations ranging from 100 ton rough terrain to 300 ton crawlers
- Responsible for writing construction work plan to erect monopole tower
- Execute cable stay stressing