Summary
Overview
Work History
Education
Skills
Timeline
David Augusto Swan

David Augusto Swan

Electrician
Phoenix,AZ

Summary

A dynamic, results-driven Industrial Electrician with exceptional attendance, and attention to detail. Employing a positive approach combined with well-executed industrial electrical Techniques to achieve excellent and sustainable results. Excels in all facets of the work including safety. With the ability to work successfully under extreme conditions. Recognized as a problem solver consistently exceeding performance goals for attendance, and service. Excellence through proven experience in areas of: Blueprint analysis / Job planning Proper technique and attention to detail Problem solving Terminating, EMT, Rigid, CLX Cable and many more. Low and High Voltage Installation of sensors The Ability to learn new fields quickly Honest, Reliable, with exceptional attendants Trouble shooting, Instrumentation Great mechanical skills Installation of sensors For the last four years have been General Foremen or Electrical Supervisor on seven sites, Solar site sizes from 7.5 meg to 265 meg. Objective To secure a Position with a stable and reputable company as a Industrial Electrician( WORKING foreman) Quality-driven General Foreman with success in managing [Number] simultaneous jobs with budgets in excess of $[Amount]. Hardworking and well-organized with thorough approach and uncompromising commitment to quality. Seasoned professional bringing [Number] years of comprehensive experience leading work crews and effectively completing wide variety of commercial and residential construction projects such as [Type].

Overview

25
25
years of professional experience
5
5
Certification

Work History

General Foreman and or Electrical Superintendent

B.H.I. L.l, Vernal Utah
06.2015 - Current
  • I was entirely responsible for day-to-day operations of entire site
  • Building complete solar power generating stations from 7.5 to 265 megs
  • Responsibilities included reading blueprints, redlining blueprints, overseeing 62 workers, scheduling work, and direct interface with customer
  • The scope of work included, overhead and underground electrical, placement of all equipment and installation of all equipment including the control buildings.

Working Foreman Industrial Electrician

Oil, Strike L.L.C
07.2014 - 05.2015
  • All aspects of setting up and installing a new oil site including lining out other electricians
  • Instrumentation, tubing, motors, starters, wiring and Termination, Rigid, EMT, Okonite,
  • High voltage Termination, Cold shrink, reading blue prints
  • Interfacing with Shell representatives, responsible for all safety paper work and work permits
  • Evaluation of new electricians on the job mentoring personnel that needed it
  • Installation of instrumentation and sensors including LSH, HLS,HHS,PIT and limit switches, Pressure switches
  • Including start-up and instruments testing
  • As of late overseeing installations of Pump Jacks, lack skids; ESP’s and site upgrades.

Working Foreman Industrial Electrician

Berry Brothers Construction Pecos
01.2014 - 07.2014
  • All aspects of setting up and installing new oil site including lining out other electricians
  • Instrumentation, tubing, motors, starters, wiring and Termination, Rigid, EMT, Okenite,
  • High voltage Termination, Cold shrink, reading blueprints
  • Interfacing with Shell representatives, responsible for all safety paperwork and work permits.

Working Foreman Industrial Electrician

Strike L.L.C
06.2013 - 01.2014
  • All aspects of setting up and installing a new oil site including lining out other electricians
  • Instrumentation, tubing, motors, starters, wiring and Termination, Rigid, EMT, Okonite,
  • High voltage Termination, Cold shrink, reading blue prints
  • Interfacing with Shell representatives, responsible for all safety paper work and work permits
  • Evaluation of new electricians on the job mentoring personnel that needed it
  • Installation of instrumentation and sensors including LSH, HLS,HHS,PIT and limit switches, Pressure switches
  • Including start-up and instruments testing
  • As of late overseeing installations of Pump Jacks, lack skids; ESP’s and site upgrades.

Lead Industrial Electrician

Shell, B.H.I
08.2012 - 05.2013
  • All aspects of setting up and installing a new oil site including lining out other electricians
  • Instrumentation, tubing, motors, starters, wiring and Termination, Rigid, EMT, Okonite,
  • High voltage Termination, Cold shrink, reading blue prints
  • Interfacing with Shell representatives, responsible for all safety paper work and work permits
  • Evaluation of new electricians on the job mentoring personnel that needed it
  • Installation of instrumentation and sensors including LSH, HLS, and limit switches, Pressure switches.

Industrial Electrician

Denny’s Electric
03.2012 - 08.2012
  • Installation and inventory control of all materials for the oil site we were working on at the time
  • All aspects of Installation of a new oil site for Marathon, including the final Q.C
  • Walk thru and punch list
  • Evaluation of new electricians on the job mentoring the personnel that needed it
  • Conduit, tray, terminations and heat trace.

Industrial Electrician

Berger Electric
10.2011 - 03.2012
  • Installation and inventory control of all materials for the oil site we were working on at the time
  • Okonite, Transformers, cold shrink, terminations, Seal Tight, Rigid
  • Conduit, tray, terminations and heat trace.

Industrial Electrician

Crown Engineering & Construction, Inc
01.2010 - 02.2012
  • (Bi-fuel Power Plant), Low and High Voltage Installation of sensors,
  • Refurbish Power Plant, working with 4160 or higher, Installation of DC
  • Motors 40hp and higher
  • Rigid, Termination, Crush cones, and supervised additional employees
  • Installation of instrumentation and sensors including moister, pick-up, and limit switches.

Commercial Electrician

Tierra Summit Contractors
10.2005 - 11.2009
  • Large Commercial, Class 1 Division 1 and 2, Transformers
  • EMT, Termination, Supervised additional employees in charge of Circuits layout, and installation for all refrigeration and coolers.

HVAC Technician/ Electrician

Yolo Valley AC & Heating
04.1998 - 09.2005
  • All aspects of HVAC including trouble shooting lay out, installation Of Package and split systems.

Education

Shell Load Securement Training-OSHA 10 (10-10-2009 -

OSHA 40 Hazmat-OSHA 30 (both)-APEC SAFELAND (11-11

Skills

  • Residential and Commercial Projects
  • Workplace Safety
  • Cost Estimation
  • OSHA Compliance
  • Worker Supervision
  • Time Management
  • Effective Communication
  • Job Planning
  • Customer Experience
  • Detail Work
  • Electrical Installations
  • Testing Activities

Timeline

General Foreman and or Electrical Superintendent - B.H.I. L.l, Vernal Utah
06.2015 - Current
Working Foreman Industrial Electrician - Oil, Strike L.L.C
07.2014 - 05.2015
Working Foreman Industrial Electrician - Berry Brothers Construction Pecos
01.2014 - 07.2014
Working Foreman Industrial Electrician - Strike L.L.C
06.2013 - 01.2014
Lead Industrial Electrician - Shell, B.H.I
08.2012 - 05.2013
Industrial Electrician - Denny’s Electric
03.2012 - 08.2012
Industrial Electrician - Berger Electric
10.2011 - 03.2012
Industrial Electrician - Crown Engineering & Construction, Inc
01.2010 - 02.2012
Commercial Electrician - Tierra Summit Contractors
10.2005 - 11.2009
HVAC Technician/ Electrician - Yolo Valley AC & Heating
04.1998 - 09.2005
OSHA 40 Hazmat-OSHA 30 (both)-APEC SAFELAND (11-11 - Shell Load Securement Training-OSHA 10 (10-10-2009,
David Augusto SwanElectrician