Summary
Overview
Work History
Education
Skills
Timeline
Generic

David Schelmety

Patchogue,NY

Summary

Experienced Roofing Project Manager with many years coordinating large teams on diverse projects. Consistently delivers on time and within budget.

Overview

22
22
years of professional experience

Work History

Journeyman Roofer

NYCHA
Bronx , NY
01.2023 - Current
  • Performed minor repairs on existing roofs such as patching leaks, replacing worn out shingles.
  • Resolved labor, design and tool issues during construction projects.
  • Provided technical advice regarding installation techniques for different types of roof systems to customers when necessary.

also cold aplicated systems such as Kenner para pro sika guard

  • Worked safely and effectively under difficult conditions and completed projects under various kinds of weather.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Applied plastic coatings and membranes, fiberglass or felt over sloped roofs to prepare for shingle installation.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Cleaned up job sites after completion of work and disposed of waste material properly.
  • Maintained and repaired roofing tools and equipment.
  • Diagnosed and identified sources of leaks, developing plans for repairs from total tear-offs to patchwork.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Covered roofs and exterior walls of structures with slate, asphalt, and aluminum with brushes and knives.
  • Set up ladders or scaffolding to safely access roof.
  • Kept production team moving forward for progress in daily site operations.
  • Recommended appropriate insulation material depending on climate conditions in the area.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Checked finished installations for compliance with building codes and customer specifications.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Cut roofing paper to size and nailed and stapled paper to roof in overlapping strips to form base for roofing materials.
  • Operated equipment with strong focus on safety and ground communication.
  • Followed manufacturer specifications to remove old roofing materials and install new roofs.
  • Identified areas requiring additional reinforcement due to weather conditions or load bearing requirements.
  • Repaired and maintained surface materials to make building exteriors weatherproof and waterproof.
  • Repaired and replaced roof membrane, sub roofing, sheathing and base materials.
  • Communicated effectively with supervisors about progress made on assigned projects.
  • Utilized ladders, scaffolds, hoists, power tools, hand tools safely during installation process.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Participated in all phases and types of commercial roofing.
  • Installed underlayment, flashing, drip edge and other components of a roof system to ensure proper drainage of water.
  • Selected necessary materials and calculated dimensions to develop plan appropriate to specifications.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Inspected completed jobs regularly to ensure that they are free from defects.
  • Ensured that all safety regulations were followed on the job site at all times.
  • Overlapped successive layers of roofing material, determining distance of overlap using chalk line, gauge on shingling hatchet and lines on shingles.
  • Applied asphalt-based adhesives or nails to secure shingles in place.
  • Communicated clearly and reliably with foreman and crew leaders, highlighting safety concerns and detailing project progress.
  • Repaired damaged wood surfaces with epoxy fillers before applying new shingles.
  • Mopped and poured hot asphalt and tar onto roof base while applying asphalt and tar and gravel to roof.
  • Cemented and nailed flashing strips of over joints to achieve watertight seals.
  • Organized supplies required for each job accurately so that no time is wasted while working onsite.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Measured and cut shingles as needed to fit around obstacles such as chimneys or skylights.
  • Collaborated with colleagues to complete projects efficiently within deadlines set by clients.
  • Created work crew schedules and delegated assignments.
  • Inspected roofs for damage and deterioration, removed existing roofing materials, and prepared the surface for new shingles.
  • Stayed informed about industry trends related to roof design and construction.
  • Maintained tools and equipment in good condition according to safety standards.
  • Conducted testing of software and systems to ensure quality and reliability.
  • Utilized advanced technical skills and expertise to troubleshoot complex problems and implement solutions.
  • Updated and maintained databases with current information.

Journeyman Roofer/forman

Local 154
Hauppauge, New York
03.2003 - 01.2020
  • Trained and oversaw individuals in roofing system installations.
  • Set up ladders or scaffolding to safely access roof.
  • Added vapor barriers or insulating materials on flat roofs.

Education

High School Diploma -

Hoboken High
Hoboken, NJ
06-1993

Skills

  • Single-ply membranes
  • Slate roofing
  • Waterproofing techniques
  • Roof flashing

Timeline

Journeyman Roofer

NYCHA
01.2023 - Current

Journeyman Roofer/forman

Local 154
03.2003 - 01.2020

High School Diploma -

Hoboken High
David Schelmety